-
2
-
-
0033114757
-
"A review of scheduling research involving set-up considerations"
-
A. Allahverdi, J. N. D. Gupta, and T. Aldowaisan, "A review of scheduling research involving set-up considerations," Omega, vol. 27, pp. 219-240, 1999.
-
(1999)
Omega
, vol.27
, pp. 219-240
-
-
Allahverdi, A.1
Gupta, J.N.D.2
Aldowaisan, T.3
-
3
-
-
0029375874
-
"A multicriteria model for supporting set-up reduction investment decisions"
-
B. Arinze, S. L. Kim, and A. Bannerjee, "A multicriteria model for supporting set-up reduction investment decisions," Production Planning Control, vol. 6, pp. 413-420, 1995.
-
(1995)
Production Planning Control
, vol.6
, pp. 413-420
-
-
Arinze, B.1
Kim, S.L.2
Bannerjee, A.3
-
6
-
-
0028443476
-
"The role of master kits in assembly operations"
-
J. G. Carlson, A. C. Yao, and W. F. Girouard, "The role of master kits in assembly operations," Int. J. Production Econ., vol. 35, pp. 253-258, 1994.
-
(1994)
Int. J. Production Econ.
, vol.35
, pp. 253-258
-
-
Carlson, J.G.1
Yao, A.C.2
Girouard, W.F.3
-
7
-
-
0036670475
-
"What's different about six sigma?"
-
Aug
-
P. Catherwood, "What's different about six sigma?," Manuf. Eng., vol. 8, no. 4, pp. 186-189, Aug. 2002.
-
(2002)
Manuf. Eng.
, vol.8
, Issue.4
, pp. 186-189
-
-
Catherwood, P.1
-
8
-
-
0016026604
-
"Economics of multiple tool setting in presswork"
-
in Feb
-
J. B. Coates, "Economics of multiple tool setting in presswork," in Sheet Metal Ind., Feb. 1974, pp. 73-76.
-
(1974)
Sheet Metal Ind.
, pp. 73-76
-
-
Coates, J.B.1
-
9
-
-
3142685162
-
"Enabling mass customization: Extending build-to-order concepts to supply chains"
-
A. E. Coronado, A. C. Lyons, D. F. Kehoe, and J. Coleman, "Enabling mass customization: Extending build-to-order concepts to supply chains," Production Planning Control, vol. 15, no. 4, pp. 398-411, 2004.
-
(2004)
Production Planning Control
, vol.15
, Issue.4
, pp. 398-411
-
-
Coronado, A.E.1
Lyons, A.C.2
Kehoe, D.F.3
Coleman, J.4
-
10
-
-
0242493313
-
"Sustaining changeover improvement"
-
S. J. Culley, G. W. Owen, A. R. Mileham, and R. I. McIntosh, "Sustaining changeover improvement," J. Eng. Manufacture - Pt B: Proc. Inst. Mech. Eng., vol. 217, no. 10, pp. 1455-1470, 2003.
-
(2003)
J. Eng. Manufacture - Pt B: Proc. Inst. Mech. Eng.
, vol.217
, Issue.10
, pp. 1455-1470
-
-
Culley, S.J.1
Owen, G.W.2
Mileham, A.R.3
McIntosh, R.I.4
-
11
-
-
0001997673
-
"The quick-change artists"
-
I. David, "The quick-change artists," Professional Eng., vol. 10, pp. 31-32, 1997.
-
(1997)
Professional Eng.
, vol.10
, pp. 31-32
-
-
David, I.1
-
12
-
-
0004211809
-
-
Reading, MA: Addison-Wesley
-
S. M. Davis, Future perfect. Reading, MA: Addison-Wesley, 1987.
-
(1987)
Future Perfect
-
-
Davis, S.M.1
-
13
-
-
0347571897
-
"The tools of just-in-time management"
-
Summer
-
M. C. DeLuzio, "The tools of just-in-time management," J. Cost Manage., pp. 13-20, Summer, 1993.
-
(1993)
J. Cost Manage.
, pp. 13-20
-
-
DeLuzio, M.C.1
-
14
-
-
33947248961
-
"Changeover time minimized"
-
P. Doyon, "Changeover time minimized," Connector Specifier, vol. 15, pp. 14-15, 1999.
-
(1999)
Connector Specifier
, vol.15
, pp. 14-15
-
-
Doyon, P.1
-
15
-
-
79961193846
-
"Rapid changeovers - The run up problem"
-
presented at the INESC Porto., Porto, Portugal
-
C. Eldridge, A. R. Mileham, R. I. McIntosh, S. J. Culley, G. W. Owen, and L. B. Newnes, "Rapid changeovers - The run up problem," presented at the 18th ISPE/IFAC Int.Conf. CAD/CAM, Robotics and Factories of the Future, INESC Porto., Porto, Portugal, 2002.
-
(2002)
18th ISPE/IFAC Int.Conf. CAD/CAM, Robotics and Factories of the Future
-
-
Eldridge, C.1
Mileham, A.R.2
McIntosh, R.I.3
Culley, S.J.4
Owen, G.W.5
Newnes, L.B.6
-
17
-
-
0030540736
-
"Set-up reduction in pharmaceutical manufacturing: An action research study"
-
M. Gilmore and D. J. Smith, "Set-up reduction in pharmaceutical manufacturing: An action research study," Int. J. Operations Production Manage., vol. 16, pp. 4-17, 1996.
-
(1996)
Int. J. Operations Production Manage.
, vol.16
, pp. 4-17
-
-
Gilmore, M.1
Smith, D.J.2
-
18
-
-
0004102424
-
-
New York: Dow Jones-Irwin
-
R. W. Hall, Zero Inventories. New York: Dow Jones-Irwin, 1983.
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
20
-
-
0242687745
-
"Faster better changeovers"
-
K. T. Higgins, "Faster better changeovers," Food Eng., vol. 73, no. 7, pp. 46-51, 2001.
-
(2001)
Food Eng.
, vol.73
, Issue.7
, pp. 46-51
-
-
Higgins, K.T.1
-
21
-
-
0242687747
-
"Quick die change concepts"
-
Mar
-
A. Iafrate, "Quick die change concepts," Sheet Metal Ind., vol. 22-23, Mar. 1993.
-
(1993)
Sheet Metal Ind.
, pp. 22-23
-
-
Iafrate, A.1
-
23
-
-
0031630572
-
"Developing measures of time-based manufacturing"
-
X. A. Koufteros, M. A. Vonderembse, and W. J. Doll, "Developing measures of time-based manufacturing," J. Operations Manage., vol. 16, no. 1, pp. 21-41, 1998.
-
(1998)
J. Operations Manage.
, vol.16
, Issue.1
, pp. 21-41
-
-
Koufteros, X.A.1
Vonderembse, M.A.2
Doll, W.J.3
-
24
-
-
0004218204
-
"Set-up reduction: Making JIT work"
-
May
-
D. Lee, "Set-up reduction: Making JIT work," Manage. Services, pp. 8-13, May 1986.
-
(1986)
Manage. Services
, pp. 8-13
-
-
Lee, D.1
-
26
-
-
3142671926
-
"Special issue editorial: The what, why and how of mass customization"
-
I. P. McCarthy, "Special issue editorial: The what, why and how of mass customization," Production Planning Control, vol. 15, no. 4, pp. 347-351, 2004.
-
(2004)
Production Planning Control
, vol.15
, Issue.4
, pp. 347-351
-
-
McCarthy, I.P.1
-
27
-
-
0034691903
-
"A critical evaluation of shingo's SMED (Single Minute Exchange of Die) methodology"
-
R. I. McIntosh, S. J. Culley, A. R. Mileham, and G. W. Owen, "A critical evaluation of shingo's SMED (Single Minute Exchange of Die) methodology," Int. J. Production Res., vol. 38, pp. 2377-2395, 2000.
-
(2000)
Int. J. Production Res.
, vol.38
, pp. 2377-2395
-
-
McIntosh, R.I.1
Culley, S.J.2
Mileham, A.R.3
Owen, G.W.4
-
28
-
-
0004162995
-
-
Oxford, U.K.: Butterworth-Heinemann
-
R. I. McIntosh, S. J. Culley, A. R. Mileham, and G. W. Owen, Improving Changeover Performance. Oxford, U.K.: Butterworth-Heinemann, 2001.
-
(2001)
Improving Changeover Performance
-
-
McIntosh, R.I.1
Culley, S.J.2
Mileham, A.R.3
Owen, G.W.4
-
30
-
-
0029403297
-
"A structured methodology to implement judiciously the right JIT tactics"
-
1B. Prasad, "A structured methodology to implement judiciously the right JIT tactics," Production Planning Control, vol. 6, pp. 564-577, 1995.
-
(1995)
Production Planning Control
, vol.6
, pp. 564-577
-
-
Prasad, I.B.1
-
31
-
-
33947231066
-
"Design for changeover: Enabling the design of highly flexible, highly responsive manufacturing processes"
-
presented at the Klagenfurt, Austria, Jun. 2005
-
M. P. Reik, R. I. McIntosh, G. W. Owen, A. R. Mileham, and C. S. J. 2005, "Design for changeover: Enabling the design of highly flexible, highly responsive manufacturing processes," presented at the Int. Mass Customization Conference (IMCM05), Klagenfurt, Austria, Jun. 2005.
-
(2005)
Int. Mass Customization Conference (IMCM05)
-
-
Reik, M.P.1
McIntosh, R.I.2
Owen, G.W.3
Mileham, A.R.4
Mileham, C.S.J.5
-
33
-
-
34248539177
-
"Flexibility in manufacturing: A survey"
-
A. K. Sethi and S. P. Sethi, "Flexibility in manufacturing: A survey," Int. J. Flexible Manuf. Syst., vol. 2, pp. 289-328, 1990.
-
(1990)
Int. J. Flexible Manuf. Syst.
, vol.2
, pp. 289-328
-
-
Sethi, A.K.1
Sethi, S.P.2
-
36
-
-
0242435460
-
"Achieving faster, more efficient tube mill changeovers"
-
R. Sladky, "Achieving faster, more efficient tube mill changeovers," Tube Pipe J., vol. 9, no. 4, pp. 28-31, 2001.
-
(2001)
Tube Pipe J.
, vol.9
, Issue.4
, pp. 28-31
-
-
Sladky, R.1
-
40
-
-
33947222998
-
-
South West Manufacturing Advisory Service (SWMAS), Dept. Trade Ind., led by C. Hill, Set-up Reduction Forum
-
South West Manufacturing Advisory Service (SWMAS), Dept. Trade Ind., led by C. Hill, Set-up Reduction Forum 2003.
-
(2003)
-
-
-
42
-
-
33947213288
-
"People power: The secret weapon to high speed changeover"
-
presented at the London, U.K., Dec. 13
-
S. Tickle and B. Johnston, "People power: The secret weapon to high speed changeover," presented at the Conf. Rapid Changeover of Food Production Lines, London, U.K., Dec. 13, 2001.
-
(2001)
Conf. Rapid Changeover of Food Production Lines
-
-
Tickle, S.1
Johnston, B.2
-
43
-
-
0027187517
-
"A mathematical model for the economic justification of set-up time reduction"
-
J. Trevino, B. J. Hurley, and W. Friedrich, "A mathematical model for the economic justification of set-up time reduction," Int. J. Production Res., vol. 31, pp. 191-202, 1993.
-
(1993)
Int. J. Production Res.
, vol.31
, pp. 191-202
-
-
Trevino, J.1
Hurley, B.J.2
Friedrich, W.3
-
44
-
-
0029694494
-
"Design for mass customization"
-
M. M. Tseng and J. Jianxin, "Design for mass customization," CIRP Ann., vol. 45, no. 1, pp. 153-156, 1996.
-
(1996)
CIRP Ann.
, vol.45
, Issue.1
, pp. 153-156
-
-
Tseng, M.M.1
Jianxin, J.2
-
46
-
-
3142668947
-
"Manufacturing practices: Antecedents to mass customization"
-
Q. Tu, M. A. Vonderembse, and T. S. Ragu-Nathan, "Manufacturing practices: Antecedents to mass customization," Production Planning Control, vol. 15, no. 4, pp. 373-380, 2004.
-
(2004)
Production Planning Control
, vol.15
, Issue.4
, pp. 373-380
-
-
Tu, Q.1
Vonderembse, M.A.2
Ragu-Nathan, T.S.3
-
47
-
-
0036609402
-
"Rules for integrating fast changeover capabilities into new equipment design"
-
V. D. Goubergen and V. H. Landeghem, "Rules for integrating fast changeover capabilities into new equipment design," Robotics Comput Integr. Manuf., vol. 18, no. 3-4, pp. 205-214, 2002.
-
(2002)
Robotics Comput Integr. Manuf.
, vol.18
, Issue.3-4
, pp. 205-214
-
-
Goubergen, V.D.1
Landeghem, V.H.2
|