메뉴 건너뛰기




Volumn 18, Issue 3, 2007, Pages 190-202

A stochastic programming model for production planning of perishable products with postponement

Author keywords

Perishable; Postponement; Production management; Stochastic programming

Indexed keywords

DATA STRUCTURES; JOB ANALYSIS; PARAMETER ESTIMATION; PRODUCTION CONTROL; PRODUCTION ENGINEERING;

EID: 33947696633     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280601009047     Document Type: Article
Times cited : (19)

References (14)
  • 1
    • 0035322377 scopus 로고    scopus 로고
    • Capacitated multi-item inventory systems with random and seasonally fluctuating demand: Implications for postponement strategies
    • Aviv, Y. and Federgruen, A., Capacitated multi-item inventory systems with random and seasonally fluctuating demand: implications for postponement strategies. Manage. Sci., 2001a, 47, 512-531.
    • (2001) Manage. Sci , vol.47 , pp. 512-531
    • Aviv, Y.1    Federgruen, A.2
  • 2
    • 0034750213 scopus 로고    scopus 로고
    • Design for postponement: A comprehensive characterisation of its benefits under unknown demand distribution
    • Aviv, Y. and Federgruen, A., Design for postponement: a comprehensive characterisation of its benefits under unknown demand distribution. Oper. Res., 2001b, 49, 578-598.
    • (2001) Oper. Res , vol.49 , pp. 578-598
    • Aviv, Y.1    Federgruen, A.2
  • 3
    • 0000813562 scopus 로고
    • Linear programming under uncertainty
    • Dantzig, G.B., Linear programming under uncertainty. Manage. Sci., 1955, 1, 197-206.
    • (1955) Manage. Sci , vol.1 , pp. 197-206
    • Dantzig, G.B.1
  • 4
    • 0031198604 scopus 로고    scopus 로고
    • On postponement strategies for product families with multiple points of differentiation
    • Garg, A. and Tang, C.S., On postponement strategies for product families with multiple points of differentiation. IIE Trans., 1997, 29, 641-650.
    • (1997) IIE Trans , vol.29 , pp. 641-650
    • Garg, A.1    Tang, C.S.2
  • 5
    • 0035261934 scopus 로고    scopus 로고
    • Generating scenario trees for multistage decision problems
    • Høyland, K. and Wallace, S.W., Generating scenario trees for multistage decision problems. Manage. Sci., 2001, 47, 295-307.
    • (2001) Manage. Sci , vol.47 , pp. 295-307
    • Høyland, K.1    Wallace, S.W.2
  • 7
    • 33645212656 scopus 로고    scopus 로고
    • Multi-period aggregate production planning in a news-vendor framework
    • Kogan, K. and Portougal, V., Multi-period aggregate production planning in a news-vendor framework. J. Oper. Res. Soc., 2006, 57, 423-433.
    • (2006) J. Oper. Res. Soc , vol.57 , pp. 423-433
    • Kogan, K.1    Portougal, V.2
  • 8
    • 0000967383 scopus 로고
    • Design products and processes for postponement
    • edited by S. Dasu and C. Eastman, pp, Kluwer: Boston, MA
    • Lee, H.L. and Billington, C., Design products and processes for postponement. In Management of Design: Engineering and Management Perspectives, edited by S. Dasu and C. Eastman, pp. 105-122, 1994 (Kluwer: Boston, MA).
    • (1994) Management of Design: Engineering and Management Perspectives , pp. 105-122
    • Lee, H.L.1    Billington, C.2
  • 9
    • 4444286146 scopus 로고    scopus 로고
    • A robust optimisation model for stochastic aggregate production planning
    • Leung, S.C.H. and Wu, Y., A robust optimisation model for stochastic aggregate production planning. Prod. Plan. & Com., 2004, 15, 502-514.
    • (2004) Prod. Plan. & Com , vol.15 , pp. 502-514
    • Leung, S.C.H.1    Wu, Y.2
  • 10
    • 0018011294 scopus 로고
    • A stochastic programming model for aggregate production planning
    • Lockett, A.G. and Muhlemann, A.P., A stochastic programming model for aggregate production planning. Euro. J. Oper. Res., 1978, 2, 350-356.
    • (1978) Euro. J. Oper. Res , vol.2 , pp. 350-356
    • Lockett, A.G.1    Muhlemann, A.P.2
  • 11
    • 0002385437 scopus 로고    scopus 로고
    • Supply chain postponement and speculation strategies: How to choose the right strategy
    • Pagh, J.D. and Cooper, M.C., Supply chain postponement and speculation strategies: how to choose the right strategy. J. Busi. Logist., 1998, 19, 13-33.
    • (1998) J. Busi. Logist , vol.19 , pp. 13-33
    • Pagh, J.D.1    Cooper, M.C.2
  • 13
    • 0342656199 scopus 로고    scopus 로고
    • An aggregate production planning model with demand under uncertainty
    • Silva Filho, O.S., An aggregate production planning model with demand under uncertainty. Prod. Plan. & Cont., 1999, 10, 745-756.
    • (1999) Prod. Plan. & Cont , vol.10 , pp. 745-756
    • Silva Filho, O.S.1
  • 14
    • 0035252557 scopus 로고    scopus 로고
    • The rediscovery of postponement a literature review and directions for research
    • van Hoek, R.I., The rediscovery of postponement a literature review and directions for research. J. Oper. Res., 2001, 19, 161-184.
    • (2001) J. Oper. Res , vol.19 , pp. 161-184
    • van Hoek, R.I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.