메뉴 건너뛰기




Volumn 22, Issue 6, 2007, Pages 419-429

Risk modeling of dependence among project task durations

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; PAVEMENTS; PERT; RANDOM NUMBER GENERATION; RISK ASSESSMENT; SCHEDULING;

EID: 34250346077     PISSN: 10939687     EISSN: 14678667     Source Type: Journal    
DOI: 10.1111/j.1467-8667.2007.00497.x     Document Type: Article
Times cited : (10)

References (44)
  • 2
    • 0000191706 scopus 로고    scopus 로고
    • Scheduling/cost optimization and neural dynamics model for construction
    • Adeli, H. & Karim, A. (1997), Scheduling/cost optimization and neural dynamics model for construction, Journal of Construction Engineering and Management, ASCE, 123 (4), 450-8.
    • (1997) Journal of Construction Engineering and Management, ASCE , vol.123 , Issue.4 , pp. 450-458
    • Adeli, H.1    Karim, A.2
  • 6
    • 0344475790 scopus 로고
    • The percentage points of the χ 2 distribution
    • Best, D. J. & Roberts, D. E. (1975), The percentage points of the χ 2 distribution, Applied Statistics, 24, 385-8.
    • (1975) Applied Statistics , vol.24 , pp. 385-388
    • Best, D.J.1    Roberts, D.E.2
  • 8
    • 0018478270 scopus 로고
    • Simulation of construction project duration
    • Carr, R. I. (1979), Simulation of construction project duration, Journal of Construction Division, ASCE, 105 (CO2), 117-28.
    • (1979) Journal of Construction Division, ASCE , vol.105 , Issue.CO2 , pp. 117-128
    • Carr, R.I.1
  • 9
    • 0009771672 scopus 로고
    • Monte Carlo simulation of construction costs using subjective data
    • Chau, K. W. (1995), Monte Carlo simulation of construction costs using subjective data, Construction Management and Economics, 13, 369-83.
    • (1995) Construction Management and Economics , vol.13 , pp. 369-383
    • Chau, K.W.1
  • 10
    • 0000142663 scopus 로고    scopus 로고
    • Initialization for NORTA: Generation of random vectors with specified marginals and correlations
    • Chen, H. (2001), Initialization for NORTA: Generation of random vectors with specified marginals and correlations, INFORMS Journal on Computing, 13, 312-31.
    • (2001) INFORMS Journal on Computing , vol.13 , pp. 312-331
    • Chen, H.1
  • 11
    • 0000416538 scopus 로고
    • The PERT model for the distribution of an activity time
    • Clark, C. E. (1962), The PERT model for the distribution of an activity time, Operations Research, 3 (10), 405-6.
    • (1962) Operations Research , vol.3 , Issue.10 , pp. 405-406
    • Clark, C.E.1
  • 12
    • 0012001015 scopus 로고    scopus 로고
    • The magnitude of errors in proximal multiattribute decision analysis with probabilistically dependent attributes
    • Corner, J. L. & Kirkwood, C. W. (1996), The magnitude of errors in proximal multiattribute decision analysis with probabilistically dependent attributes, Management Science, 42, 1033-42.
    • (1996) Management Science , vol.42 , pp. 1033-1042
    • Corner, J.L.1    Kirkwood, C.W.2
  • 13
    • 0029349885 scopus 로고
    • Simple normal approximation to the completion times distribution for a PERT network
    • Cox, M. A. A. (1995), Simple normal approximation to the completion times distribution for a PERT network, International Journal of Project Management, 13 (4), 265-70.
    • (1995) International Journal of Project Management , vol.13 , Issue.4 , pp. 265-270
    • Cox, M.A.A.1
  • 14
    • 0006799266 scopus 로고
    • A remark on algorithm AS63: The incomplete β integral, AS64: Inverse of the incomplete β function ratio
    • Cran, G. W., Martin, K. J. & Thomas, G. E. (1977), A remark on algorithm AS63: The incomplete β integral, AS64: Inverse of the incomplete β function ratio, Applied Statistics, 26, 111-4.
    • (1977) Applied Statistics , vol.26 , pp. 111-114
    • Cran, G.W.1    Martin, K.J.2    Thomas, G.E.3
  • 15
    • 0348134540 scopus 로고    scopus 로고
    • Behavior of the NORTA method for correlated random vector generation as the dimension increases
    • Ghosh, S. & Henderson, S. G. (2003), Behavior of the NORTA method for correlated random vector generation as the dimension increases, ACM Transactions on Modeling and Computer Simulation, 13 (3), 276-94.
    • (2003) ACM Transactions on Modeling and Computer Simulation , vol.13 , Issue.3 , pp. 276-294
    • Ghosh, S.1    Henderson, S.G.2
  • 17
    • 84933516758 scopus 로고
    • A distribution-free approach to inducing rank correlations among input variables
    • Iman, R. L. & Conover, W. J. (1982), A distribution-free approach to inducing rank correlations among input variables, Communications in Statistics, 11 (3), 311-34.
    • (1982) Communications in Statistics , vol.11 , Issue.3 , pp. 311-334
    • Iman, R.L.1    Conover, W.J.2
  • 18
    • 0032276818 scopus 로고    scopus 로고
    • Project scheduling using state-based probabilistic decision networks
    • in Washington DC
    • Ioannou, P. G. & Martinez, J. C. (1998), Project scheduling using state-based probabilistic decision networks, in Proceedings of the Winter Simulation Conference, Washington DC, 1287-95.
    • (1998) Proceedings of the Winter Simulation Conference , pp. 1287-1295
    • Ioannou, P.G.1    Martinez, J.C.2
  • 21
    • 0042436441 scopus 로고
    • Normally distributed activity durations in PERT networks
    • Kamburowski, J. (1985), Normally distributed activity durations in PERT networks, Journal of the Operational Research Society, 36, 1051-7.
    • (1985) Journal of the Operational Research Society , vol.36 , pp. 1051-1057
    • Kamburowski, J.1
  • 22
  • 24
    • 14544303228 scopus 로고    scopus 로고
    • Probability of project completion using stochastic project scheduling simulation (SPSS)
    • Lee, D. E. (2005), Probability of project completion using stochastic project scheduling simulation (SPSS), Journal of Construction Engineering and Management, ASCE, 131 (3), 310-8.
    • (2005) Journal of Construction Engineering and Management, ASCE , vol.131 , Issue.3 , pp. 310-318
    • Lee, D.E.1
  • 25
    • 32944482015 scopus 로고    scopus 로고
    • Automated statistical analysis in stochastic project scheduling simulation
    • Lee, D. E. & Arditi, D. (2006), Automated statistical analysis in stochastic project scheduling simulation, Journal of Construction Engineering and Management, ASCE, 132 (3), 268-77.
    • (2006) Journal of Construction Engineering and Management, ASCE , vol.132 , Issue.3 , pp. 268-277
    • Lee, D.E.1    Arditi, D.2
  • 26
    • 0002068657 scopus 로고
    • Using knowledge of construction and project management for automated schedule updating
    • Levitt, R. E. & Kunz, J. C. (1985), Using knowledge of construction and project management for automated schedule updating, Project Management Journal, 16 (5), 57-76.
    • (1985) Project Management Journal , vol.16 , Issue.5 , pp. 57-76
    • Levitt, R.E.1    Kunz, J.C.2
  • 28
    • 0002399812 scopus 로고
    • The percentage points of the normal distribution
    • Odeh, R. E. & Evans, J. O. (1974), The percentage points of the normal distribution, Applied Statistics, 23, 96-7.
    • (1974) Applied Statistics , vol.23 , pp. 96-97
    • Odeh, R.E.1    Evans, J.O.2
  • 30
    • 34250369842 scopus 로고    scopus 로고
    • PALISADE. Available at
    • PALISADE. (2005), @RISK 4.1 for Project. Available at http://www.palisade.com/riskproject/.
    • (2005) @RISK 4.1 for Project
  • 31
    • 38249020510 scopus 로고
    • Generating random deviates from multivariate Pearson distributions
    • Parrish, R. S. (1990), Generating random deviates from multivariate Pearson distributions, Computational Statistics and Data Analysis, 9, 283-95.
    • (1990) Computational Statistics and Data Analysis , vol.9 , pp. 283-295
    • Parrish, R.S.1
  • 33
    • 0001943262 scopus 로고
    • Treatment of correlation for risk analysis of engineering projects
    • Ranasinghe, M. & Russell, A. D. (1992), Treatment of correlation for risk analysis of engineering projects, Civil Engineering Systems, 9, 17-39.
    • (1992) Civil Engineering Systems , vol.9 , pp. 17-39
    • Ranasinghe, M.1    Russell, A.D.2
  • 34
    • 0001749810 scopus 로고
    • On the generation of normal random vectors
    • Scheuer, E. M. & Stoller, D. S. (1962), On the generation of normal random vectors, Technometrics, 4, 278-81.
    • (1962) Technometrics , vol.4 , pp. 278-281
    • Scheuer, E.M.1    Stoller, D.S.2
  • 35
    • 0035691378 scopus 로고    scopus 로고
    • Some myths and common errors in simulation experiments
    • in Arlington, VA
    • Schmeiser, B. W. (2001), Some myths and common errors in simulation experiments, in Proceedings of the Winter Simulation Conference, Arlington, VA, 39-46.
    • (2001) Proceedings of the Winter Simulation Conference , pp. 39-46
    • Schmeiser, B.W.1
  • 39
    • 0000738834 scopus 로고
    • Monte-Carlo methods and the PERT problem
    • Van Slyke, R. M. (1963), Monte-Carlo methods and the PERT problem, Operations Research, 5 (11), 839-60.
    • (1963) Operations Research , vol.5 , Issue.11 , pp. 839-860
    • Van Slyke, R.M.1
  • 42
    • 18544385344 scopus 로고    scopus 로고
    • Impact of budget uncertainty on project time-cost tradeoff
    • Yang, I. T. (2005a), Impact of budget uncertainty on project time-cost tradeoff, IEEE Transactions on Engineering Management, IEEE, 52 (2), 167-74.
    • (2005) IEEE Transactions on Engineering Management, IEEE , vol.52 , Issue.2 , pp. 167-174
    • Yang, I.T.1
  • 43
    • 18144422742 scopus 로고    scopus 로고
    • Simulation-based estimation for correlated cost elements
    • Yang, I. T. (2005b), Simulation-based estimation for correlated cost elements, International Journal of Project Management, 23 (4), 275-82.
    • (2005) International Journal of Project Management , vol.23 , Issue.4 , pp. 275-282
    • Yang, I.T.1
  • 44
    • 24944537152 scopus 로고    scopus 로고
    • Chance-constrained time-cost tradeoff analysis considering funding variability
    • Yang, I. T. (2005c), Chance-constrained time-cost tradeoff analysis considering funding variability, Journal of Construction Engineering and Management, ASCE, 131 (9), 1002-12.
    • (2005) Journal of Construction Engineering and Management, ASCE , vol.131 , Issue.9 , pp. 1002-1012
    • Yang, I.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.