메뉴 건너뛰기




Volumn 31, Issue 2, 2007, Pages 101-110

Wind turbine maintenance optimisation: Principles of quantitative maintenance optimisation

Author keywords

Delay time maintenance model; Maintenance optimisation; Modelling system failures; Monte Carlo simulation; Wind turbine

Indexed keywords

COMPUTER SIMULATION; FAILURE ANALYSIS; INSPECTION; MAINTENANCE; MONTE CARLO METHODS; OPTIMIZATION; WIND POWER;

EID: 34548301266     PISSN: 0309524X     EISSN: None     Source Type: Journal    
DOI: 10.1260/030952407781494467     Document Type: Article
Times cited : (81)

References (23)
  • 1
    • 17444421586 scopus 로고    scopus 로고
    • Marsh, G., Wind turbines how big can they get? Refocus, 2005, 22-28.URL: www.refocus.net.
    • Marsh, G., Wind turbines how big can they get? Refocus, 2005, 22-28.URL: www.refocus.net.
  • 2
    • 0032947927 scopus 로고    scopus 로고
    • Offshore wind energy prospects
    • Gaudiosi, G., Offshore wind energy prospects Renewable Energy, 1999, 16(1-4), 828-834
    • (1999) Renewable Energy , vol.16 , Issue.1-4 , pp. 828-834
    • Gaudiosi, G.1
  • 4
    • 34548320256 scopus 로고    scopus 로고
    • Conover, K., VandenBosche, J., Rhoads, H. and Smith, B., Review of operation and maintenance experience in the DOE-EPRI wind turbine verification program, Proceedings of American Wind Energy Association's WindPower 2000, NREL/CP-500-28620.
    • Conover, K., VandenBosche, J., Rhoads, H. and Smith, B., Review of operation and maintenance experience in the DOE-EPRI wind turbine verification program, Proceedings of American Wind Energy Association's WindPower 2000, NREL/CP-500-28620.
  • 5
    • 34548362684 scopus 로고    scopus 로고
    • Andrawus, J.A., Watson, J., Kishk, M. and Adam, A., Determining an appropriate Condition-Based Maintenance strategy for wind turbines Proceedings of the 2nd Joint International Conference on Sustainable Energy and Environment Bangkok 2006, 275-280.
    • Andrawus, J.A., Watson, J., Kishk, M. and Adam, A., Determining an appropriate Condition-Based Maintenance strategy for wind turbines Proceedings of the 2nd Joint International Conference on "Sustainable Energy and Environment" Bangkok 2006, 275-280.
  • 6
    • 33947113263 scopus 로고    scopus 로고
    • Andrawus, J.A., Watson, J., Kishk, M. and Adam, A., The Selection of a Suitable Maintenance Strategy for Wind Turbines, Wind Engineering, 2066, 30 (6), 471-486.
    • Andrawus, J.A., Watson, J., Kishk, M. and Adam, A., The Selection of a Suitable Maintenance Strategy for Wind Turbines, Wind Engineering, 2066, 30 (6), 471-486.
  • 7
    • 26444499662 scopus 로고    scopus 로고
    • Arthur. N., Optimisation of vibration analysis inspection intervals for an offshore Oil and Gas water injection pumping system, Proceedings of the IMECH E Part E Journal of Process Mechanical Engineering, Number E3, August 2005, 251-259.
    • Arthur. N., Optimisation of vibration analysis inspection intervals for an offshore Oil and Gas water injection pumping system, Proceedings of the IMECH E Part E Journal of Process Mechanical Engineering, Number E3, August 2005, 251-259.
  • 8
    • 0031166289 scopus 로고    scopus 로고
    • On the application of mathematical models in maintenance
    • Scarf, P.A., On the application of mathematical models in maintenance, European Journal of Operational Research, 1997, 99, 493-506.
    • (1997) European Journal of Operational Research , vol.99 , pp. 493-506
    • Scarf, P.A.1
  • 10
  • 11
    • 33947168517 scopus 로고    scopus 로고
    • Condition monitoring technique for optimisation of wind farm performance
    • Learney, V.C., Sharpe, D.J., and Infield, D., Condition monitoring technique for optimisation of wind farm performance International Journal of COMADEM,1999,2(1), 5-13.
    • (1999) International Journal of COMADEM , vol.2 , Issue.1 , pp. 5-13
    • Learney, V.C.1    Sharpe, D.J.2    Infield, D.3
  • 12
    • 0030106093 scopus 로고    scopus 로고
    • Application of maintenance optimization models: A review and analysis
    • Dekker R., Application of maintenance optimization models: a review and analysis Reliability Engineering and System Safety, 1996,51,229-240.
    • (1996) Reliability Engineering and System Safety , vol.51 , pp. 229-240
    • Dekker, R.1
  • 13
    • 0035254920 scopus 로고    scopus 로고
    • Optimal maintenance policy for a Markovian system under periodic inspection
    • Chiang, J.H., and Yuan, J., Optimal maintenance policy for a Markovian system under periodic inspection, Reliability Engineering and System Safety, 2001, 71,165-172.
    • (2001) Reliability Engineering and System Safety , vol.71 , pp. 165-172
    • Chiang, J.H.1    Yuan, J.2
  • 14
    • 0035479768 scopus 로고    scopus 로고
    • Optimizing preventive maintenance for mechanical components using genetic algorithms
    • Tsai, Y.T., Wang, K.S., and Teng, H.Y., Optimizing preventive maintenance for mechanical components using genetic algorithms, Reliability Engineering and System Safety 2001, 74, 89-97.
    • (2001) Reliability Engineering and System Safety , vol.74 , pp. 89-97
    • Tsai, Y.T.1    Wang, K.S.2    Teng, H.Y.3
  • 17
    • 84946655026 scopus 로고
    • Maximum Likelihood estimation in the Weibull Distribution Based on Complete and on Censored Samples
    • Cohen, A.C., Maximum Likelihood estimation in the Weibull Distribution Based on Complete and on Censored Samples Technometrics, 1965, 7(4), 579-588.
    • (1965) Technometrics , vol.7 , Issue.4 , pp. 579-588
    • Cohen, A.C.1
  • 20
    • 85015402706 scopus 로고    scopus 로고
    • A delay-time model for repairable machinery: Maximum likelihood estimation of optimum inspection intervals
    • Baker, R.D., Scarf, P.A., and Wang, W., A delay-time model for repairable machinery: maximum likelihood estimation of optimum inspection intervals, IMA Journal of Mathematics Applied in Business and Industry, 1997, 8, 83-92.
    • (1997) IMA Journal of Mathematics Applied in Business and Industry , vol.8 , pp. 83-92
    • Baker, R.D.1    Scarf, P.A.2    Wang, W.3
  • 21
    • 0000936628 scopus 로고    scopus 로고
    • Baker, R.D., and Wang, W., Estimating the delay-time distribution of faults in repairable machinery from failure data, I.M.A. Journal of Mathematics Applied in Business and Industry, 1991, 3, 259-282.
    • Baker, R.D., and Wang, W., Estimating the delay-time distribution of faults in repairable machinery from failure data, I.M.A. Journal of Mathematics Applied in Business and Industry, 1991, 3, 259-282.
  • 22
    • 0028395728 scopus 로고
    • Review of delay-time OR modelling of engineering aspect of maintenance
    • Baker, R.D., and Christer, A.H., Review of delay-time OR modelling of engineering aspect of maintenance, European Journal of Operational Research, 1994, 73, 407-422.
    • (1994) European Journal of Operational Research , vol.73 , pp. 407-422
    • Baker, R.D.1    Christer, A.H.2
  • 23
    • 34548323336 scopus 로고    scopus 로고
    • The case for more comprehensive data collection and how it might be achieved: Part 2
    • Sherwin, D., The case for more comprehensive data collection and how it might be achieved: Part 2, Asset Management and Maintenance, 2005, 20(4), 34-40.
    • (2005) Asset Management and Maintenance , vol.20 , Issue.4 , pp. 34-40
    • Sherwin, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.