메뉴 건너뛰기




Volumn 13, Issue 2, 2007, Pages 151-165

Meta-heuristic approaches for minimizing total earliness and tardiness penalties of single-machine scheduling with a common due date

Author keywords

Common due date; Earliness and tardiness penalties; Greedy local search; Meta heuristics; Scheduling

Indexed keywords

GENETIC ALGORITHMS; MACHINE DESIGN; METADATA; PROBLEM SOLVING; SIMULATED ANNEALING;

EID: 33847655581     PISSN: 13811231     EISSN: 15729397     Source Type: Journal    
DOI: 10.1007/s10732-006-9002-2     Document Type: Article
Times cited : (19)

References (24)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with Earliness and Tardiness Penalties: A Review
    • Baker, K.R. and G.D. Scudder. (1990). "Sequencing with Earliness and Tardiness Penalties: A Review." Operations Research 38(1), 22-36.
    • (1990) Operations Research , vol.38 , Issue.1 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 0035400523 scopus 로고    scopus 로고
    • Benchmarks for Scheduling on a Single Machine Against Restrictive and Unrestrictive Common Due Dates
    • Biskup, D. and M. Feldmann. (2001). "Benchmarks for Scheduling on a Single Machine Against Restrictive and Unrestrictive Common Due Dates."Computers and Operations Research 28(8), 787-801.
    • (2001) Computers and Operations Research , vol.28 , Issue.8 , pp. 787-801
    • Biskup, D.1    Feldmann, M.2
  • 5
    • 0037118177 scopus 로고    scopus 로고
    • A Survey of the State-of-Art of Common Due Date Assignment and Scheduling Research
    • Gordon, V., J.-M. Proth and C. Chu. (2002). "A Survey of the State-of-Art of Common Due Date Assignment and Scheduling Research." European Journal of Operational Research 139(1), 1-25.
    • (2002) European Journal of Operational Research , vol.139 , Issue.1 , pp. 1-25
    • Gordon, V.1    Proth, J.-M.2    Chu, C.3
  • 7
    • 0037290972 scopus 로고    scopus 로고
    • Single-Machine Scheduling for Minimizing Earliness and Tardiness Penalties by Meta-Heuristic Approaches
    • Feldmann, M. and D. Biskup. (2003). "Single-Machine Scheduling for Minimizing Earliness and Tardiness Penalties by Meta-Heuristic Approaches." Computers and Industrial Engineering 44(2), 307-323.
    • (2003) Computers and Industrial Engineering , vol.44 , Issue.2 , pp. 307-323
    • Feldmann, M.1    Biskup, D.2
  • 8
    • 0031102683 scopus 로고    scopus 로고
    • Using Tabu Search to Solve the Common Due Date Early/Tardy Machine Scheduling Problem
    • James, R.J.W. (1997). "Using Tabu Search to Solve the Common Due Date Early/Tardy Machine Scheduling Problem." Computers and Operations Research 24(3), 199-208.
    • (1997) Computers and Operations Research , vol.24 , Issue.3 , pp. 199-208
    • James, R.J.W.1
  • 9
    • 0026223827 scopus 로고
    • Earliness-Tardiness Scheduling Problem, II: Deviation of Completion Times About a Restrictive Common Due Date
    • Hall, N.G., W. Kubiak and S.P. Sethi. (1991). "Earliness-Tardiness Scheduling Problem, II: Deviation of Completion Times About a Restrictive Common Due Date." Operations Research 39(5), 847-856.
    • (1991) Operations Research , vol.39 , Issue.5 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.P.3
  • 10
    • 3943054030 scopus 로고    scopus 로고
    • Minimizing Earliness and Tardiness Penalties in a Single-Machine Problem with a Common Due Date
    • Hino, C.M., D.P. Ronconi, and A.B. Mendes. (2005). "Minimizing Earliness and Tardiness Penalties in a Single-Machine Problem with a Common Due Date." European Journal of Operational Research 160(1), 190-201.
    • (2005) European Journal of Operational Research , vol.160 , Issue.1 , pp. 190-201
    • Hino, C.M.1    Ronconi, D.P.2    Mendes, A.B.3
  • 13
    • 0027256856 scopus 로고
    • Scheduling with Monotonous Earliness and Tardiness Penalties
    • Kahlbacher, H.G. (1993). "Scheduling with Monotonous Earliness and Tardiness Penalties." European Journal of Operational Research 64(2), 258-277.
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 258-277
    • Kahlbacher, H.G.1
  • 14
  • 15
    • 0000208572 scopus 로고
    • Parallel Genetic Algorithms for the Earliness-Tardiness Job Scheduling Problem with General Penalty Weights
    • Lee, C.Y. and S.J. Kim. (1995). "Parallel Genetic Algorithms for the Earliness-Tardiness Job Scheduling Problem with General Penalty Weights." Computers and Industrial Engineering 28(2), 231-243.
    • (1995) Computers and Industrial Engineering , vol.28 , Issue.2 , pp. 231-243
    • Lee, C.Y.1    Kim, S.J.2
  • 16
    • 0033165933 scopus 로고    scopus 로고
    • A Branch-and-Bound Algorithm for the Single Machine Earliness and Tardiness Scheduling Problem
    • Liaw, C.-F. (1999). "A Branch-and-Bound Algorithm for the Single Machine Earliness and Tardiness Scheduling Problem." Computers and Operations Research 26, 679-693.
    • (1999) Computers and Operations Research , vol.26 , pp. 679-693
    • Liaw, C.-F.1
  • 20
    • 0027539428 scopus 로고
    • A Hybrid Simulated Annealing Approach for Single Machine Scheduling Problems with Non-Regular Penalty Functions
    • Mittenthal, J., M. Raghavachari, and A.I. Rana. (1993). "A Hybrid Simulated Annealing Approach for Single Machine Scheduling Problems with Non-Regular Penalty Functions." Computers and Operations Research 20, 103-111.
    • (1993) Computers and Operations Research , vol.20 , pp. 103-111
    • Mittenthal, J.1    Raghavachari, M.2    Rana, A.I.3
  • 21
    • 0035371947 scopus 로고    scopus 로고
    • Single Machine Weighted Burliness-Tardiness Penalty Problem with a Common Due Date
    • Mondal, S.A. and A.K. Sen. (2001). "Single Machine Weighted Burliness-Tardiness Penalty Problem with a Common Due Date." Computers and Operations Research 28, 649-669.
    • (2001) Computers and Operations Research , vol.28 , pp. 649-669
    • Mondal, S.A.1    Sen, A.K.2
  • 22
    • 0001114258 scopus 로고
    • Scheduling Problems with Non-Regular Penalty Functions: A Review
    • Raghavachari, M. (1988). "Scheduling Problems with Non-Regular Penalty Functions: A Review." Operations Research 25, 144-164.
    • (1988) Operations Research , vol.25 , pp. 144-164
    • Raghavachari, M.1
  • 23
    • 0002066821 scopus 로고
    • Various Optimizers for Single-Stage Production
    • Smith, W. E. (1956). "Various Optimizers for Single-Stage Production." Naval Research Logistics Quarterly 3, 59-66.
    • (1956) Naval Research Logistics Quarterly , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 24
    • 0024755179 scopus 로고
    • Single-Machine Scheduling to Minimize Absolute Deviation of Completion Times from a Common Due Date
    • Szwarc, W. (1989). "Single-Machine Scheduling to Minimize Absolute Deviation of Completion Times from a Common Due Date." Naval Research Logistics 36, 663-673.
    • (1989) Naval Research Logistics , vol.36 , pp. 663-673
    • Szwarc, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.