메뉴 건너뛰기




Volumn 56, Issue 4, 2007, Pages 358-368

Benchmarking masonry labor productivity

Author keywords

Benchmarking; Construction industry; Labor efficiency; Labour utilization; Palestine; Productivity rate

Indexed keywords


EID: 34247356141     PISSN: 17410401     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410400710745342     Document Type: Article
Times cited : (33)

References (21)
  • 1
    • 34247400055 scopus 로고    scopus 로고
    • "Improving construction labor productivity in Egypt using benchmarking", Banha Higher Institute of Technology, Banha
    • Abdel-Hamid, M., Abd Elshakour, H. and Abdel-Razek, R. (2004), "Improving construction labor productivity in Egypt using benchmarking", Banha Higher Institute of Technology, Banha.
    • (2004)
    • Abdel-Hamid, M.1    Abd Elshakour, H.2    Abdel-Razek, R.3
  • 3
    • 33846372659 scopus 로고    scopus 로고
    • Productivity of Egyptian temporary labor in excavation work
    • Abdel-Razek, R.H. (2004), "Productivity of Egyptian temporary labor in excavation work", Journal of Egyptian Society of Engineers, Vol. 43 No. 3, pp. 3-8.
    • (2004) Journal of Egyptian Society of Engineers , vol.43 , Issue.3 , pp. 3-8
    • Abdel-Razek, R.H.1
  • 5
    • 34247333199 scopus 로고
    • Evaluating variability in labor productivity
    • International Project Management Association, Egypt
    • Abdel-Razek, R.H. and McCaffer, R. (1990), "Evaluating variability in labor productivity", Proceedings of the 3rd International Symposium, International Project Management Association, Egypt, pp. 527-50.
    • (1990) Proceedings of the 3rd International Symposium , pp. 527-50
    • Abdel-Razek, R.H.1    McCaffer, R.2
  • 8
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G. and Howell, G. (1998), "Shielding production: essential step in production control", Journal of Construction Management & Engineering, Vol. 124 No. 1, pp. 11-17.
    • (1998) Journal of Construction Management & Engineering , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 10
    • 48749140308 scopus 로고
    • Construction productivity
    • Ganesan, S. (1984), "Construction productivity", Habitat International, Vol. 8 Nos 3/4, pp. 29-42.
    • (1984) Habitat International , vol.8 , Issue.34 , pp. 29-42
    • Ganesan, S.1
  • 13
    • 0026837613 scopus 로고
    • Effects of scheduled overtime on labor productivity
    • Thomas, R.H. (1994), "Effects of scheduled overtime on labor productivity", Journal of Construction Engineering and Management, Vol. 118 No. 1, pp. 60-7.
    • (1994) Journal of Construction Engineering and Management , vol.118 , Issue.1 , pp. 60-7
    • Thomas, R.H.1
  • 19
    • 0028393273 scopus 로고
    • Action response model and loss productivity in construction
    • Halligan, D.W. (1994), "Action response model and loss productivity in construction", Journal of Construction Engineering and Management, Vol. 120 No. 1, pp. 47-62.
    • (1994) Journal of Construction Engineering and Management , vol.120 , Issue.1 , pp. 47-62
    • Halligan, D.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.