메뉴 건너뛰기




Volumn 18, Issue 7, 2007, Pages 610-625

Judicious order acceptance and order release in make-to-order manufacturing systems

Author keywords

Discrete event simulation; Due date performance; Input control; Order review and release; Workload control

Indexed keywords

CONTROL SYSTEMS; DISCRETE EVENT SIMULATION; MANUFACTURE;

EID: 34548524876     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280701582422     Document Type: Article
Times cited : (18)

References (24)
  • 1
    • 1642440941 scopus 로고
    • Even flow: A scheduling method for reducing lateness in the job shop
    • Ackerman, S.S., Even flow: a scheduling method for reducing lateness in the job shop. Manag. Technol., 1963, 3(1), 20-32.
    • (1963) Manag. Technol , vol.3 , Issue.1 , pp. 20-32
    • Ackerman, S.S.1
  • 2
    • 0040810386 scopus 로고
    • Scheduling and order release in a single-stage production system
    • Ashby, J.R. and Uzsoy, R., Scheduling and order release in a single-stage production system. J. Manuf. Syst., 1995, 14(4), 290-306.
    • (1995) J. Manuf. Syst , vol.14 , Issue.4 , pp. 290-306
    • Ashby, J.R.1    Uzsoy, R.2
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker, K.R., Sequencing rules and due-date assignments in a job shop. Manag. Sci., 1984, 30, 1093-1104.
    • (1984) Manag. Sci , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 4
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J.W.M., The use of workload information to control job lateness in controlled and uncontrolled release production systems. J. Oper. Manag., 1983, 3(2), 79-92.
    • (1983) J. Oper. Manag , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 5
    • 38249025236 scopus 로고
    • Work release strategies in a dual resource constrained job shop
    • Bobrowski, P.M. and Park, P.S., Work release strategies in a dual resource constrained job shop. Omega, 1989, 17(2), 177-188.
    • (1989) Omega , vol.17 , Issue.2 , pp. 177-188
    • Bobrowski, P.M.1    Park, P.S.2
  • 6
    • 0017466168 scopus 로고
    • A classified bibliography of research on optimal design and control of queues
    • Crabill, T.B., Gross, D. and Magazine, MJ., A classified bibliography of research on optimal design and control of queues. Oper. Res., 1977, 25(2), 219-232.
    • (1977) Oper. Res , vol.25 , Issue.2 , pp. 219-232
    • Crabill, T.B.1    Gross, D.2    Magazine, M.J.3
  • 8
    • 0029323273 scopus 로고
    • Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop
    • Fredendall, L.D. and Melnyk, S.A., Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop. Int. J. Prod. Res., 1995, 33(6), 1521-1534.
    • (1995) Int. J. Prod. Res , vol.33 , Issue.6 , pp. 1521-1534
    • Fredendall, L.D.1    Melnyk, S.A.2
  • 9
    • 0016319331 scopus 로고
    • A loading and balancing methodology for job shop control
    • Irastorza, J.C. and Deane, R.H., A loading and balancing methodology for job shop control. AIIE Trans., 1974, 6(4), 302-307.
    • (1974) AIIE Trans , vol.6 , Issue.4 , pp. 302-307
    • Irastorza, J.C.1    Deane, R.H.2
  • 10
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • Kanet, J.J., Load-limited order release in job shop scheduling systems. J. Oper. Manag., 1988, 7(3), 44-58.
    • (1988) J. Oper. Manag , vol.7 , Issue.3 , pp. 44-58
    • Kanet, J.J.1
  • 11
    • 0016533472 scopus 로고
    • Applying a new device in the optimisation of exponential queuing systems
    • Lippman, S.A., Applying a new device in the optimisation of exponential queuing systems. Oper. Res., 1975, 23, 687-710.
    • (1975) Oper. Res , vol.23 , pp. 687-710
    • Lippman, S.A.1
  • 12
    • 0024700372 scopus 로고
    • Order review/release: Research issues and perspectives
    • Melnyk, S.A. and Ragatz, G.L., Order review/release: Research issues and perspectives. Int. J. Prod. Res., 1989, 27(7), 1081-1096.
    • (1989) Int. J. Prod. Res , vol.27 , Issue.7 , pp. 1081-1096
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 13
    • 0023831761 scopus 로고
    • Order review/release and its impact on the shop floor
    • Melnyk, S.A. and Ragatz, G.L., Order review/release and its impact on the shop floor. Prod. & Invent. Manag. J., 1988, 29(2), 13-17.
    • (1988) Prod. & Invent. Manag. J , vol.29 , Issue.2 , pp. 13-17
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 14
    • 0028436792 scopus 로고
    • Evaluating variance control, order review/release and dispatching: A regression analysis
    • Melnyk, S.A., Tan, K.C., Denzler, D.R. and Fredendall, L., Evaluating variance control, order review/release and dispatching: A regression analysis. Int. J. Prod. Res., 1994, 32(32), 1045-1061.
    • (1994) Int. J. Prod. Res , vol.32 , Issue.32 , pp. 1045-1061
    • Melnyk, S.A.1    Tan, K.C.2    Denzler, D.R.3    Fredendall, L.4
  • 15
    • 0000696160 scopus 로고
    • A queueing reward system with several customer classes
    • Miller, B.I., A queueing reward system with several customer classes. Manag. Sci., 1969, 16, 234-245.
    • (1969) Manag. Sci , vol.16 , pp. 234-245
    • Miller, B.I.1
  • 17
    • 0026953379 scopus 로고
    • Capacity-based order review/release strategies to improve manufacturing performance
    • Philipoom, P.R. and Fry, T.D., Capacity-based order review/release strategies to improve manufacturing performance. Int. J. Prod. Res., 1992, 30(11), 2559-2572.
    • (1992) Int. J. Prod. Res , vol.30 , Issue.11 , pp. 2559-2572
    • Philipoom, P.R.1    Fry, T.D.2
  • 18
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job shop environment
    • Ragatz, G.L. and Mabert, V.A., An evaluation of order release mechanisms in a job shop environment. Deci. Sci., 1988, 19(2), 167-189.
    • (1988) Deci. Sci , vol.19 , Issue.2 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 19
    • 1642563614 scopus 로고
    • A queueing process with some discrimination
    • Scott, M., A queueing process with some discrimination. Manag. Sci., 1969, 16, 227-233.
    • (1969) Manag. Sci , vol.16 , pp. 227-233
    • Scott, M.1
  • 20
    • 0021467239 scopus 로고
    • Input scheduling and load balance for job shop
    • Shimoyashiro, S., Isoda, K. and Awane, H., Input scheduling and load balance for job shop. Int. J. Prod. Res., 1984, 22(4), 597-605.
    • (1984) Int. J. Prod. Res , vol.22 , Issue.4 , pp. 597-605
    • Shimoyashiro, S.1    Isoda, K.2    Awane, H.3
  • 21
    • 0016474029 scopus 로고
    • D-optimality for regression designs: A review
    • St. John, R.C. and Draper, N.R., D-optimality for regression designs: A review. Technometrics, 1975, 17(1), 15-23.
    • (1975) Technometrics , vol.17 , Issue.1 , pp. 15-23
    • St. John, R.C.1    Draper, N.R.2
  • 22
    • 0000351599 scopus 로고
    • Towards a better understanding of order acceptance
    • ten Kate, H.A., Towards a better understanding of order acceptance. Int. J. Prod. Econ., 1994, 37, 139-152.
    • (1994) Int. J. Prod. Econ , vol.37 , pp. 139-152
    • ten Kate, H.A.1
  • 23
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environments with setup times and due dates
    • Wester, F.A.W., Wijngaard, J. and Zijm, W.H.M., Order acceptance strategies in a production-to-order environments with setup times and due dates. Int. J. Prod. Res., 1992, 30(6), 1313-1326.
    • (1992) Int. J. Prod. Res , vol.30 , Issue.6 , pp. 1313-1326
    • Wester, F.A.W.1    Wijngaard, J.2    Zijm, W.H.M.3
  • 24
    • 0002274219 scopus 로고
    • Input/output control a real handle on lead time
    • Wight, O., Input/output control a real handle on lead time. Prod. & Invent. Manag., 1970, 11(3), 9-31.
    • (1970) Prod. & Invent. Manag , vol.11 , Issue.3 , pp. 9-31
    • Wight, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.