-
1
-
-
2542481936
-
Probability model and its influence on reliability for protection system
-
HONG Mei, DING Ming, DAI Renchang. Probability model and its influence on reliability for protection system. Power System Technology, 1997, 21 (8): 44-48.
-
(1997)
Power System Technology
, vol.21
, Issue.8
, pp. 44-48
-
-
Hong, M.1
Ding, M.2
Dai, R.3
-
2
-
-
0026923654
-
An improved model for protective system reliability
-
ANDERSON P M, AGGARWAL S K. An improved model for protective system reliability. IEEE Trans on Power Delivery, 1992, 41 (3): 422-426.
-
(1992)
IEEE Trans on Power Delivery
, vol.41
, Issue.3
, pp. 422-426
-
-
Anderson, P.M.1
Aggarwal, S.K.2
-
3
-
-
0037662911
-
Power system reliability analysis considering protection failures
-
Jul 21-25, 2002, Chicago, IL, USA. Piscataway, NJ, USA: IEEE
-
YU Xingbin, SINGH Chanan. Power system reliability analysis considering protection failures// Proceedings of IEEE Power Engineering Society Summer Meeting, Vol 2, Jul 21-25, 2002, Chicago, IL, USA. Piscataway, NJ, USA: IEEE, 2002: 963-968.
-
(2002)
Proceedings of IEEE Power Engineering Society Summer Meeting
, vol.2
, pp. 963-968
-
-
Yu, X.1
Singh, C.2
-
4
-
-
34248364822
-
Markov model for reliability analysis of dualredundant relays
-
WANG Shuchun. Markov model for reliability analysis of dualredundant relays. Relay, 2005, 23 (18): 6-10
-
(2005)
Relay
, vol.23
, Issue.18
, pp. 6-10
-
-
Wang, S.1
-
5
-
-
0035376935
-
Study of reliability and optimal routine test interval of protective relays
-
LI Yongli, LI Zhizhong, YANG Wei. Study of reliability and optimal routine test interval of protective relays. Proceedings of the CSEE, 2001, 21 (6): 63-65.
-
(2001)
Proceedings of the CSEE
, vol.21
, Issue.6
, pp. 63-65
-
-
Li, Y.1
Li, Z.2
Yang, W.3
-
6
-
-
0029289687
-
Predicting the optimum routine test interval for protective relays
-
KUMM J J, WEBER M S, SCHWEITER E O. Predicting the optimum routine test interval for protective relays. IEEE Trans on Power Delivery, 1995, 10 (2): 659-664.
-
(1995)
IEEE Trans on Power Delivery
, vol.10
, Issue.2
, pp. 659-664
-
-
Kumm, J.J.1
Weber, M.S.2
Schweiter, E.O.3
-
7
-
-
0003776432
-
Reliability evaluation of power system
-
Zhou J. and Ren Z.(transl.), Chongqing: Chongqing Subsidiary Press of Science and Technique Literature Press
-
BILLINTON R, ALLAN R N. Reliability evaluation of power system. ZHOU Jiaqi, REN Zhen, trans. Chongqing: Chongqing Subsidiary Press of Science and Technique Literature Press, 1986.
-
(1986)
-
-
Billinton, R.1
Allan, R.N.2
-
8
-
-
0032645130
-
Model and algorithm of reliability evaluation for large power systems
-
REN Zhen, CHEN Jun, HUANG Wenying, et al. Model and algorithm of reliability evaluation for large power systems. Automation of Electric Power Systems, 1999, 23 (5): 25-27.
-
(1999)
Automation of Electric Power Systems
, vol.23
, Issue.5
, pp. 25-27
-
-
Ren, Z.1
Chen, J.2
Huang, W.3
-
9
-
-
0020766624
-
Composite generation and transmission system adequency evaluation including protection system failure modes
-
BILLINTON R, TATLA J. Composite generation and transmission system adequency evaluation including protection system failure modes. IEEE Trans on Power Apparatus and Systems, 1983, 102 (6): 1823-1830.
-
(1983)
IEEE Trans on Power Apparatus and Systems
, vol.102
, Issue.6
, pp. 1823-1830
-
-
Billinton, R.1
Tatla, J.2
-
10
-
-
0035839011
-
Studies on cascading faults of complicated power systems
-
BIE Zhaohong, WANG Xifan. Studies on cascading faults of complicated power systems. Automation of Electric Power Systems, 2001, 25 (15): 25-28.
-
(2001)
Automation of Electric Power Systems
, vol.25
, Issue.15
, pp. 25-28
-
-
Bie, Z.1
Wang, X.2
-
11
-
-
0035950217
-
Studies on models and algorithms of reliability evaluation for cascading faults of complicated power systems
-
BIE Zhaohong, WANG Xifan. Studies on models and algorithms of reliability evaluation for cascading faults of complicated power systems. Automation of Electric Power Systems, 2001, 25 (20): 30-34.
-
(2001)
Automation of Electric Power Systems
, vol.25
, Issue.20
, pp. 30-34
-
-
Bie, Z.1
Wang, X.2
-
12
-
-
0035839906
-
Reliability of power systems and power equipment
-
GUO Yongji. Reliability of Power Systems and Power Equipment. Automation of Electric Power Systems, 2001, 25 (17): 53-56.
-
(2001)
Automation of Electric Power Systems
, vol.25
, Issue.17
, pp. 53-56
-
-
Guo, Y.1
-
13
-
-
0037908929
-
Prediction of original reliability parameter of power systems by an improved grey model
-
REN Zhen, WAN Guanquan, HUANG Jinfeng, et al. Prediction of original reliability parameter of power systems by an improved grey model. Automation of Electric Power Systems, 2003, 27 (4): 37-40.
-
(2003)
Automation of Electric Power Systems
, vol.27
, Issue.4
, pp. 37-40
-
-
Ren, Z.1
Wan, G.2
Huang, J.3
-
14
-
-
3142572912
-
Quantitative evaluation of substation supply reliability
-
ZHOU Zhichao, ZHANG Yan, WANG Wei, et al. Quantitative evaluation of substation supply reliability. Automation of Electric Power Systems, 2004, 28 (9): 66-69.
-
(2004)
Automation of Electric Power Systems
, vol.28
, Issue.9
, pp. 66-69
-
-
Zhou, Z.1
Zhang, Y.2
Wang, W.3
-
15
-
-
10444227435
-
Interval method for power station and substation reliability evaluation
-
ZHANG Peng, GUO Yongji. Interval method for power station and substation reliability evaluation. Automation of Electric Power Systems, 2004, 28 (19): 48-52.
-
(2004)
Automation of Electric Power Systems
, vol.28
, Issue.19
, pp. 48-52
-
-
Zhang, P.1
Guo, Y.2
|