메뉴 건너뛰기




Volumn 22, Issue 3, 2007, Pages 1275-1283

Transient stability prediction by a hybrid intelligent system

Author keywords

Hyrid intelligent system; Neural network; Transient stability

Indexed keywords

ELECTRIC GENERATORS; ELECTRIC POWER SYSTEMS; NEURAL NETWORKS; SYNCHRONOUS MACHINERY; TRANSIENT ANALYSIS;

EID: 34548011487     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2007.901667     Document Type: Article
Times cited : (186)

References (30)
  • 4
    • 2542522291 scopus 로고    scopus 로고
    • A framework of reliability assessment with consideration effect of transient and voltage stabilities
    • May
    • N. Amjady, "A framework of reliability assessment with consideration effect of transient and voltage stabilities," IEEE Trans. Power Syst., vol. 19, no. 2, pp. 1005-1014, May 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.2 , pp. 1005-1014
    • Amjady, N.1
  • 5
    • 0031175580 scopus 로고    scopus 로고
    • Transient stability assessment of power systems by a new estimating neural network
    • Jul
    • N. Amjady and M. Ehsan, "Transient stability assessment of power systems by a new estimating neural network," Can. J. Elect. Comp. Eng., vol. 22, no. 3, pp. 131-137, Jul. 1997.
    • (1997) Can. J. Elect. Comp. Eng , vol.22 , Issue.3 , pp. 131-137
    • Amjady, N.1    Ehsan, M.2
  • 6
    • 0032649511 scopus 로고    scopus 로고
    • Application of a novel fuzzy neural network to real-time transient stability swings prediction based on synchronized phasor measurements
    • May
    • C. W. Liu, M. C. Su, S. S. Tsay, and Y. J. Wang, "Application of a novel fuzzy neural network to real-time transient stability swings prediction based on synchronized phasor measurements," IEEE Trans. Power Syst., vol. 14, no. 2, pp. 685-692, May 1999.
    • (1999) IEEE Trans. Power Syst , vol.14 , Issue.2 , pp. 685-692
    • Liu, C.W.1    Su, M.C.2    Tsay, S.S.3    Wang, Y.J.4
  • 7
    • 27144437603 scopus 로고    scopus 로고
    • Application of a new artificial neural network in transient stability assessment
    • Halifax, NS, Canada, Jun
    • N. Amjady, "Application of a new artificial neural network in transient stability assessment," in Proc. IEEE Lescope Conf., Halifax, NS, Canada, Jun. 1999, pp. 126-132.
    • (1999) Proc. IEEE Lescope Conf , pp. 126-132
    • Amjady, N.1
  • 8
    • 1442338974 scopus 로고    scopus 로고
    • Determination of effectiveness of transient stability controls using reduced number of trajectory sensitivity computations
    • Feb
    • K. N. Shubhanga and A. M. Kulkarni, "Determination of effectiveness of transient stability controls using reduced number of trajectory sensitivity computations," IEEE Trans. Power Syst., vol. 19, no. 1, pp. 473-482, Feb. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.1 , pp. 473-482
    • Shubhanga, K.N.1    Kulkarni, A.M.2
  • 9
    • 27144549030 scopus 로고    scopus 로고
    • Application of a new fuzzy neural network to transient stability prediction
    • San Francisco, CA, Jun
    • N. Amjady, "Application of a new fuzzy neural network to transient stability prediction," in Proc. IEEE PES Summer Meeting, San Francisco, CA, Jun. 2005, pp. 69-76.
    • (2005) Proc. IEEE PES Summer Meeting , pp. 69-76
    • Amjady, N.1
  • 10
    • 27144494641 scopus 로고
    • Transient stability solution by an impedance matrix method
    • Dec
    • H. E. Brown, H. H. Happ, C. E. Person, and C. C. Young, "Transient stability solution by an impedance matrix method," IEEE Trans. Power App. Syst., vol. PAS-84, no. 12, pp. 1204-1214, Dec. 1965.
    • (1965) IEEE Trans. Power App. Syst , vol.PAS-84 , Issue.12 , pp. 1204-1214
    • Brown, H.E.1    Happ, H.H.2    Person, C.E.3    Young, C.C.4
  • 11
    • 27144485453 scopus 로고
    • Transient stability of a synchronous generator under conditions of bang-bang excitation scheduling
    • Jan
    • G. A. Jones, "Transient stability of a synchronous generator under conditions of bang-bang excitation scheduling," IEEE Trans. Power App. Syst., vol. PAS-84, no. 1, pp. 114-121, Jan. 1965.
    • (1965) IEEE Trans. Power App. Syst , vol.PAS-84 , Issue.1 , pp. 114-121
    • Jones, G.A.1
  • 13
    • 34548027681 scopus 로고
    • Transient stability analysis of multimachine power systems by catastrophe theory
    • Jul
    • A. M. Mihrig and M. D. Wrong, "Transient stability analysis of multimachine power systems by catastrophe theory," Proc. Inst. Elect. Eng. C, vol. 136, no. 4, pp. 254-258, Jul. 1989.
    • (1989) Proc. Inst. Elect. Eng. C , vol.136 , Issue.4 , pp. 254-258
    • Mihrig, A.M.1    Wrong, M.D.2
  • 14
    • 0026898842 scopus 로고
    • Pattern recognition applied to transient stability analysis of power systems with modeling including voltage and speed regulation
    • Jul
    • G. Garcia, J. Benussou, and M. Berbiche, "Pattern recognition applied to transient stability analysis of power systems with modeling including voltage and speed regulation," Proc. Inst. Elect. Eng. B, vol. 139, no. 4, pp. 321-325, Jul. 1992.
    • (1992) Proc. Inst. Elect. Eng. B , vol.139 , Issue.4 , pp. 321-325
    • Garcia, G.1    Benussou, J.2    Berbiche, M.3
  • 15
    • 0029305565 scopus 로고
    • Real time preventive actions for transient stability enhancement with a hybrid neural network-optimization approach
    • May
    • V. Miranda, J. N. Fidalgo, J. A. Pecas Lopes, and L. B. Almedia, "Real time preventive actions for transient stability enhancement with a hybrid neural network-optimization approach," IEEE Trans. Power Syst., vol. 10, no. 2, pp. 1029-1035, May 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.2 , pp. 1029-1035
    • Miranda, V.1    Fidalgo, J.N.2    Pecas Lopes, J.A.3    Almedia, L.B.4
  • 16
    • 32144452560 scopus 로고    scopus 로고
    • A unified approach for processing unbalanced conditions in transient stability calculations
    • Feb
    • X. Bai, T. Jiang, Z. Guo, Z. Yan, and Y. Ni, "A unified approach for processing unbalanced conditions in transient stability calculations," IEEE Trans. Power Syst., vol. 21, no. 1, pp. 85-90, Feb. 2006.
    • (2006) IEEE Trans. Power Syst , vol.21 , Issue.1 , pp. 85-90
    • Bai, X.1    Jiang, T.2    Guo, Z.3    Yan, Z.4    Ni, Y.5
  • 17
    • 0029343257 scopus 로고
    • Application of synchronized phasor measurements to real-time transient stability prediction
    • C. W. Liu and J. S. Thorp, "Application of synchronized phasor measurements to real-time transient stability prediction," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 142, no. 4, pp. 335-360, 1995.
    • (1995) Proc. Inst. Elect. Eng., Gen., Transm., Distrib , vol.142 , Issue.4 , pp. 335-360
    • Liu, C.W.1    Thorp, J.S.2
  • 18
    • 0028482596 scopus 로고
    • Decision trees for real-time transient stability prediction
    • Aug
    • S. Rovnyak, S. Kretsinger, J. Thorp, and D. Brown, "Decision trees for real-time transient stability prediction," IEEE Trans. Power Syst. vol. 9, no. 3, pp. 1417-1426, Aug. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.3 , pp. 1417-1426
    • Rovnyak, S.1    Kretsinger, S.2    Thorp, J.3    Brown, D.4
  • 19
    • 0035791759 scopus 로고    scopus 로고
    • Russian far east interconnected power system emergency stability control
    • Jul
    • A. A. Grobovoy, "Russian far east interconnected power system emergency stability control," in Proc. IEEE Power Engineering Society Summer Meeting, Jul. 2001, vol. 2, no. 15-19, pp. 824-829.
    • (2001) Proc. IEEE Power Engineering Society Summer Meeting , vol.2 , Issue.15-19 , pp. 824-829
    • Grobovoy, A.A.1
  • 20
    • 2542625918 scopus 로고    scopus 로고
    • Support vector machines for transient stability analysis of largescale power systems
    • May
    • L. S. Moulin, A. P. Alves da Silva, M. A. El-Sharkawi, and R. J. Marks II, "Support vector machines for transient stability analysis of largescale power systems," IEEE Trans. Power Syst., vol. 19, no. 2, pp. 818-825, May 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.2 , pp. 818-825
    • Moulin, L.S.1    Alves da Silva, A.P.2    El-Sharkawi, M.A.3    Marks II, R.J.4
  • 21
    • 0038004050 scopus 로고    scopus 로고
    • Support vector and multilayer perceptron neural networks applied to power systems transient stability analysis with input dimensionality reduction
    • Chicago, IL, Jul
    • L. S. Moulin, A. P. A. da Silva, M. A. El-Sharkawi, and R. J. Marks II, "Support vector and multilayer perceptron neural networks applied to power systems transient stability analysis with input dimensionality reduction," in Proc. IEEE Power Engineering Society Summer Meeting Chicago, IL, Jul. 2002, vol. 13, pp. 1308-1313.
    • (2002) Proc. IEEE Power Engineering Society Summer Meeting , vol.13 , pp. 1308-1313
    • Moulin, L.S.1    da Silva, A.P.A.2    El-Sharkawi, M.A.3    Marks II, R.J.4
  • 22
    • 0031140126 scopus 로고    scopus 로고
    • Large scale dynamic security screening and ranking using neural networks
    • May
    • Y. Mansour, A. Y. Chang, J. Tamby, E. Vaahedi, and M. A. El-Sharkawi, "Large scale dynamic security screening and ranking using neural networks," IEEE Trans. Power Syst., vol. 12, no. 2, pp. 954-960, May 1997.
    • (1997) IEEE Trans. Power Syst , vol.12 , Issue.2 , pp. 954-960
    • Mansour, Y.1    Chang, A.Y.2    Tamby, J.3    Vaahedi, E.4    El-Sharkawi, M.A.5
  • 23
    • 0035425970 scopus 로고    scopus 로고
    • Time-varying contingency screening for dynamic security assessment using intelligent-systems techniques
    • Aug
    • I. Kamwa, R. Grondin, and L. Loud, "Time-varying contingency screening for dynamic security assessment using intelligent-systems techniques," IEEE Trans. Power Syst., vol. 16, no. 3, pp. 526-536, Aug. 2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.3 , pp. 526-536
    • Kamwa, I.1    Grondin, R.2    Loud, L.3
  • 24
    • 18944363181 scopus 로고    scopus 로고
    • Application of a new sensitivity analysis framework for voltage contingency ranking
    • May
    • N. Amjady and M. Esmaili, "Application of a new sensitivity analysis framework for voltage contingency ranking," IEEE Trans. Power Syst. vol. 20, no. 2, pp. 973-983, May 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.2 , pp. 973-983
    • Amjady, N.1    Esmaili, M.2
  • 25
    • 0037672425 scopus 로고    scopus 로고
    • Improving voltage security assessment and ranking vulnerable bus with consideration of power system limits
    • Nov
    • N. Amjady and M. Esmaili, "Improving voltage security assessment and ranking vulnerable bus with consideration of power system limits," Int. J. Elect. Power Energy Syst., vol. 25, no. 9, pp. 705-715, Nov. 2003.
    • (2003) Int. J. Elect. Power Energy Syst , vol.25 , Issue.9 , pp. 705-715
    • Amjady, N.1    Esmaili, M.2
  • 26
    • 0032141838 scopus 로고    scopus 로고
    • A new approach to dynamic security assessment using trajectory sensitivities
    • Aug
    • M. J. Laufenberg and M. A. Pai, "A new approach to dynamic security assessment using trajectory sensitivities," IEEE Trans. Power Syst. vol. 13, no. 3, pp. 953-958, Aug. 1998.
    • (1998) IEEE Trans. Power Syst , vol.13 , Issue.3 , pp. 953-958
    • Laufenberg, M.J.1    Pai, M.A.2
  • 27
    • 1442265461 scopus 로고    scopus 로고
    • Slow coherency-based islanding
    • Feb
    • H. You, V. Vittal, and X. Wang, "Slow coherency-based islanding," IEEE Trans. Power Syst., vol. 19, no. 1, pp. 483-491, Feb. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.1 , pp. 483-491
    • You, H.1    Vittal, V.2    Wang, X.3
  • 28
    • 1442289939 scopus 로고    scopus 로고
    • Energy price forecasting in the ontario competitive power system market
    • Feb
    • C. P. Rodriguez and G. J. Anders, "Energy price forecasting in the ontario competitive power system market," IEEE Trans. Power Syst. vol. 19, no. 1, pp. 366-374, Feb. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.1 , pp. 366-374
    • Rodriguez, C.P.1    Anders, G.J.2
  • 29
    • 34548015148 scopus 로고    scopus 로고
    • 1993, PN40 Operator Manual 2, ABB Network Control Ltd., Turgi, Switzerland.
    • 1993, PN40 Operator Manual 2, ABB Network Control Ltd., Turgi, Switzerland.
  • 30
    • 34548042002 scopus 로고    scopus 로고
    • PSS/E25 Program Operation Manual Power Technologies Inc., USA, 1997.
    • PSS/E25 Program Operation Manual Power Technologies Inc., USA, 1997.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.