메뉴 건너뛰기




Volumn 18, Issue 7, 2007, Pages 573-583

Production planning for remanufactured products

Author keywords

MRP; Production planning; Variable processing time; Variable yield rate

Indexed keywords

MANUFACTURE; PLANNING; PROBABILITY;

EID: 34548539397     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280701542210     Document Type: Article
Times cited : (55)

References (22)
  • 1
    • 0026927325 scopus 로고
    • Ordering policies in an environment of stochastic yields and substitutable demands
    • Bitran, G. R. and Dasu, S., Ordering policies in an environment of stochastic yields and substitutable demands. Oper. Res., 1992, 40, 999-1017.
    • (1992) Oper. Res , vol.40 , pp. 999-1017
    • Bitran, G.R.1    Dasu, S.2
  • 2
    • 0019913634 scopus 로고
    • Improved heuristics for multistage requirements planning systems
    • Blackburn, J.D. and Millen, R.A., Improved heuristics for multistage requirements planning systems. Manag. Sci., 1982, 28, 44-56.
    • (1982) Manag. Sci , vol.28 , pp. 44-56
    • Blackburn, J.D.1    Millen, R.A.2
  • 3
    • 0023288854 scopus 로고
    • A simulation study of MRP capacity planning with uncertain operation times
    • Cheng, T.C.E., A simulation study of MRP capacity planning with uncertain operation times. Int. J. Prod. Res., 1987, 25, 245-257.
    • (1987) Int. J. Prod. Res , vol.25 , pp. 245-257
    • Cheng, T.C.E.1
  • 4
    • 0031232866 scopus 로고    scopus 로고
    • Control of a stochastic production system with estimated parameters
    • Denardo, E. and Tang, C.S., Control of a stochastic production system with estimated parameters. Manag. Sci., 1997, 43, 1296-1307.
    • (1997) Manag. Sci , vol.43 , pp. 1296-1307
    • Denardo, E.1    Tang, C.S.2
  • 5
    • 0035384298 scopus 로고    scopus 로고
    • A heuristic approach to the batch sizing problem
    • DePuy, G.W. and Usher, J.S., A heuristic approach to the batch sizing problem. Prod. Plan. & Cont., 2001, 12(4), 372-378.
    • (2001) Prod. Plan. & Cont , vol.12 , Issue.4 , pp. 372-378
    • DePuy, G.W.1    Usher, J.S.2
  • 7
    • 0034272624 scopus 로고    scopus 로고
    • Control of a manufacturing system with random product yield and downward substitutability
    • Duenyas, I. and Tsai, C., Control of a manufacturing system with random product yield and downward substitutability. HE Trans., 2000, 32, 785-795.
    • (2000) HE Trans , vol.32 , pp. 785-795
    • Duenyas, I.1    Tsai, C.2
  • 8
    • 0028396352 scopus 로고
    • Lot-sizing in assembly systems with random component yields
    • Gerchak, Y., Wang, Y.Z. and Yano, C.A., Lot-sizing in assembly systems with random component yields. IIE Trans., 1994, 26, 19-24.
    • (1994) IIE Trans , vol.26 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.Z.2    Yano, C.A.3
  • 9
    • 3042545957 scopus 로고    scopus 로고
    • Supply management in assembly systems with random yield and random demand
    • Gurnani, H., Akella, R. and Leehoczky, J., Supply management in assembly systems with random yield and random demand. IIE Trans., 2000, 32, 701-714.
    • (2000) IIE Trans , vol.32 , pp. 701-714
    • Gurnani, H.1    Akella, R.2    Leehoczky, J.3
  • 10
    • 0030871134 scopus 로고    scopus 로고
    • Guide, Jr, V.D.R., Srivastava, R. and Spencer, M.S., An evaluation of capacity planning techniques in a remanufacturing environment. Int. J. Prod. Res., 1997, 5(1), 67-82.
    • Guide, Jr, V.D.R., Srivastava, R. and Spencer, M.S., An evaluation of capacity planning techniques in a remanufacturing environment. Int. J. Prod. Res., 1997, 5(1), 67-82.
  • 11
    • 0033358107 scopus 로고    scopus 로고
    • Issues in environmentally conscious manufacturing and product recovery: A survey
    • Gungor, A. and Gupta, S., Issues in environmentally conscious manufacturing and product recovery: a survey. Comput. & Indust. Eng., 1999, 36, 811-853.
    • (1999) Comput. & Indust. Eng , vol.36 , pp. 811-853
    • Gungor, A.1    Gupta, S.2
  • 12
    • 0023979032 scopus 로고
    • Production control in multistage systems with variable yield losses
    • Lee, H.L. and Yano, C.A., Production control in multistage systems with variable yield losses. Oper. Res., 1988, 36, 269-278.
    • (1988) Oper. Res , vol.36 , pp. 269-278
    • Lee, H.L.1    Yano, C.A.2
  • 18
    • 4344627861 scopus 로고    scopus 로고
    • Economic evaluation of disassembly processes in remanufacturing systems
    • Tang, O., Grubbstrom, R.W. and Zanoni, S., Economic evaluation of disassembly processes in remanufacturing systems. Int. J. Prod. Res., 2004, 42, 3603-3617.
    • (2004) Int. J. Prod. Res , vol.42 , pp. 3603-3617
    • Tang, O.1    Grubbstrom, R.W.2    Zanoni, S.3
  • 19
    • 9544249379 scopus 로고    scopus 로고
    • Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns
    • Tang, O. and Grubbstrom, R.W., Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns. Int. J. Prod. Econ., 2005, 93/94, 285-300.
    • (2005) Int. J. Prod. Econ , vol.93-94 , pp. 285-300
    • Tang, O.1    Grubbstrom, R.W.2
  • 21
    • 0001198301 scopus 로고
    • Lot sizing with random yields: A review
    • Yano, C.A. and Lee, H.L., Lot sizing with random yields: a review. Oper. Res., 1995, 43, 311-334.
    • (1995) Oper. Res , vol.43 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 22
    • 0024137576 scopus 로고
    • Optimal run quantities for an assembly system with random yields
    • Yao, D.D., Optimal run quantities for an assembly system with random yields. HE Trans., 1988, 20, 399-403.
    • (1988) HE Trans , vol.20 , pp. 399-403
    • Yao, D.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.