메뉴 건너뛰기




Volumn 41, Issue 1, 2007, Pages 101-123

A distributed transient inter-production scheduling for flexible manufacturing systems

Author keywords

Cyclic scheduling; Flexible manufacturing systems; Makespan minimization; Multi agent systems; Transient inter production state

Indexed keywords

MANUFACTURE; MATHEMATICAL MODELS; MULTI AGENT SYSTEMS; OPTIMIZATION;

EID: 34548069654     PISSN: 12696935     EISSN: None     Source Type: Journal    
DOI: 10.3166/jesa.41.101-123     Document Type: Review
Times cited : (6)

References (20)
  • 1
    • 34548067041 scopus 로고    scopus 로고
    • th IFAC Symposium on Information Control Problems in Manufacturing, Brazil, 04-2004.
    • th IFAC Symposium on Information Control Problems in Manufacturing, Brazil, 04-2004.
  • 3
    • 0011493790 scopus 로고
    • Actalk: A tested for Classifying and Designing Actor Languages in Smalltalk-80 Environment
    • Briot J.P., "Actalk: a tested for Classifying and Designing Actor Languages in Smalltalk-80 Environment", European Conference on Object-Oriented Programming, 1989.
    • (1989) European Conference on Object-Oriented Programming
    • Briot, J.P.1
  • 6
    • 0002802279 scopus 로고
    • Periodic loading of flexible manufacturing systems
    • Bordeaux, France
    • Erschler J., Leveque D., Roubellat F., "Periodic loading of flexible manufacturing systems", IFIP Congress, APMS, Bordeaux, France, 1982, p. 327-339.
    • (1982) IFIP Congress, APMS , pp. 327-339
    • Erschler, J.1    Leveque, D.2    Roubellat, F.3
  • 8
    • 84947990350 scopus 로고
    • Partial Constraint Satisfaction by Multi-Agent- Simulated Annealing approach
    • Paris
    • Ghedira K., "Partial Constraint Satisfaction by Multi-Agent- Simulated Annealing approach", International Conference of AI, KBS, ES andNL, Paris, 1994.
    • (1994) International Conference of AI, KBS, ES andNL
    • Ghedira, K.1
  • 9
    • 34548102886 scopus 로고    scopus 로고
    • Distributed Extended Forward Checking for Max-CSP
    • Wollongong, Australie
    • Ghedira K., Belkahla O., "Distributed Extended Forward Checking for Max-CSP", Intelligent Systems and Applications, Wollongong, Australie, 12-2000.
    • Intelligent Systems and Applications , pp. 12-2000
    • Ghedira, K.1    Belkahla, O.2
  • 10
    • 0024479894 scopus 로고
    • Performance Evaluation of Job-Shop Systems using Timed Event-Graphs
    • Hillion H. P., Proth J.-M., "Performance Evaluation of Job-Shop Systems using Timed Event-Graphs", IEEE Trans. on Automatic Control, 1989, vol. 34, no 1, p. 3-9.
    • (1989) IEEE Trans. on Automatic Control , vol.34 , Issue.1 , pp. 3-9
    • Hillion, H.P.1    Proth, J.-M.2
  • 11
    • 34548086671 scopus 로고    scopus 로고
    • A genetic algorithm to solving the problem of flexible manufacturing system cyclic scheduling
    • TA1K2, Hammamet, Tunisia
    • Hsu T., Dupas R., Goncalves G., "A genetic algorithm to solving the problem of flexible manufacturing system cyclic scheduling", IEEE SMC'02, 10-2002, vol.3, TA1K2, Hammamet, Tunisia.
    • IEEE SMC'02 , vol.3 , pp. 10-2002
    • Hsu, T.1    Dupas, R.2    Goncalves, G.3
  • 12
    • 0242360157 scopus 로고    scopus 로고
    • Solving Transient Scheduling problems with constraint programming
    • Korbaa O., Yim P., Gentina J.-C., "Solving Transient Scheduling problems with constraint programming", European Journal of Control (EJC), 2000, vol. 6, no 6, p. 511-524.
    • (2000) European Journal of Control (EJC) , vol.6 , Issue.6 , pp. 511-524
    • Korbaa, O.1    Yim, P.2    Gentina, J.-C.3
  • 13
    • 0242364634 scopus 로고    scopus 로고
    • Two FMS scheduling methods based on Petri nets: A global and a local approach
    • Korbaa O., Benasser A., Yim P., "Two FMS scheduling methods based on Petri nets: a global and a local approach", International Journal of Production Research (IJPR), 2003, vol. 41, no 7, p. 1349-1371.
    • (2003) International Journal of Production Research (IJPR) , vol.41 , Issue.7 , pp. 1349-1371
    • Korbaa, O.1    Benasser, A.2    Yim, P.3
  • 14
    • 34548069612 scopus 로고    scopus 로고
    • th IFAC Symposium, Vienne, 09-2001.
    • th IFAC Symposium, Vienne, 09-2001.
  • 15
    • 0041833805 scopus 로고
    • Résolution d'un problème d'ordonnancement cyclique à itérations indépendantes et contraintes de ressources
    • « »
    • Munier A., « Résolution d'un problème d'ordonnancement cyclique à itérations indépendantes et contraintes de ressources », RO-RAIRO, 1991, vol. 25, no 2, p. 161-182.
    • (1991) RO-RAIRO , vol.25 , Issue.2 , pp. 161-182
    • Munier, A.1
  • 17
    • 0008917539 scopus 로고    scopus 로고
    • A mathematical model for periodic scheduling problems
    • Serafini P., Ukovich W., "A mathematical model for periodic scheduling problems", SIAM J Disc. Math, 11-1989, vol. 2, no 4, p. 550-581.
    • SIAM J Disc. Math , vol.2 , Issue.4
    • Serafini, P.1    Ukovich, W.2
  • 19
    • 34548095856 scopus 로고    scopus 로고
    • Varnier C., Extensions de Hoist Scheduling Problem cyclique - Résolution basée sur un traitement des contraintes disjunctives en programmation logique avec contraintes, Thèse de Doctorat, Université de Franche-Comté, n° 502, Janvier 1996.
    • Varnier C., Extensions de "Hoist Scheduling Problem" cyclique - Résolution basée sur un traitement des contraintes disjunctives en programmation logique avec contraintes, Thèse de Doctorat, Université de Franche-Comté, n° 502, Janvier 1996.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.