메뉴 건너뛰기




Volumn 184, Issue 2, 2008, Pages 711-724

Dynamic lot-sizing model for major and minor demands

Author keywords

Agreeable time windows; Dynamic programming; Lot sizing; Major minor demands; Production

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; COST EFFECTIVENESS; DYNAMIC PROGRAMMING; PLANNING; PRODUCTION;

EID: 34548491847     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.11.017     Document Type: Article
Times cited : (6)

References (23)
  • 1
    • 0001233812 scopus 로고
    • Improved algorithms for economic lot-size problems
    • Aggarwal A., and Park J.K. Improved algorithms for economic lot-size problems. Operations Research 14 (1993) 549-571
    • (1993) Operations Research , vol.14 , pp. 549-571
    • Aggarwal, A.1    Park, J.K.2
  • 4
    • 34548471905 scopus 로고    scopus 로고
    • Dauzère-Pérès, S., Brahimi, N., Najid, N.M., Nordli, A., 2002. The single-item lot sizing problem with time windows. Technical Report 02/4/AUTO, Ecole des Mines de Nantes.
  • 5
    • 0026208005 scopus 로고
    • A simple forward algorithm to solve general dynamic lot sizing models with n periods in O (n log n) or O (n) time
    • Federgruen A., and Tzur M. A simple forward algorithm to solve general dynamic lot sizing models with n periods in O (n log n) or O (n) time. Management Science 37 (1991) 909-925
    • (1991) Management Science , vol.37 , pp. 909-925
    • Federgruen, A.1    Tzur, M.2
  • 6
    • 0002144134 scopus 로고
    • Deterministic production planning with concave costs and capacity constraints
    • Florian M., and Klein M. Deterministic production planning with concave costs and capacity constraints. Management Science 18 (1971) 12-20
    • (1971) Management Science , vol.18 , pp. 12-20
    • Florian, M.1    Klein, M.2
  • 7
    • 0019032810 scopus 로고
    • Deterministic production planning: Algorithms and complexity
    • Florian M., Lenstra J.K., and Rinnooy Kan A.H.G. Deterministic production planning: Algorithms and complexity. Management Science 26 (1980) 669-679
    • (1980) Management Science , vol.26 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 8
    • 0032169180 scopus 로고    scopus 로고
    • Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies
    • Hausman W.H., Lee H.L., and Zhang A.X. Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies. European Journal of Operational Research 109 (1998) 646-659
    • (1998) European Journal of Operational Research , vol.109 , pp. 646-659
    • Hausman, W.H.1    Lee, H.L.2    Zhang, A.X.3
  • 9
    • 33845304679 scopus 로고    scopus 로고
    • An efficient procedure for dynamic lot-sizing model with demand time windows
    • Hwang H.-C. An efficient procedure for dynamic lot-sizing model with demand time windows. Journal of Global Optimization 37 (2007) 11-26
    • (2007) Journal of Global Optimization , vol.37 , pp. 11-26
    • Hwang, H.-C.1
  • 10
    • 32644445781 scopus 로고    scopus 로고
    • A dynamic lot-sizing model with demand time windows and speculative cost structure
    • Hwang H.-C., and Jaruphongsa W. A dynamic lot-sizing model with demand time windows and speculative cost structure. Operations Research Letters 34 (2006) 251-256
    • (2006) Operations Research Letters , vol.34 , pp. 251-256
    • Hwang, H.-C.1    Jaruphongsa, W.2
  • 11
    • 5744227918 scopus 로고    scopus 로고
    • Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain
    • Jaruphongsa W., Çetinkaya S., and Lee C.-Y. Warehouse space capacity and delivery time window considerations in dynamic lot-sizing for a simple supply chain. International Journal of Production Economics 92 (2004) 169-180
    • (2004) International Journal of Production Economics , vol.92 , pp. 169-180
    • Jaruphongsa, W.1    Çetinkaya, S.2    Lee, C.-Y.3
  • 12
  • 13
    • 0001705761 scopus 로고
    • Bounded production and inventory models with piecewise concave costs
    • Love S.F. Bounded production and inventory models with piecewise concave costs. Management Science 20 (1973) 313-318
    • (1973) Management Science , vol.20 , pp. 313-318
    • Love, S.F.1
  • 14
    • 0016509152 scopus 로고
    • A deterministic multi-period production planning model with piecewise concave production and holding backlogging costs
    • Swoveland C. A deterministic multi-period production planning model with piecewise concave production and holding backlogging costs. Management Science 21 (1975) 1007-1013
    • (1975) Management Science , vol.21 , pp. 1007-1013
    • Swoveland, C.1
  • 15
    • 0001491020 scopus 로고    scopus 로고
    • 3) algorithm for the economic lot-sizing problem with constant capacities
    • 3) algorithm for the economic lot-sizing problem with constant capacities. Management Science 42 (1996) 142-150
    • (1996) Management Science , vol.42 , pp. 142-150
    • Van Hoesel, C.P.M.1    Wagelmans, A.P.M.2
  • 16
    • 0000495984 scopus 로고
    • Economic lot sizing: An O (n log n) algorithm that runs in linear time in the Wagner Whitin case
    • Wagelmans A.P.M., Van Hoesel C.P.M., and Kolen A. Economic lot sizing: An O (n log n) algorithm that runs in linear time in the Wagner Whitin case. Operations Research 40 (1992) S145-S156
    • (1992) Operations Research , vol.40
    • Wagelmans, A.P.M.1    Van Hoesel, C.P.M.2    Kolen, A.3
  • 17
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner H.M., and Whitin T.M. Dynamic version of the economic lot size model. Management Science 5 (1958) 89-96
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 18
    • 20544436951 scopus 로고    scopus 로고
    • On the time-window fulfillment rate in a single-item min-max inventory control system
    • Wang T., Chen Y., and Feng Y. On the time-window fulfillment rate in a single-item min-max inventory control system. IIE Transactions 37 (2005) 667-680
    • (2005) IIE Transactions , vol.37 , pp. 667-680
    • Wang, T.1    Chen, Y.2    Feng, Y.3
  • 19
    • 0001199128 scopus 로고
    • Progress with single-item lot-sizing
    • Wolsey L.A. Progress with single-item lot-sizing. Journal of Operational Research 86 (1995) 395-401
    • (1995) Journal of Operational Research , vol.86 , pp. 395-401
    • Wolsey, L.A.1
  • 20
    • 33645304837 scopus 로고    scopus 로고
    • Lot-sizing with production and delivery time windows
    • Wolsey L.A. Lot-sizing with production and delivery time windows. Mathematical Programming, Series A 107 (2006) 471-489
    • (2006) Mathematical Programming, Series A , vol.107 , pp. 471-489
    • Wolsey, L.A.1
  • 21
    • 0002967761 scopus 로고
    • A deterministic multi-period production scheduling model with backlogging
    • Zangwill W.I. A deterministic multi-period production scheduling model with backlogging. Management Science 13 (1966) 105-119
    • (1966) Management Science , vol.13 , pp. 105-119
    • Zangwill, W.I.1
  • 22
    • 0000295676 scopus 로고
    • Minimum concave cost flows in certain networks
    • Zangwill W.I. Minimum concave cost flows in certain networks. Management Science 14 (1968) 429-450
    • (1968) Management Science , vol.14 , pp. 429-450
    • Zangwill, W.I.1
  • 23
    • 0000631024 scopus 로고
    • A backlogging model and a multiechelon model of a dynamic economic lot size production system-A network approach
    • Zangwill W.I. A backlogging model and a multiechelon model of a dynamic economic lot size production system-A network approach. Management Science 15 (1969) 506-527
    • (1969) Management Science , vol.15 , pp. 506-527
    • Zangwill, W.I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.