메뉴 건너뛰기




Volumn 5, Issue 5, 2007, Pages 46-53

Probabilistic transmission planning

Author keywords

[No Author keywords available]

Indexed keywords

INVESTMENTS; PROBABILITY; PROJECT MANAGEMENT; RELIABILITY; STRATEGIC PLANNING;

EID: 34548370681     PISSN: 15407977     EISSN: None     Source Type: Journal    
DOI: 10.1109/MPE.2007.904765     Document Type: Review
Times cited : (73)

References (8)
  • 1
    • 84968856104 scopus 로고    scopus 로고
    • Risk Assessment of Power Systems: Models, Methods, and Applications
    • IEEE Press NJ, Piscataway
    • W. Li Risk Assessment of Power Systems: Models, Methods, and Applications 2005 IEEE Press NJ, Piscataway
    • (2005)
    • Li, W.1
  • 2
    • 0003776424 scopus 로고
    • Reliability Assessment of Electric Power Systems Using Monte Carlo Methods
    • Plenum Press New York
    • R. Billinton W. Li Reliability Assessment of Electric Power Systems Using Monte Carlo Methods 1994 Plenum Press New York
    • (1994)
    • Billinton, R.1    Li, W.2
  • 3
    • 0003776432 scopus 로고    scopus 로고
    • Reliability Evaluation of Power Systems
    • Plenum Press New York
    • R. Billinton R. N. Allan Reliability Evaluation of Power Systems 1996 Plenum Press New York
    • (1996)
    • Billinton, R.1    Allan, R.N.2
  • 4
    • 85177017987 scopus 로고    scopus 로고
    • Application of reliability evaluation in transmission planning
    • W. Li Application of reliability evaluation in transmission planning IEEE Tutorial Course Electric Delivery System Reliability Evaluation IEEE Tutorial Course Electric Delivery System Reliability Evaluation 2005-June
    • (2005)
    • Li, W.1
  • 5
    • 0029306711 scopus 로고
    • Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver South Metro Systems
    • W. Li Y. Mansour J. K. Korczynski B. J. Mills Application of transmission reliability assessment in probabilistic planning of BC Hydro Vancouver South Metro Systems IEEE Trans. Power Syst. 19 964 970 May 1995
    • (1995) IEEE Trans. Power Syst. , vol.19 , pp. 964-970
    • Li, W.1    Mansour, Y.2    Korczynski, J.K.3    Mills, B.J.4
  • 6
    • 85177010916 scopus 로고    scopus 로고
    • Applying probabilistic methods in determining the number of spare transformers and their timing requirements
    • W. Wangdee W. Li W. Shum P. Choudhury Applying probabilistic methods in determining the number of spare transformers and their timing requirements Proc. IEEE CCECE Conf. Proc. IEEE CCECE Conf. Vancouver 2007-Apr.
    • (2007)
    • Wangdee, W.1    Li, W.2    Shum, W.3    Choudhury, P.4
  • 7
    • 85177021584 scopus 로고    scopus 로고
    • Technical reports on probabilistic transmission planning at British Columbia Transmission Corporation
    • Technical reports on probabilistic transmission planning at British Columbia Transmission Corporation http://www.bctc.com/the_transmission_system/reliability_assessment/
  • 8
    • 85177003493 scopus 로고    scopus 로고
    • NERC/WECC Planning Standards http://www.wecc.biz/documents/library/procedures/planning/WECC-NERC_Planning%20Standards_4-10-03.pdf


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.