-
1
-
-
33947242020
-
-
O.P.Malik, G.S. Hope Ye Luqing, Wei Shouping and Xu Haibo,An intelligent self-improving control strategy with a variable structure and time-varying parameters for water turbine governor Revue Generate de l'Electricite, Pairs, No.4, pp.23-35, 1989.
-
O.P.Malik, G.S. Hope Ye Luqing, Wei Shouping and Xu Haibo,"An intelligent self-improving control strategy with a variable structure and time-varying parameters for water turbine governor" Revue Generate de l'Electricite, Pairs, No.4, pp.23-35, 1989.
-
-
-
-
2
-
-
0024732859
-
Optimal PID gain schedule for hydrogenerators design and application
-
Sept, pp
-
G.Orelind, "Optimal PID gain schedule for hydrogenerators design and application", IEEE Trans. on Energy Conversion, Vol.4, No.3, Sept, pp.263-297, 1989.
-
(1989)
IEEE Trans. on Energy Conversion
, vol.4
, Issue.3
, pp. 263-297
-
-
Orelind, G.1
-
3
-
-
0034329842
-
Reproducing oscillatory behaviour of a hydroelectric power station by computer simulation
-
Mansoor SP, Jones DI, Bradley DA, Aris FC, Jones GR,"Reproducing oscillatory behaviour of a hydroelectric power station by computer simulation."Control Eng Practice 8, pp. 1261-1272, 2000.
-
(2000)
Control Eng Practice
, vol.8
, pp. 1261-1272
-
-
Mansoor, S.P.1
Jones, D.I.2
Bradley, D.A.3
Aris, F.C.4
Jones, G.R.5
-
4
-
-
0028546873
-
Field test to validate hydro turbine-governor model struvture and parameters
-
Hannett LN, Fardanesh B,"Field test to validate hydro turbine-governor model struvture and parameters."IEEE Trans Power Systems 9, pp1744-1751, 1994.
-
(1994)
IEEE Trans Power Systems
, vol.9
, pp. 1744-1751
-
-
Hannett, L.N.1
Fardanesh, B.2
-
5
-
-
0036027580
-
-
Armansyah F, Yorino N,Sasaki HRobust synchronous voltage sources designed controller for power system oscillation damping.Elect Power Energy Systems 24, pp41-49, 2002.
-
Armansyah F, Yorino N,Sasaki H"Robust synchronous voltage sources designed controller for power system oscillation damping."Elect Power Energy Systems 24, pp41-49, 2002.
-
-
-
-
6
-
-
0017469899
-
-
Eilts LE, Schleif FR,Governing features and performance of the first 600 MW hydrogenerating unit at Grand Coulee.'TEEE Trans PAS92, pp457-466, 2003.
-
Eilts LE, Schleif FR,"Governing features and performance of the first 600 MW hydrogenerating unit at Grand Coulee.'TEEE Trans PAS92, pp457-466, 2003.
-
-
-
-
7
-
-
0025445176
-
Field tests and operation of a duplicate microprocessor-based governor for water turbine and its further development
-
Ye Luqing, Wei Shouping, Li Zhaohui, O.P. Malik and G.S.Hope, "Field tests and operation of a duplicate microprocessor-based governor for water turbine and its further development.",IEEE Trans on Energy Conversion, Vol.5 No.2, pp.25-231, 1990.
-
(1990)
IEEE Trans on Energy Conversion
, vol.5
, Issue.2
, pp. 25-231
-
-
Luqing, Y.1
Shouping, W.2
Zhaohui, L.3
Malik, O.P.4
Hope, G.S.5
-
8
-
-
0036748439
-
Robust multivariable-cascade governors for hydroturbine controls
-
I.Eker, M.Tumay, "Robust multivariable-cascade governors for hydroturbine controls."Electrical Engineering 84, pp.229-237, 2002.
-
(2002)
Electrical Engineering
, vol.84
, pp. 229-237
-
-
Eker, I.1
Tumay, M.2
|