메뉴 건너뛰기




Volumn , Issue , 2007, Pages 159-164

Multi-objective semiconductor manufacturing scheduling: A random keys implementation of NSGA-II

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; PROBLEM SOLVING; SEMICONDUCTOR MATERIALS; TIME MEASUREMENT;

EID: 34548778037     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SCIS.2007.367684     Document Type: Conference Paper
Times cited : (12)

References (15)
  • 1
    • 0007992513 scopus 로고
    • Recent developments in deterministic sequencing and scheduling: A survey
    • edited by M. A.H. Dempster, J.K. Lenstra and A.H.G. Rinnooy Kan, Reidel, Dordrecht
    • Lawler, E.L., Lenstra, J.K. and Rinnooy Kan, A.H.G., Recent developments in deterministic sequencing and scheduling: a survey. In Deterministic and Stochastic Scheduling, edited by M. A.H. Dempster, J.K. Lenstra and A.H.G. Rinnooy Kan, (1982), 35-73 (Reidel, Dordrecht).
    • (1982) Deterministic and Stochastic Scheduling , pp. 35-73
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 4
    • 0000688623 scopus 로고
    • A general class of bulk queues with Poisson input
    • M. F. Neuts, A general class of bulk queues with Poisson input. Annals of Mathematical Statistics, 38 (1967) 759-770.
    • (1967) Annals of Mathematical Statistics , vol.38 , pp. 759-770
    • Neuts, M.F.1
  • 5
    • 0036612129 scopus 로고    scopus 로고
    • The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions
    • L. Solomon, J. Fowler, M. Pfund and P. Jensen, The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions, Journal of Electronics Manufacturing, 11 (2) (2002), 149-159.
    • (2002) Journal of Electronics Manufacturing , vol.11 , Issue.2 , pp. 149-159
    • Solomon, L.1    Fowler, J.2    Pfund, M.3    Jensen, P.4
  • 8
    • 0027648685 scopus 로고
    • An improved methodology for real-time production decision at batch-process work stations
    • W.W. Weng and R.C. Leachman, An improved methodology for real-time production decision at batch-process work stations, IEEE Transactions on Semiconductor Manufacturing, 6 ( 1993), 219-225.
    • (1993) IEEE Transactions on Semiconductor Manufacturing , vol.6 , pp. 219-225
    • Weng, W.W.1    Leachman, R.C.2
  • 9
    • 0029341463 scopus 로고
    • The use of upstream and downstream information in scheduling semiconductor batch operations
    • J.K. Robinson, J. W. Fowler and J.F. Bard, The use of upstream and downstream information in scheduling semiconductor batch operations, International Journal of Production Research., 33 (7) (1995), 1849-1869.
    • (1995) International Journal of Production Research , vol.33 , Issue.7 , pp. 1849-1869
    • Robinson, J.K.1    Fowler, J.W.2    Bard, J.F.3
  • 10
    • 0035358224 scopus 로고    scopus 로고
    • A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System
    • J. Jang, J. Suh, M. Park, and R. Liu, A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System, The International Journal of Flexible Manufacturing Systems, 13 (2001), 287-308.
    • (2001) The International Journal of Flexible Manufacturing Systems , vol.13 , pp. 287-308
    • Jang, J.1    Suh, J.2    Park, M.3    Liu, R.4
  • 11
    • 0031076549 scopus 로고    scopus 로고
    • Improving job shop performance by coordinating dispatching rules
    • O. Holthaus and H. Ziegler, Improving job shop performance by coordinating dispatching rules, International Journal of Production Research, 35 (2) (1997), 539-549.
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 539-549
    • Holthaus, O.1    Ziegler, H.2
  • 12
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Bean, J.C., Genetic algorithms and random keys for sequencing and optimization, ORSA Journal on Computing, 6 (1994), 154-160.
    • (1994) ORSA Journal on Computing , vol.6 , pp. 154-160
    • Bean, J.C.1
  • 13
    • 0033101911 scopus 로고    scopus 로고
    • A genetic algorithm methodology for complex scheduling problems
    • Norman, B.A. and Bean, J.C., A genetic algorithm methodology for complex scheduling problems, Naval Research Logistics, 46 (1999), 199-211.
    • (1999) Naval Research Logistics , vol.46 , pp. 199-211
    • Norman, B.A.1    Bean, J.C.2
  • 14
    • 0036778940 scopus 로고    scopus 로고
    • A genetic algorithm to minimize maximum lateness on a batch processing machine
    • Wang, C-S. and Uzsoy, R., A genetic algorithm to minimize maximum lateness on a batch processing machine, Computers & Operations Research, 29 (2002), 1621-1640.
    • (2002) Computers & Operations Research , vol.29 , pp. 1621-1640
    • Wang, C.-S.1    Uzsoy, R.2
  • 15
    • 2942674864 scopus 로고    scopus 로고
    • Scheduling flexible flow lines with sequence-dependent setup times
    • Kurz, M.E. and Askin, R.G., Scheduling flexible flow lines with sequence-dependent setup times, European Journal of Operational Research, 159 (1) (2004), 66-82.
    • (2004) European Journal of Operational Research , vol.159 , Issue.1 , pp. 66-82
    • Kurz, M.E.1    Askin, R.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.