-
1
-
-
0032682389
-
Scheduling with time dependent processing times: Review and extensions
-
Alidaee B., and Womer N.K. Scheduling with time dependent processing times: Review and extensions. Journal of the Operational Research Society 50 (1999) 711-720
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 711-720
-
-
Alidaee, B.1
Womer, N.K.2
-
2
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi A., Gupta J.N.D., and Aldowaisan T. A review of scheduling research involving setup considerations. OMEGA 27 (1999) 219-239
-
(1999)
OMEGA
, vol.27
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
3
-
-
34248216095
-
-
A. Allahverdi, C.T. Ng, T.C.E. Cheng, M.Y. Kovalyov, A survey of scheduling problems with setup times or costs, European Journal of Operational Research 2006, in press.
-
-
-
-
4
-
-
21244485304
-
Reverse logistics: a framework
-
Dekker R., Fleischmann M., Inderfurth K., and van Wassenhove L.N. (Eds), Springer
-
de Brito M., and Dekker R. Reverse logistics: a framework. In: Dekker R., Fleischmann M., Inderfurth K., and van Wassenhove L.N. (Eds). Reverse Logistics - Quantitative Models for Closed-Loop Supply Chains (2004), Springer 3-27
-
(2004)
Reverse Logistics - Quantitative Models for Closed-Loop Supply Chains
, pp. 3-27
-
-
de Brito, M.1
Dekker, R.2
-
5
-
-
10644241667
-
Parallel machine selection and job scheduling to minimize machine cost and job tardiness
-
Cao D., Chen M.Y., and Wan G.H. Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Computers and Operations Research 32 (2005) 1995-2012
-
(2005)
Computers and Operations Research
, vol.32
, pp. 1995-2012
-
-
Cao, D.1
Chen, M.Y.2
Wan, G.H.3
-
6
-
-
8344241149
-
Better online algorithms for scheduling with machine cost
-
Dosa G., and He Y. Better online algorithms for scheduling with machine cost. SIAM Journal on Computing 33 (2004) 1035-1051
-
(2004)
SIAM Journal on Computing
, vol.33
, pp. 1035-1051
-
-
Dosa, G.1
He, Y.2
-
10
-
-
0004065150
-
-
Irwin, Boston
-
Gitlow H., Gitlow S., Oppenheim A., and Oppenheim R. Tools and Methods for the Improvement of Quality (1989), Irwin, Boston
-
(1989)
Tools and Methods for the Improvement of Quality
-
-
Gitlow, H.1
Gitlow, S.2
Oppenheim, A.3
Oppenheim, R.4
-
14
-
-
34248229647
-
-
K. Inderfurth, M.Y. Kovalyov, C.T. Ng, F. Werner, Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables, International Journal of Production Economics, in press.
-
-
-
-
15
-
-
34248222566
-
-
K. Inderfurth, G. Lindner, N.P. Rahaniotis, Lotsizing in a production system with rework and product deterioration, Preprint 1/2003, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany, 2003.
-
-
-
-
16
-
-
27344460910
-
Production planning and control of closed-loop supply chains
-
Guide Jr. V.D.R., and van Wassenhove L.N. (Eds), Carnegie Mellon University Press
-
Inderfurth K., and Teunter R.H. Production planning and control of closed-loop supply chains. In: Guide Jr. V.D.R., and van Wassenhove L.N. (Eds). Business Perspectives on Closed-loop Supply Chains (2003), Carnegie Mellon University Press 149-173
-
(2003)
Business Perspectives on Closed-loop Supply Chains
, pp. 149-173
-
-
Inderfurth, K.1
Teunter, R.H.2
-
17
-
-
17644385525
-
Preemptive online algorithms for scheduling with machine cost
-
Jiang Y.W., and He Y. Preemptive online algorithms for scheduling with machine cost. Acta Informatica 41 (2005) 315-340
-
(2005)
Acta Informatica
, vol.41
, pp. 315-340
-
-
Jiang, Y.W.1
He, Y.2
-
18
-
-
34248227299
-
-
4n) time algorithm for a discrete EOQ problem, submitted for publication.
-
-
-
-
19
-
-
0036568109
-
Single operation earliness-tardiness scheduling with machine activation costs
-
Panwalkar S.S., and Liman S.D. Single operation earliness-tardiness scheduling with machine activation costs. IIE Transactions 34 (2002) 509-513
-
(2002)
IIE Transactions
, vol.34
, pp. 509-513
-
-
Panwalkar, S.S.1
Liman, S.D.2
-
21
-
-
1342332973
-
Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
-
Teunter R.H., and Flapper S.D.P. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 25 (2003) 85-96
-
(2003)
OR Spectrum
, vol.25
, pp. 85-96
-
-
Teunter, R.H.1
Flapper, S.D.P.2
|