메뉴 건너뛰기




Volumn 34, Issue 10, 2007, Pages 2865-2881

The economic lot scheduling problem: A pure genetic search approach

Author keywords

ELSP; Genetic algorithms; Heuristics; Lot sizing; Meta heuristics; Production and inventory systems; Production scheduling; Single machine scheduling

Indexed keywords

DYNAMIC PROGRAMMING; GENETIC ALGORITHMS; HEURISTIC METHODS; INVENTORY CONTROL; PROBLEM SOLVING;

EID: 33847643247     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2005.11.001     Document Type: Article
Times cited : (52)

References (37)
  • 1
    • 0001372404 scopus 로고
    • Programming of economic lot sizes
    • Manne A.S. Programming of economic lot sizes. Management Science 4 2 (1958) 115-135
    • (1958) Management Science , vol.4 , Issue.2 , pp. 115-135
    • Manne, A.S.1
  • 2
    • 0001753360 scopus 로고
    • A computational approach to the lot scheduling problem
    • Rogers J. A computational approach to the lot scheduling problem. Management Science 3 3 (1958) 264-291
    • (1958) Management Science , vol.3 , Issue.3 , pp. 264-291
    • Rogers, J.1
  • 3
    • 0000326705 scopus 로고
    • A dynamic programming approach to a lot scheduling problem
    • Bomberger E. A dynamic programming approach to a lot scheduling problem. Management Science 12 (1966) 778-784
    • (1966) Management Science , vol.12 , pp. 778-784
    • Bomberger, E.1
  • 4
    • 0017931081 scopus 로고
    • The economic lot size problem (ELSP). review and extensions
    • Elmaghraby S. The economic lot size problem (ELSP). review and extensions. Management Science 24 (1978) 587-598
    • (1978) Management Science , vol.24 , pp. 587-598
    • Elmaghraby, S.1
  • 5
    • 0020587837 scopus 로고
    • On the general feasibility test of scheduling lot sizes for several products on one machine
    • Hsu W. On the general feasibility test of scheduling lot sizes for several products on one machine. Management Science 29 (1983) 93-105
    • (1983) Management Science , vol.29 , pp. 93-105
    • Hsu, W.1
  • 6
    • 0000331249 scopus 로고
    • Scheduling economic lot size production runs
    • Davis S. Scheduling economic lot size production runs. Management Science 36 (1990) 985-998
    • (1990) Management Science , vol.36 , pp. 985-998
    • Davis, S.1
  • 9
    • 0016553281 scopus 로고
    • Scheduling a multi-product single machine system-a new approach
    • Goyal S.K. Scheduling a multi-product single machine system-a new approach. International Journal of Production Research 13 (1975) 487-493
    • (1975) International Journal of Production Research , vol.13 , pp. 487-493
    • Goyal, S.K.1
  • 10
    • 0023420909 scopus 로고
    • The ELSP. achieving feasibility using time-varying lot sizes
    • Dobson G. The ELSP. achieving feasibility using time-varying lot sizes. Operations Research 35 5 (1987) 764-771
    • (1987) Operations Research , vol.35 , Issue.5 , pp. 764-771
    • Dobson, G.1
  • 12
    • 0015669867 scopus 로고
    • An iterative procedure for the single machine multi-product lot scheduling problem
    • Doll C.L., and Whybark D.C. An iterative procedure for the single machine multi-product lot scheduling problem. Management Science 20 (1973) 50-55
    • (1973) Management Science , vol.20 , pp. 50-55
    • Doll, C.L.1    Whybark, D.C.2
  • 13
    • 0015639751 scopus 로고
    • Scheduling a multi-product, single-machine system
    • Goyal S.K. Scheduling a multi-product, single-machine system. Operational Research Quarterly 24 2 (1973) 261-266
    • (1973) Operational Research Quarterly , vol.24 , Issue.2 , pp. 261-266
    • Goyal, S.K.1
  • 14
    • 26744443714 scopus 로고
    • A note on scheduling a multi-product single machine system for an infinite planning period
    • Haessler R. A note on scheduling a multi-product single machine system for an infinite planning period. Management Science 17 (1971) B240-B241
    • (1971) Management Science , vol.17
    • Haessler, R.1
  • 15
    • 0000380895 scopus 로고
    • A note on the single-machine multi-product lot scheduling problem
    • Haessler R., and Hogue S. A note on the single-machine multi-product lot scheduling problem. Management Science 22 8 (1976) 909-912
    • (1976) Management Science , vol.22 , Issue.8 , pp. 909-912
    • Haessler, R.1    Hogue, S.2
  • 16
    • 0001428478 scopus 로고
    • Scheduling a multi-product single machine system for an infinite planning period
    • Madigan J.G. Scheduling a multi-product single machine system for an infinite planning period. Management Science 14 (1968) 713-719
    • (1968) Management Science , vol.14 , pp. 713-719
    • Madigan, J.G.1
  • 17
    • 0010839946 scopus 로고
    • A note on Bomberger's approach to lot size scheduling. heuristic proposed
    • Stankard M., and Gupta S. A note on Bomberger's approach to lot size scheduling. heuristic proposed. Management Science 15 (1969) 449-452
    • (1969) Management Science , vol.15 , pp. 449-452
    • Stankard, M.1    Gupta, S.2
  • 19
    • 33847670022 scopus 로고    scopus 로고
    • Chatfield D. Applying the traditional genetic algorithm-the economic lot scheduling problem. Masters paper, Department of Management Science and Information Systems, The Pennsylvania State University; 1993.
  • 20
    • 0031161584 scopus 로고    scopus 로고
    • An optimal algorithm for the basic period approach to the economic lot schedule problem
    • Grznar J., and Riggle C. An optimal algorithm for the basic period approach to the economic lot schedule problem. Omega 25 3 (1997) 355-364
    • (1997) Omega , vol.25 , Issue.3 , pp. 355-364
    • Grznar, J.1    Riggle, C.2
  • 22
    • 27944472791 scopus 로고
    • An extended basic period approach to the economic lot scheduling problem (ELSP)
    • Muramatsu R., and Dudley N.A. (Eds)
    • Elmaghraby S. An extended basic period approach to the economic lot scheduling problem (ELSP). In: Muramatsu R., and Dudley N.A. (Eds). Production and industrial systems (1977) 649-662
    • (1977) Production and industrial systems , pp. 649-662
    • Elmaghraby, S.1
  • 23
    • 0018058202 scopus 로고
    • The application of marginal analysis to the ELSP
    • Fujita S. The application of marginal analysis to the ELSP. AIIE Transactions 10 4 (1978) 354-361
    • (1978) AIIE Transactions , vol.10 , Issue.4 , pp. 354-361
    • Fujita, S.1
  • 24
    • 0023295433 scopus 로고
    • An extension of the extended basic period approach for economic lot scheduling problems
    • Axsäter S. An extension of the extended basic period approach for economic lot scheduling problems. Journal of Optimization Theory and Applications 52 2 (1987) 179-189
    • (1987) Journal of Optimization Theory and Applications , vol.52 , Issue.2 , pp. 179-189
    • Axsäter, S.1
  • 25
    • 84985748301 scopus 로고
    • Solving the ELSP using the method of prime subperiods
    • Phillipoom P., Rees L., and Taylor B. Solving the ELSP using the method of prime subperiods. Decision Sciences 20 (1989) 794-809
    • (1989) Decision Sciences , vol.20 , pp. 794-809
    • Phillipoom, P.1    Rees, L.2    Taylor, B.3
  • 26
    • 0018724120 scopus 로고
    • An improved extended basic period approach for solving the ELSP
    • Haessler R. An improved extended basic period approach for solving the ELSP. AIIE Transactions 11 4 (1979) 336-340
    • (1979) AIIE Transactions , vol.11 , Issue.4 , pp. 336-340
    • Haessler, R.1
  • 27
    • 33847659069 scopus 로고    scopus 로고
    • C. Tunasar, J. Rajgopal, An evolutionary computation approach to the economic lot scheduling problem. Technical Report No. TR 96-1, Department of Industrial Engineering, University of Pittsburgh; 1996.
  • 28
    • 0021581827 scopus 로고
    • A stepwise partial enumeration algorithm for the economic lot scheduling problem
    • Park K., and Yun D. A stepwise partial enumeration algorithm for the economic lot scheduling problem. IIE Transactions 16 4 (1984) 363-370
    • (1984) IIE Transactions , vol.16 , Issue.4 , pp. 363-370
    • Park, K.1    Yun, D.2
  • 29
    • 0017505335 scopus 로고
    • Lot sizing and sequencing for N products on one factility
    • Delporte C., and Thomas L. Lot sizing and sequencing for N products on one factility. Management Science 23 10 (1977) 1070-1079
    • (1977) Management Science , vol.23 , Issue.10 , pp. 1070-1079
    • Delporte, C.1    Thomas, L.2
  • 30
    • 0002144959 scopus 로고
    • Computing optimal lot sizes in the ELSP
    • Zipkin P. Computing optimal lot sizes in the ELSP. Operations Research 39 1 (1991) 56-63
    • (1991) Operations Research , vol.39 , Issue.1 , pp. 56-63
    • Zipkin, P.1
  • 31
    • 0001343645 scopus 로고
    • Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems
    • Roundy R. Rounding off to powers of two in continuous relaxations of capacitated lot sizing problems. Management Science 35 12 (1989) 1433-1442
    • (1989) Management Science , vol.35 , Issue.12 , pp. 1433-1442
    • Roundy, R.1
  • 32
    • 3142609617 scopus 로고
    • Addendum to Stankard and Gupta's note on lot size scheduling
    • Hodgson T. Addendum to Stankard and Gupta's note on lot size scheduling. Management Science 16 7 (1970) 514-517
    • (1970) Management Science , vol.16 , Issue.7 , pp. 514-517
    • Hodgson, T.1
  • 33
    • 0010839947 scopus 로고
    • Single machine multi-product batch scheduling. testing several solution methods
    • Arcade S.H. Single machine multi-product batch scheduling. testing several solution methods. Omega 21 6 (1993) 709-711
    • (1993) Omega , vol.21 , Issue.6 , pp. 709-711
    • Arcade, S.H.1
  • 35
    • 0002445824 scopus 로고
    • Genetic algorithms and simulated annealing. an overview
    • Davis L. (Ed), Morgan Kaufman Publishers, San Mateo
    • Davis L., and Steenstrup M. Genetic algorithms and simulated annealing. an overview. In: Davis L. (Ed). Genetic algorithms and simulated annealing (1987), Morgan Kaufman Publishers, San Mateo 1-11
    • (1987) Genetic algorithms and simulated annealing , pp. 1-11
    • Davis, L.1    Steenstrup, M.2
  • 37
    • 0024014722 scopus 로고
    • A more efficient formulation of the single machine, static demand, lot scheduling problem
    • Boctor F. A more efficient formulation of the single machine, static demand, lot scheduling problem. Engineering Costs and Production Economics 14 (1988) 3-10
    • (1988) Engineering Costs and Production Economics , vol.14 , pp. 3-10
    • Boctor, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.