메뉴 건너뛰기




Volumn 10, Issue 4, 2007, Pages 321-337

Value of electric heat boilers and heat pumps for wind power integration

Author keywords

Electric heat boilers; Heat pumps; Stochastic optimisation; System integration; Wind power

Indexed keywords

ELECTRIC POWER GENERATION; ENERGY CONSERVATION; FUEL OILS; HEAT PUMP SYSTEMS;

EID: 34547830805     PISSN: 10954244     EISSN: 10991824     Source Type: Journal    
DOI: 10.1002/we.224     Document Type: Article
Times cited : (144)

References (11)
  • 1
    • 34547831674 scopus 로고    scopus 로고
    • IEA Heat Pump Centre, Online, Available:, Accessed 6 March
    • IEA Heat Pump Centre. Heat pump performance. [Online]. Available: www.heatpumpcentre.org/ About_heat_pumps/HP_performance.asp. (Accessed 6 March 2007)
    • (2007) Heat pump performance
  • 2
    • 32544459272 scopus 로고    scopus 로고
    • Integrated energy systems and local energy markets
    • DOI: 10.1016/j.enpol.2004.10.004
    • Lund H, Münster E. Integrated energy systems and local energy markets. Energy Policy 2006; 10: 1152-1160. DOI: 10.1016/j.enpol.2004.10.004.
    • (2006) Energy Policy , vol.10 , pp. 1152-1160
    • Lund, H.1    Münster, E.2
  • 3
    • 34547835613 scopus 로고    scopus 로고
    • Elkraft System (now Energinet.dk). Langsigtede udfordringer i elsystemet (in Danish), 2005.
    • Elkraft System (now Energinet.dk). Langsigtede udfordringer i elsystemet (in Danish), 2005.
  • 4
    • 34547831679 scopus 로고    scopus 로고
    • Meibom P, Barth R, Brand H, Larsen H, Voll O, Weber C. Wilmar joint market model documentation, Deliverable 6.2(b) in the WILMAR project. [Online]. Available: www.wilmar.risoe.dk. (Accessed 6 March 2007)
    • Meibom P, Barth R, Brand H, Larsen H, Voll O, Weber C. Wilmar joint market model documentation, Deliverable 6.2(b) in the WILMAR project. [Online]. Available: www.wilmar.risoe.dk. (Accessed 6 March 2007)
  • 5
    • 34547831678 scopus 로고    scopus 로고
    • Ravn HF. The Wilmar long term model, Deliverable 6.2(c) in the WILMAR project. [Online]. Available: www.wilmar.risoe.dk. (Accessed 6 March 2007)
    • Ravn HF. The Wilmar long term model, Deliverable 6.2(c) in the WILMAR project. [Online]. Available: www.wilmar.risoe.dk. (Accessed 6 March 2007)
  • 7
    • 34547831676 scopus 로고    scopus 로고
    • Fluctuations and predictability of wind and hydro power
    • 2.1 in the WILMAR project, Online, Available:, Accessed 6 March 2007
    • Norgard P, Giebel G, Holttinen H, Söder L, Petterteig A. Fluctuations and predictability of wind and hydro power. Deliverable 2.1 in the WILMAR project. [Online]. Available: www.wilmar.risoe.dk. (Accessed 6 March 2007)
    • Deliverable
    • Norgard, P.1    Giebel, G.2    Holttinen, H.3    Söder, L.4    Petterteig, A.5
  • 8
    • 33751071102 scopus 로고    scopus 로고
    • Scenario reduction in stochastic programming-an approach using probability metrics
    • DOI: 10.1007/sl0107-002-0331-0
    • Dupacova J, Gröwe-Kuska N, Römisch W. Scenario reduction in stochastic programming-an approach using probability metrics. Math Program, Ser. A 95 2003; 3: 493-511. DOI: 10.1007/sl0107-002-0331-0.
    • (2003) Math Program, Ser. A , vol.95 , Issue.3 , pp. 493-511
    • Dupacova, J.1    Gröwe-Kuska, N.2    Römisch, W.3
  • 9
    • 34547831675 scopus 로고    scopus 로고
    • Meibom P, Weber C, Barth R, Brand H. Operational costs induced by fluctuating wind power production in Germany and Scandinavia. In Deliverable D5b in the Greennet-EU27 Project 'Disaggregated system operation cost and grid extension cost caused by intermittent RES-E grid integration'. Swider D, Voss A, et al. (eds.) Vienna University of Technology, Energy Economics Group: Vienna, Austria, 2006; pp. 133-156. Report will become available at greennet.i-generation.at/?site=500&file=22. (Accessed 6 March 2007)
    • Meibom P, Weber C, Barth R, Brand H. Operational costs induced by fluctuating wind power production in Germany and Scandinavia. In Deliverable D5b in the Greennet-EU27 Project 'Disaggregated system operation cost and grid extension cost caused by intermittent RES-E grid integration'. Swider D, Voss A, et al. (eds.) Vienna University of Technology, Energy Economics Group: Vienna, Austria, 2006; pp. 133-156. Report will become available at greennet.i-generation.at/?site=500&file=22. (Accessed 6 March 2007)
  • 10
    • 34547846764 scopus 로고    scopus 로고
    • Danish Energy Authority, Elkraft System, Eltra. Technology data for electricity and heat generating plants. [Online]. Available: http://ens.netboghandel.dk/english/publ.asp?page=publ&objno=250000115. (Accessed 6 March 2007)
    • Danish Energy Authority, Elkraft System, Eltra. Technology data for electricity and heat generating plants. [Online]. Available: http://ens.netboghandel.dk/english/publ.asp?page=publ&objno=250000115. (Accessed 6 March 2007)
  • 11
    • 34547831673 scopus 로고    scopus 로고
    • Danish Energy Authority, Elkraft, Eltra, Ålborg University. Eloverl0bsrapport-Dokumentation af beregningerne (in Danish). [Online]. Available: http://www.ens.dk/swl5171.asp. (Accessed 6 March 2007)
    • Danish Energy Authority, Elkraft, Eltra, Ålborg University. Eloverl0bsrapport-Dokumentation af beregningerne (in Danish). [Online]. Available: http://www.ens.dk/swl5171.asp. (Accessed 6 March 2007)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.