-
1
-
-
0007992513
-
Recent developments in deterministic sequencing and scheduling: A survey
-
edited by M. A.H. Dempster, J.K. Lenstra and A.H.G. Rinnooy Kan, Reidel, Dordrecht
-
Lawler, E.L., Lenstra, J.K. and Rinnooy Kan, A.H.G., Recent developments in deterministic sequencing and scheduling: a survey. In Deterministic and Stochastic Scheduling, edited by M. A.H. Dempster, J.K. Lenstra and A.H.G. Rinnooy Kan, (1982), 35-73 (Reidel, Dordrecht).
-
(1982)
Deterministic and Stochastic Scheduling
, pp. 35-73
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
3
-
-
0036530772
-
A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II
-
Kalyanmoy Deb, Amrit Pratap, Sameer Agarwal, and T. Meyarivan, A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II, IEEE Transactions On Evolutionary Computation. 6 (2) (2002) 182-197.
-
(2002)
IEEE Transactions On Evolutionary Computation
, vol.6
, Issue.2
, pp. 182-197
-
-
Deb, K.1
Pratap, A.2
Agarwal, S.3
Meyarivan, T.4
-
4
-
-
0000688623
-
A general class of bulk queues with Poisson input
-
M. F. Neuts, A general class of bulk queues with Poisson input. Annals of Mathematical Statistics, 38 (1967) 759-770.
-
(1967)
Annals of Mathematical Statistics
, vol.38
, pp. 759-770
-
-
Neuts, M.F.1
-
5
-
-
0036612129
-
The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions
-
L. Solomon, J. Fowler, M. Pfund and P. Jensen, The inclusion of future arrivals and downstream setups into wafer fabrication batch processing decisions, Journal of Electronics Manufacturing, 11 (2) (2002), 149-159.
-
(2002)
Journal of Electronics Manufacturing
, vol.11
, Issue.2
, pp. 149-159
-
-
Solomon, L.1
Fowler, J.2
Pfund, M.3
Jensen, P.4
-
7
-
-
0026866908
-
Real time control of multiproduct bulk service semiconductor manufacturing processes
-
J.W. Fowler, D.T. Phillips and G.L. Hogg, Real time control of multiproduct bulk service semiconductor manufacturing processes, IEEE Transactions on Semiconductor Manufacturing, 5 (2) (1992),158-163.
-
(1992)
IEEE Transactions on Semiconductor Manufacturing
, vol.5
, Issue.2
, pp. 158-163
-
-
Fowler, J.W.1
Phillips, D.T.2
Hogg, G.L.3
-
8
-
-
0027648685
-
An improved methodology for real-time production decision at batch-process work stations
-
W.W. Weng and R.C. Leachman, An improved methodology for real-time production decision at batch-process work stations, IEEE Transactions on Semiconductor Manufacturing, 6 ( 1993), 219-225.
-
(1993)
IEEE Transactions on Semiconductor Manufacturing
, vol.6
, pp. 219-225
-
-
Weng, W.W.1
Leachman, R.C.2
-
9
-
-
0029341463
-
The use of upstream and downstream information in scheduling semiconductor batch operations
-
J.K. Robinson, J. W. Fowler and J.F. Bard, The use of upstream and downstream information in scheduling semiconductor batch operations, International Journal of Production Research., 33 (7) (1995), 1849-1869.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.7
, pp. 1849-1869
-
-
Robinson, J.K.1
Fowler, J.W.2
Bard, J.F.3
-
10
-
-
0035358224
-
A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System
-
J. Jang, J. Suh, M. Park, and R. Liu, A Look-Ahead Routing Procedure for Machine Selection in a Highly Informative Manufacturing System, The International Journal of Flexible Manufacturing Systems, 13 (2001), 287-308.
-
(2001)
The International Journal of Flexible Manufacturing Systems
, vol.13
, pp. 287-308
-
-
Jang, J.1
Suh, J.2
Park, M.3
Liu, R.4
-
11
-
-
0031076549
-
Improving job shop performance by coordinating dispatching rules
-
O. Holthaus and H. Ziegler, Improving job shop performance by coordinating dispatching rules, International Journal of Production Research, 35 (2) (1997), 539-549.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.2
, pp. 539-549
-
-
Holthaus, O.1
Ziegler, H.2
-
12
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean, J.C., Genetic algorithms and random keys for sequencing and optimization, ORSA Journal on Computing, 6 (1994), 154-160.
-
(1994)
ORSA Journal on Computing
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
-
13
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
Norman, B.A. and Bean, J.C., A genetic algorithm methodology for complex scheduling problems, Naval Research Logistics, 46 (1999), 199-211.
-
(1999)
Naval Research Logistics
, vol.46
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
-
14
-
-
0036778940
-
A genetic algorithm to minimize maximum lateness on a batch processing machine
-
Wang, C-S. and Uzsoy, R., A genetic algorithm to minimize maximum lateness on a batch processing machine, Computers & Operations Research, 29 (2002), 1621-1640.
-
(2002)
Computers & Operations Research
, vol.29
, pp. 1621-1640
-
-
Wang, C.-S.1
Uzsoy, R.2
-
15
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
Kurz, M.E. and Askin, R.G., Scheduling flexible flow lines with sequence-dependent setup times, European Journal of Operational Research, 159 (1) (2004), 66-82.
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.1
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
|