-
1
-
-
0025211593
-
Sequencing with Earliness and Tardiness Penalties: A Review
-
Baker, K.R. and G.D. Scudder. (1990). "Sequencing with Earliness and Tardiness Penalties: A Review." Operations Research 38(1), 22-36.
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
2
-
-
0035400523
-
Benchmarks for Scheduling on a Single Machine Against Restrictive and Unrestrictive Common Due Dates
-
Biskup, D. and M. Feldmann. (2001). "Benchmarks for Scheduling on a Single Machine Against Restrictive and Unrestrictive Common Due Dates."Computers and Operations Research 28(8), 787-801.
-
(2001)
Computers and Operations Research
, vol.28
, Issue.8
, pp. 787-801
-
-
Biskup, D.1
Feldmann, M.2
-
4
-
-
0003722376
-
-
Addison-Wesley Publishing Company, Inc, MA
-
Goldberg, D.E. (1989). Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley Publishing Company, Inc., MA.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
5
-
-
0037118177
-
A Survey of the State-of-Art of Common Due Date Assignment and Scheduling Research
-
Gordon, V., J.-M. Proth and C. Chu. (2002). "A Survey of the State-of-Art of Common Due Date Assignment and Scheduling Research." European Journal of Operational Research 139(1), 1-25.
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.1
, pp. 1-25
-
-
Gordon, V.1
Proth, J.-M.2
Chu, C.3
-
7
-
-
0037290972
-
Single-Machine Scheduling for Minimizing Earliness and Tardiness Penalties by Meta-Heuristic Approaches
-
Feldmann, M. and D. Biskup. (2003). "Single-Machine Scheduling for Minimizing Earliness and Tardiness Penalties by Meta-Heuristic Approaches." Computers and Industrial Engineering 44(2), 307-323.
-
(2003)
Computers and Industrial Engineering
, vol.44
, Issue.2
, pp. 307-323
-
-
Feldmann, M.1
Biskup, D.2
-
8
-
-
0031102683
-
Using Tabu Search to Solve the Common Due Date Early/Tardy Machine Scheduling Problem
-
James, R.J.W. (1997). "Using Tabu Search to Solve the Common Due Date Early/Tardy Machine Scheduling Problem." Computers and Operations Research 24(3), 199-208.
-
(1997)
Computers and Operations Research
, vol.24
, Issue.3
, pp. 199-208
-
-
James, R.J.W.1
-
9
-
-
0026223827
-
Earliness-Tardiness Scheduling Problem, II: Deviation of Completion Times About a Restrictive Common Due Date
-
Hall, N.G., W. Kubiak and S.P. Sethi. (1991). "Earliness-Tardiness Scheduling Problem, II: Deviation of Completion Times About a Restrictive Common Due Date." Operations Research 39(5), 847-856.
-
(1991)
Operations Research
, vol.39
, Issue.5
, pp. 847-856
-
-
Hall, N.G.1
Kubiak, W.2
Sethi, S.P.3
-
10
-
-
3943054030
-
Minimizing Earliness and Tardiness Penalties in a Single-Machine Problem with a Common Due Date
-
Hino, C.M., D.P. Ronconi, and A.B. Mendes. (2005). "Minimizing Earliness and Tardiness Penalties in a Single-Machine Problem with a Common Due Date." European Journal of Operational Research 160(1), 190-201.
-
(2005)
European Journal of Operational Research
, vol.160
, Issue.1
, pp. 190-201
-
-
Hino, C.M.1
Ronconi, D.P.2
Mendes, A.B.3
-
13
-
-
0027256856
-
Scheduling with Monotonous Earliness and Tardiness Penalties
-
Kahlbacher, H.G. (1993). "Scheduling with Monotonous Earliness and Tardiness Penalties." European Journal of Operational Research 64(2), 258-277.
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 258-277
-
-
Kahlbacher, H.G.1
-
14
-
-
26444479778
-
Optimization by Simulated Annealing
-
Kirkpatrick, S., C.D. Gelatt, Jr., and M.P. Vecchi. (1983). "Optimization by Simulated Annealing." Science 220, 671-680.
-
(1983)
Science
, vol.220
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt Jr., C.D.2
Vecchi, M.P.3
-
15
-
-
0000208572
-
Parallel Genetic Algorithms for the Earliness-Tardiness Job Scheduling Problem with General Penalty Weights
-
Lee, C.Y. and S.J. Kim. (1995). "Parallel Genetic Algorithms for the Earliness-Tardiness Job Scheduling Problem with General Penalty Weights." Computers and Industrial Engineering 28(2), 231-243.
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.2
, pp. 231-243
-
-
Lee, C.Y.1
Kim, S.J.2
-
16
-
-
0033165933
-
A Branch-and-Bound Algorithm for the Single Machine Earliness and Tardiness Scheduling Problem
-
Liaw, C.-F. (1999). "A Branch-and-Bound Algorithm for the Single Machine Earliness and Tardiness Scheduling Problem." Computers and Operations Research 26, 679-693.
-
(1999)
Computers and Operations Research
, vol.26
, pp. 679-693
-
-
Liaw, C.-F.1
-
18
-
-
5744249209
-
Equations of State Calculations by Fast Computing Machines
-
Metropolis, N., A.W. Rosenbluth, M.N. Rosenbluth, A.H. Teller, and E. Teller. (1953). "Equations of State Calculations by Fast Computing Machines." Journal of Chemical Physics 21, 1087-1092.
-
(1953)
Journal of Chemical Physics
, vol.21
, pp. 1087-1092
-
-
Metropolis, N.1
Rosenbluth, A.W.2
Rosenbluth, M.N.3
Teller, A.H.4
Teller, E.5
-
20
-
-
0027539428
-
A Hybrid Simulated Annealing Approach for Single Machine Scheduling Problems with Non-Regular Penalty Functions
-
Mittenthal, J., M. Raghavachari, and A.I. Rana. (1993). "A Hybrid Simulated Annealing Approach for Single Machine Scheduling Problems with Non-Regular Penalty Functions." Computers and Operations Research 20, 103-111.
-
(1993)
Computers and Operations Research
, vol.20
, pp. 103-111
-
-
Mittenthal, J.1
Raghavachari, M.2
Rana, A.I.3
-
21
-
-
0035371947
-
Single Machine Weighted Burliness-Tardiness Penalty Problem with a Common Due Date
-
Mondal, S.A. and A.K. Sen. (2001). "Single Machine Weighted Burliness-Tardiness Penalty Problem with a Common Due Date." Computers and Operations Research 28, 649-669.
-
(2001)
Computers and Operations Research
, vol.28
, pp. 649-669
-
-
Mondal, S.A.1
Sen, A.K.2
-
22
-
-
0001114258
-
Scheduling Problems with Non-Regular Penalty Functions: A Review
-
Raghavachari, M. (1988). "Scheduling Problems with Non-Regular Penalty Functions: A Review." Operations Research 25, 144-164.
-
(1988)
Operations Research
, vol.25
, pp. 144-164
-
-
Raghavachari, M.1
-
23
-
-
0002066821
-
Various Optimizers for Single-Stage Production
-
Smith, W. E. (1956). "Various Optimizers for Single-Stage Production." Naval Research Logistics Quarterly 3, 59-66.
-
(1956)
Naval Research Logistics Quarterly
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
-
24
-
-
0024755179
-
Single-Machine Scheduling to Minimize Absolute Deviation of Completion Times from a Common Due Date
-
Szwarc, W. (1989). "Single-Machine Scheduling to Minimize Absolute Deviation of Completion Times from a Common Due Date." Naval Research Logistics 36, 663-673.
-
(1989)
Naval Research Logistics
, vol.36
, pp. 663-673
-
-
Szwarc, W.1
|