|
Volumn 2, Issue , 2006, Pages 7220-7224
|
Heuristic-tabu-genetic algorithm based method for flowshop scheduling to minimize flowtime
|
Author keywords
Constructive heuristic; Flexible resources; Flowshop scheduling; Genetic algorithm
|
Indexed keywords
CHROMOSOMES;
GENETIC ALGORITHMS;
HEURISTIC METHODS;
MUTAGENESIS;
OPTIMIZATION;
PROBLEM SOLVING;
CONSTRUCTIVE HEURISTICS;
FLEXIBLE RESOURCES;
FLOWSHOP SCHEDULING;
POPULATION MANAGEMENT;
SCHEDULING;
|
EID: 34047210410
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/WCICA.2006.1714487 Document Type: Conference Paper |
Times cited : (3)
|
References (10)
|