메뉴 건너뛰기




Volumn 77, Issue 7, 2007, Pages 575-583

Alternative estimation procedure in SPC when the process data are correlated

Author keywords

Autoregressive moving average model; Exponentially weighted moving average control chart; First order autoregressive model; Maximum likelihood estimation; Shewhart control chart

Indexed keywords


EID: 34547754937     PISSN: 00949655     EISSN: 15635163     Source Type: Journal    
DOI: 10.1080/10629360600569287     Document Type: Article
Times cited : (2)

References (14)
  • 1
    • 0002298590 scopus 로고
    • Modification of control limits in the presence of data correlation
    • Vasilopoulos, A.V. and Stamboulis, A.P., 1978, Modification of control limits in the presence of data correlation. Journal of Quality Technology, 10, 20-30.
    • (1978) Journal of Quality Technology , vol.10 , pp. 20-30
    • Vasilopoulos, A.V.1    Stamboulis, A.P.2
  • 3
    • 0041999147 scopus 로고
    • Forecast stability and control charts
    • American Society for Quality Control, Milwaukee, WI
    • Abraham, B. and Kartha, C.P., 1979, Forecast stability and control charts. ASQC Technical Conference Transactions, American Society for Quality Control, Milwaukee, WI, 675-680.
    • (1979) ASQC Technical Conference Transactions , pp. 675-680
    • Abraham, B.1    Kartha, C.P.2
  • 4
    • 0004858897 scopus 로고
    • Autocorrelation: Fixed versus variable control limits
    • Alwan, L.C., 1991, Autocorrelation: fixed versus variable control limits. Quality Engineering, 4, 167-188.
    • (1991) Quality Engineering , vol.4 , pp. 167-188
    • Alwan, L.C.1
  • 6
  • 8
    • 0032628394 scopus 로고    scopus 로고
    • EWMA control charts for monitoring the mean of autocorrelated process
    • Lu, C.-W. and Reynolds, M.R., Jr., 1999, EWMA control charts for monitoring the mean of autocorrelated process. Journal of Quality Technology, 31, 166-188.
    • (1999) Journal of Quality Technology , vol.31 , pp. 166-188
    • Lu, C.-W.1    Reynolds Jr., M.R.2
  • 9
    • 0033154344 scopus 로고    scopus 로고
    • Control charts for monitoring the mean and variance of autocorrelated process
    • Lu, C.-W. and Reynolds, M.R., Jr., 1999, Control charts for monitoring the mean and variance of autocorrelated process. Journal of Quality Technology, 31, 259-274.
    • (1999) Journal of Quality Technology , vol.31 , pp. 259-274
    • Lu, C.-W.1    Reynolds Jr., M.R.2
  • 10
    • 0041585479 scopus 로고    scopus 로고
    • CUSUM charts for monitoring an autocorrelated process
    • Lu, C.-W. and Reynolds, M.R., Jr., 2001, CUSUM charts for monitoring an autocorrelated process. Journal of Quality Technology, 33, 316-334.
    • (2001) Journal of Quality Technology , vol.33 , pp. 316-334
    • Lu, C.-W.1    Reynolds Jr., M.R.2
  • 11
  • 12
    • 0000504195 scopus 로고    scopus 로고
    • Phase I analysis for autocorrelated process
    • Boyles, R.A., 2000, Phase I analysis for autocorrelated process. Journal of Quality Technology, 32, 395-409.
    • (2000) Journal of Quality Technology , vol.32 , pp. 395-409
    • Boyles, R.A.1
  • 13
    • 84952149041 scopus 로고
    • Run length distributions of special-cause control charts for correlated processes
    • Wardell, D.G., Moskowitz, H. and Plante, R.D., 1994, Run length distributions of special-cause control charts for correlated processes. Technometrics, 36, 3-17.
    • (1994) Technometrics , vol.36 , pp. 3-17
    • Wardell, D.G.1    Moskowitz, H.2    Plante, R.D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.