메뉴 건너뛰기




Volumn 18, Issue 3, 2007, Pages 283-297

Alternative models for solving single-machine scheduling with tool changes

Author keywords

Availability constraints; Integer programming; Scheduling; Single CNC machine; Tool changes

Indexed keywords

INTEGER PROGRAMMING; MACHINE TOOLS; MATHEMATICAL MODELS; PREVENTIVE MAINTENANCE; SCHEDULING;

EID: 34548536349     PISSN: 10171819     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (10)
  • 1
    • 0030263614 scopus 로고    scopus 로고
    • Tool allocation and machining conditions optimization for CNC machines
    • Akturk, M. S. and Avci, S., Tool allocation and machining conditions optimization for CNC machines, European Journal of Operational Research, Vol.94, pp.335-348, 1996.
    • (1996) European Journal of Operational Research , vol.94 , pp. 335-348
    • Akturk, M.S.1    Avci, S.2
  • 2
    • 0037316821 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance
    • Akturk, M. S., Ghosh, J. B. and Gunes, E. D., Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance, Naval Research Logistics, Vol.50, pp.15-30, 2002.
    • (2002) Naval Research Logistics , vol.50 , pp. 15-30
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 3
    • 2342558624 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: Basic results and SPT performance
    • Akturk, M. S., Ghosh, J. B. and Gunes, E. D., Scheduling with tool changes to minimize total completion time: Basic results and SPT performance, European Journal of Operational Research, Vol.157, pp.784-790, 2004.
    • (2004) European Journal of Operational Research , vol.157 , pp. 784-790
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 4
    • 21844487443 scopus 로고
    • Scheduling a flexible manufacturing system with tooling constraints: An actual case study
    • Flanders, S. W. and Davis, W. J., Scheduling a flexible manufacturing system with tooling constraints: An actual case study, Interfaces, Vol.25, pp.42-54, 1995.
    • (1995) Interfaces , vol.25 , pp. 42-54
    • Flanders, S.W.1    Davis, W.J.2
  • 5
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray, E., Seidmann, A. and Stecke, K. E., A synthesis of decision models for tool management in automated manufacturing, Management Science, Vol.39, pp.549-567, 1993.
    • (1993) Management Science , vol.39 , pp. 549-567
    • Gray, E.1    Seidmann, A.2    Stecke, K.E.3
  • 7
    • 0030780314 scopus 로고    scopus 로고
    • A study of integer programming formulations for scheduling problems
    • Pan, C. H., A study of integer programming formulations for scheduling problems, International Journal of Systems Science, Vol.28, pp.33-41, 1997.
    • (1997) International Journal of Systems Science , vol.28 , pp. 33-41
    • Pan, C.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.