메뉴 건너뛰기




Volumn , Issue , 2007, Pages 461-469

A decision-theoretic planner with dynamic component reconfiguration for distributed real-time applications

Author keywords

[No Author keywords available]

Indexed keywords

EMBEDDED SYSTEMS; PLANNING; REAL TIME SYSTEMS; SCHEDULING;

EID: 34547552912     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ISADS.2007.1     Document Type: Conference Paper
Times cited : (12)

References (19)
  • 3
    • 0003854477 scopus 로고    scopus 로고
    • The Magnetospheric Multiscale Mis-sion...Resolving Fundamental Processes in Space Plasmas
    • N, Dec
    • S. Curtis. The Magnetospheric Multiscale Mis-sion...Resolving Fundamental Processes in Space Plasmas. NASA STI/Recon Technical Report N, pages 48257-+, Dec. 1999.
    • (1999) NASA STI/Recon Technical Report
    • Curtis, S.1
  • 7
    • 0037302545 scopus 로고    scopus 로고
    • Algorithms for Propagating Resource Constraints in AI Planning and Scheduling: Existing Approaches and New Results
    • P. Laborie. Algorithms for Propagating Resource Constraints in AI Planning and Scheduling: Existing Approaches and New Results. Artif. Intell., 143(2):151-188, 2003.
    • (2003) Artif. Intell , vol.143 , Issue.2 , pp. 151-188
    • Laborie, P.1
  • 9
    • 84880865654 scopus 로고    scopus 로고
    • X. Nguyen and S. Kambhampati. Reviving Partial Order Planning. In B. Nebel, editor, IJCAI, pages 459-466. Morgan Kaufmann, 2001.
    • X. Nguyen and S. Kambhampati. Reviving Partial Order Planning. In B. Nebel, editor, IJCAI, pages 459-466. Morgan Kaufmann, 2001.
  • 10
    • 3042591192 scopus 로고    scopus 로고
    • Object Management Group, OMG Document formal/05-01-04 edition, Aug
    • Object Management Group. Real-time CORBA Specification, OMG Document formal/05-01-04 edition, Aug. 2002.
    • (2002) Real-time CORBA Specification
  • 11
    • 7744232295 scopus 로고    scopus 로고
    • Object Management Group, OMG Document mars/03-05-08 edition, July
    • Object Management Group. Deployment and Configuration Adopted Submission, OMG Document mars/03-05-08 edition, July 2003.
    • (2003) Deployment and Configuration Adopted Submission
  • 12
    • 12344299930 scopus 로고    scopus 로고
    • Object Management Group, OMG Document realtime/03-05-05 edition, May
    • Object Management Group. Light Weight CORBA Component Model Revised Submission, OMG Document realtime/03-05-05 edition, May 2003.
    • (2003) Light Weight CORBA Component Model Revised Submission
  • 13
    • 0028442512 scopus 로고
    • Implementation of Resource Constraints in ILOG SCHEDULE: A Library for the Development of Constraint-Based Scheduling Systems
    • C. L. Pape. Implementation of Resource Constraints in ILOG SCHEDULE: A Library for the Development of Constraint-Based Scheduling Systems. Intelligent Systems Engineering, 3(2):55-66, 1994.
    • (1994) Intelligent Systems Engineering , vol.3 , Issue.2 , pp. 55-66
    • Pape, C.L.1
  • 18
    • 0034155410 scopus 로고    scopus 로고
    • Bridging the Gap Between Planning and Scheduling
    • D. Smith, J. Frank, and A. Jonsson. Bridging the Gap Between Planning and Scheduling. Knowledge Engineering Review, 15(1):61-94, 2000.
    • (2000) Knowledge Engineering Review , vol.15 , Issue.1 , pp. 61-94
    • Smith, D.1    Frank, J.2    Jonsson, A.3
  • 19
    • 84943268939 scopus 로고    scopus 로고
    • B. Srivastava and S. Kambhampati. Scaling up Planning by Teasing out Resource Scheduling. In S. Biundo and M. Fox, editors, ECP, 1809 of Lecture Notes in Computer Science, pages 172-186. Springer, 1999.
    • B. Srivastava and S. Kambhampati. Scaling up Planning by Teasing out Resource Scheduling. In S. Biundo and M. Fox, editors, ECP, volume 1809 of Lecture Notes in Computer Science, pages 172-186. Springer, 1999.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.