A heuristic for the long-term electricity generation planning problem using the Bloom and Gallant formulation

Author keywords

Energy; Heuristics; Large scale optimization; Quadratic programming; Stochastic programming

Indexed keywords

ELECTRIC POWER GENERATION; ELECTRIC POWER UTILIZATION; ELECTRONIC COMMERCE; MATHEMATICAL MODELS; QUADRATIC PROGRAMMING; STOCHASTIC PROGRAMMING;

EID: 33947682319     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.10.070     Document Type: Article
Times cited : (7)

References (16)
  • 1
    • 0001168877 scopus 로고
    • Simulation de l'explotation d'un parc de machines thermiques de production d'électricité couplé àdes stations de pompage
    • Balériaux H., Jamoulle E., and Linard de Gertechin F. Simulation de l'explotation d'un parc de machines thermiques de production d'électricité couplé àdes stations de pompage. Revue E de la Soc. Royale Belge des Electriciens 7 (1967) 225-245
    • (1967) Revue E de la Soc. Royale Belge des Electriciens , vol.7 , pp. 225-245
    • Balériaux, H.1    Jamoulle, E.2    Linard de Gertechin, F.3
  • 2
    • 0028424920 scopus 로고
    • Modeling dispatch constraints in production cost simulations based on the equivalent load method
    • Bloom J.A., and Gallant L. Modeling dispatch constraints in production cost simulations based on the equivalent load method. IEEE Transactions on Power Systems 9 2 (1994) 598-611
    • (1994) IEEE Transactions on Power Systems , vol.9 , Issue.2 , pp. 598-611
    • Bloom, J.A.1    Gallant, L.2
  • 3
    • 33947633155 scopus 로고    scopus 로고
    • A.J. Conejo, Optimal utilization of electricity storage reservoirs: Efficient algorithms embedded in probabilistic production costing models, Unpublished MSc thesis, EECS Department, MIT, Cambridge, MA, USA, August 1987.
  • 4
    • 33947612743 scopus 로고    scopus 로고
    • CPLEX Optimization Inc., Using the CPLEX Callable Library. User's Manual, version 4.0, 1985.
  • 5
    • 0001391104 scopus 로고
    • Decomposition principle for linear programmes
    • Dantzig G.B., and Wolfe P. Decomposition principle for linear programmes. Operations Research 8 (1960) 101-110
    • (1960) Operations Research , vol.8 , pp. 101-110
    • Dantzig, G.B.1    Wolfe, P.2
  • 6
    • 0002826414 scopus 로고
    • A suggested computation for maximal multicommodity network flows
    • Ford L.R., and Fulkerson D.R. A suggested computation for maximal multicommodity network flows. Management Science 5 (1958) 97-101
    • (1958) Management Science , vol.5 , pp. 97-101
    • Ford, L.R.1    Fulkerson, D.R.2
  • 9
    • 0000737575 scopus 로고    scopus 로고
    • Warm start of the primal-dual method applied in the cutting-plane scheme
    • Gondzio J. Warm start of the primal-dual method applied in the cutting-plane scheme. Mathematical Programming 83 (1998) 125-143
    • (1998) Mathematical Programming , vol.83 , pp. 125-143
    • Gondzio, J.1
  • 10
    • 0035248049 scopus 로고    scopus 로고
    • Long-term thermal power planning at VEW ENERGIE using a multi-interval Bloom and Gallant method
    • Nabona N., Gil C., and Albrecht J. Long-term thermal power planning at VEW ENERGIE using a multi-interval Bloom and Gallant method. IEEE Transactions on Power Systems 16 1 (2001) 69-77
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.1 , pp. 69-77
    • Nabona, N.1    Gil, C.2    Albrecht, J.3
  • 11
    • 33947645013 scopus 로고    scopus 로고
    • N. Nabona, A. Pagès, Long-term electric power planning in a competitive market using the Bloom and Gallant procedure and a modeling language. Technical Report DR2002/24, Dept. Estadística i Inv. Operativa, Univ. Politèc. de Catalunya, 08028 Barcelona, 2002. Available from: .
  • 12
    • 33947636833 scopus 로고    scopus 로고
    • N. Nabona, A. Pagès, Long-term electric power planning in liberalized markets using the Bloom and Gallant formulation, in: A. Alonso-Ayuso, E. Cerdá, L.F. Escudero, R. Sala (Eds.), Optimización bajo Incertidumbre, Tirant lo Blanch, Valencia 46010, Spain, 2004, pp. 185-211, ISBN 84-8456-100-3.
  • 13
    • 33947706939 scopus 로고    scopus 로고
    • A. Pagès, Procediment de Bloom i Gallant de planificació a llarg termini d'unitats tèrmiques de generació elèctrica usant la descomposició de Dantzig-Wolfe, Final-year project, Facultat de Matemàtiques i Estadística, Univ. Politècnica de Catalunya, 08028 Barcelona, 2002.
  • 14
    • 33947673091 scopus 로고    scopus 로고
    • A. Pagès, N. Nabona, Long-term electric power planning using the Bloom and Gallant's linear model: A comparison of solution techniques, Technical report DR2002/25, Dept. Estadística i Inv. Operativa, Univ. Politèc. de Catalunya, 08028 Barcelona, 2002.
  • 15
    • 0034186748 scopus 로고    scopus 로고
    • Multi-period probabilistic production cost model including dispatch constraints
    • Pérez-Ruiz J., and Conejo A.J. Multi-period probabilistic production cost model including dispatch constraints. IEEE Transactions on Power Systems 15 2 (2000) 502-507
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.2 , pp. 502-507
    • Pérez-Ruiz, J.1    Conejo, A.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.