메뉴 건너뛰기




Volumn 2006, Issue , 2006, Pages 325-329

An adaptive fuzzy PID control of hydro-turbine governor

Author keywords

Adaptive fuzzy control; Hydro turbine governor; PID control; Simulation

Indexed keywords

COMPUTER SIMULATION; DYNAMIC MODELS; FUZZY CONTROL; HYDRAULIC TURBINES; PARAMETER ESTIMATION; THREE TERM CONTROL SYSTEMS;

EID: 33947281631     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICMLC.2006.259032     Document Type: Conference Paper
Times cited : (10)

References (8)
  • 1
    • 33947242020 scopus 로고    scopus 로고
    • O.P.Malik, G.S. Hope Ye Luqing, Wei Shouping and Xu Haibo,An intelligent self-improving control strategy with a variable structure and time-varying parameters for water turbine governor Revue Generate de l'Electricite, Pairs, No.4, pp.23-35, 1989.
    • O.P.Malik, G.S. Hope Ye Luqing, Wei Shouping and Xu Haibo,"An intelligent self-improving control strategy with a variable structure and time-varying parameters for water turbine governor" Revue Generate de l'Electricite, Pairs, No.4, pp.23-35, 1989.
  • 2
    • 0024732859 scopus 로고
    • Optimal PID gain schedule for hydrogenerators design and application
    • Sept, pp
    • G.Orelind, "Optimal PID gain schedule for hydrogenerators design and application", IEEE Trans. on Energy Conversion, Vol.4, No.3, Sept, pp.263-297, 1989.
    • (1989) IEEE Trans. on Energy Conversion , vol.4 , Issue.3 , pp. 263-297
    • Orelind, G.1
  • 3
    • 0034329842 scopus 로고    scopus 로고
    • Reproducing oscillatory behaviour of a hydroelectric power station by computer simulation
    • Mansoor SP, Jones DI, Bradley DA, Aris FC, Jones GR,"Reproducing oscillatory behaviour of a hydroelectric power station by computer simulation."Control Eng Practice 8, pp. 1261-1272, 2000.
    • (2000) Control Eng Practice , vol.8 , pp. 1261-1272
    • Mansoor, S.P.1    Jones, D.I.2    Bradley, D.A.3    Aris, F.C.4    Jones, G.R.5
  • 4
    • 0028546873 scopus 로고
    • Field test to validate hydro turbine-governor model struvture and parameters
    • Hannett LN, Fardanesh B,"Field test to validate hydro turbine-governor model struvture and parameters."IEEE Trans Power Systems 9, pp1744-1751, 1994.
    • (1994) IEEE Trans Power Systems , vol.9 , pp. 1744-1751
    • Hannett, L.N.1    Fardanesh, B.2
  • 5
    • 0036027580 scopus 로고    scopus 로고
    • Armansyah F, Yorino N,Sasaki HRobust synchronous voltage sources designed controller for power system oscillation damping.Elect Power Energy Systems 24, pp41-49, 2002.
    • Armansyah F, Yorino N,Sasaki H"Robust synchronous voltage sources designed controller for power system oscillation damping."Elect Power Energy Systems 24, pp41-49, 2002.
  • 6
    • 0017469899 scopus 로고    scopus 로고
    • Eilts LE, Schleif FR,Governing features and performance of the first 600 MW hydrogenerating unit at Grand Coulee.'TEEE Trans PAS92, pp457-466, 2003.
    • Eilts LE, Schleif FR,"Governing features and performance of the first 600 MW hydrogenerating unit at Grand Coulee.'TEEE Trans PAS92, pp457-466, 2003.
  • 7
    • 0025445176 scopus 로고
    • Field tests and operation of a duplicate microprocessor-based governor for water turbine and its further development
    • Ye Luqing, Wei Shouping, Li Zhaohui, O.P. Malik and G.S.Hope, "Field tests and operation of a duplicate microprocessor-based governor for water turbine and its further development.",IEEE Trans on Energy Conversion, Vol.5 No.2, pp.25-231, 1990.
    • (1990) IEEE Trans on Energy Conversion , vol.5 , Issue.2 , pp. 25-231
    • Luqing, Y.1    Shouping, W.2    Zhaohui, L.3    Malik, O.P.4    Hope, G.S.5
  • 8
    • 0036748439 scopus 로고    scopus 로고
    • Robust multivariable-cascade governors for hydroturbine controls
    • I.Eker, M.Tumay, "Robust multivariable-cascade governors for hydroturbine controls."Electrical Engineering 84, pp.229-237, 2002.
    • (2002) Electrical Engineering , vol.84 , pp. 229-237
    • Eker, I.1    Tumay, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.