메뉴 건너뛰기




Volumn 1, Issue , 2007, Pages 372-375

Cementing considerations for casing while drilling: Case history

Author keywords

[No Author keywords available]

Indexed keywords

DRILL PIPE; OIL WELL CASINGS; OIL WELL CEMENTING; OPERATIONS RESEARCH;

EID: 34147188525     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (7)

References (2)
  • 1
    • 0027865843 scopus 로고    scopus 로고
    • Improve Primary Cementing by Continuous Monitoring of Circulatable Hole
    • paper SPE 26574 presented at the, Houston, October 3-6
    • Ravi, K.M., Beirute, R.M. and Covington, R.L.: "Improve Primary Cementing by Continuous Monitoring of Circulatable Hole", paper SPE 26574 presented at the 1993 SPE Annual Technical Conference and Exhibition, Houston, October 3-6.
    • 1993 SPE Annual Technical Conference and Exhibition
    • Ravi, K.M.1    Beirute, R.M.2    Covington, R.L.3
  • 2
    • 22344456727 scopus 로고    scopus 로고
    • Improved Wellbore Stability Achieved with Casing Drilling Operations through Drilling Fluids Smear Effect
    • paper WOCWD-0431-04 presented at the, Houston, March 30-31
    • Fontenot, K., Strickler, R. and Molina, P.: "Improved Wellbore Stability Achieved with Casing Drilling Operations through Drilling Fluids "Smear Effect", paper WOCWD-0431-04 presented at the World Oil 2004 Casing while Drilling Technical Conference, Houston, March 30-31.
    • World Oil 2004 Casing while Drilling Technical Conference
    • Fontenot, K.1    Strickler, R.2    Molina, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.