-
1
-
-
0015056789
-
Large scale hydro-thermal unit commitment-method and results
-
May/June
-
H. H. Happ, R. C. Johnson, and W. J. Wright, "Large scale hydro-thermal unit commitment-method and results," IEEE Trans. Power Appa. Syst., vol. PAS-90, no. 3, pp. 1373-1384, May/June 1971.
-
(1971)
IEEE Trans. Power Appa. Syst
, vol.PAS-90
, Issue.3
, pp. 1373-1384
-
-
Happ, H.H.1
Johnson, R.C.2
Wright, W.J.3
-
2
-
-
2542578194
-
A study of economic shutdown of generating units in daily dispatch
-
C. J. Baldwin, K. M. Dale, and R. F. Dittrich, "A study of economic shutdown of generating units in daily dispatch," IEEE Trans. Power Appa. Syst., vol. PAS-78, pp. 1272-1284, 1960.
-
(1960)
IEEE Trans. Power Appa. Syst
, vol.PAS-78
, pp. 1272-1284
-
-
Baldwin, C.J.1
Dale, K.M.2
Dittrich, R.F.3
-
3
-
-
0038519486
-
A fast technique for unit commitment problem by extended priority list
-
May
-
T. Senjyu, K. Shimabukuro, K. Uezato, and T. Funabashi, "A fast technique for unit commitment problem by extended priority list," IEEE Trans. Power Syst., vol. 18, no. 2, pp. 882-888, May 2003.
-
(2003)
IEEE Trans. Power Syst
, vol.18
, Issue.2
, pp. 882-888
-
-
Senjyu, T.1
Shimabukuro, K.2
Uezato, K.3
Funabashi, T.4
-
4
-
-
0020707286
-
A branch-and-bound algorithm for unit commitment
-
Feb
-
A. I. Cohen and M. Yoshimura, "A branch-and-bound algorithm for unit commitment," IEEE Trans. Power Appa. Syst., vol. PAS-102, no. 2, pp. 444-451, Feb. 1983.
-
(1983)
IEEE Trans. Power Appa. Syst
, vol.PAS-102
, Issue.2
, pp. 444-451
-
-
Cohen, A.I.1
Yoshimura, M.2
-
5
-
-
0020003297
-
Solution of large-scale optimal unit commitment problems
-
Jan
-
G. S. Lauer, D. P. Bertsekas, N. R. Sandell,Jr, and T. A. Posbergh, "Solution of large-scale optimal unit commitment problems," IEEE Trans. Power Appa. Syst., vol. PAS-101, pp. 79-86, Jan. 1982.
-
(1982)
IEEE Trans. Power Appa. Syst
, vol.PAS-101
, pp. 79-86
-
-
Lauer, G.S.1
Bertsekas, D.P.2
Sandell Jr, N.R.3
Posbergh, T.A.4
-
6
-
-
0031076834
-
Short-term resource scheduling with ramp constraints [power generation scheduling]
-
Feb
-
A. J. Svoboda, C.-L. Tseng, C.-A. Li, and R. B. Johnson, "Short-term resource scheduling with ramp constraints [power generation scheduling]," IEEE Trans. Power Syst., vol. 12, no. 1, pp. 77-83, Feb. 1997.
-
(1997)
IEEE Trans. Power Syst
, vol.12
, Issue.1
, pp. 77-83
-
-
Svoboda, A.J.1
Tseng, C.-L.2
Li, C.-A.3
Johnson, R.B.4
-
7
-
-
0024717016
-
A fuel-constrained unit commitment method
-
Aug
-
F. N. Lee, "A fuel-constrained unit commitment method," IEEE Trans. Power Syst., vol. 4, no. 3, pp. 1208-1218, Aug. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.3
, pp. 1208-1218
-
-
Lee, F.N.1
-
8
-
-
0024765474
-
Implementation of a Lagrangian relaxation based unit commitment problem
-
Nov
-
S. Virmani, E. C. Adrian, K. Imhof, and S. Mukherjee, "Implementation of a Lagrangian relaxation based unit commitment problem," IEEE Trans. Power Syst., vol. 4, no. 4, pp. 1373-1380, Nov. 1989.
-
(1989)
IEEE Trans. Power Syst
, vol.4
, Issue.4
, pp. 1373-1380
-
-
Virmani, S.1
Adrian, E.C.2
Imhof, K.3
Mukherjee, S.4
-
9
-
-
0024001585
-
Towards a more rigorous and practical unit commitment by Lagrangian relaxation
-
May
-
F. Zhuang and F. D. Galiana, "Towards a more rigorous and practical unit commitment by Lagrangian relaxation," IEEE Trans. Power Syst., vol. 3, no. 2, pp. 763-773, May 1988.
-
(1988)
IEEE Trans. Power Syst
, vol.3
, Issue.2
, pp. 763-773
-
-
Zhuang, F.1
Galiana, F.D.2
-
10
-
-
2542640865
-
A solution to the unit-commitment problem using integer-coded genetic algorithm
-
May
-
I. G. Damousis, A. G. Bakirtzis, and P. S. Dokopoulos, "A solution to the unit-commitment problem using integer-coded genetic algorithm," IEEE Trans. Power Syst., vol. 19, no. 2, pp. 1165-1172, May 2004.
-
(2004)
IEEE Trans. Power Syst
, vol.19
, Issue.2
, pp. 1165-1172
-
-
Damousis, I.G.1
Bakirtzis, A.G.2
Dokopoulos, P.S.3
-
11
-
-
0034186815
-
Unit commitment by Lagrangian relaxation and genetic algorithms
-
May
-
C.-P. Cheng, C.-W. Liu, and C.-C. Liu, "Unit commitment by Lagrangian relaxation and genetic algorithms," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 707-714, May 2000.
-
(2000)
IEEE Trans. Power Syst
, vol.15
, Issue.2
, pp. 707-714
-
-
Cheng, C.-P.1
Liu, C.-W.2
Liu, C.-C.3
-
12
-
-
0030082567
-
A genetic algorithm solution to the unit commitment problem
-
Feb
-
S. A. Kazarlis, A. G. Bakirtzis, and V. Petridis, "A genetic algorithm solution to the unit commitment problem," IEEE Trans. Power Syst., vol. 11, no. 1, pp. 83-92, Feb. 1996.
-
(1996)
IEEE Trans. Power Syst
, vol.11
, Issue.1
, pp. 83-92
-
-
Kazarlis, S.A.1
Bakirtzis, A.G.2
Petridis, V.3
-
13
-
-
0038228201
-
Application of priority-list-embedded tabu search to unit commitment in power systems
-
H. Mori and O. Matsuzaki, "Application of priority-list-embedded tabu search to unit commitment in power systems," Inst. Elect. Eng. Japan, vol. 121-B, no. 4, pp. 535-541, 2001.
-
(2001)
Inst. Elect. Eng. Japan
, vol.121-B
, Issue.4
, pp. 535-541
-
-
Mori, H.1
Matsuzaki, O.2
-
14
-
-
0033222003
-
An evolutionary programming solution to the unit commitment problem
-
Nov
-
K. A. Juste, H. Kita, E. Tanaka, and J. Hasegawa, "An evolutionary programming solution to the unit commitment problem," IEEE Trans. Power Syst., vol. 14, no. 4, pp. 1452-1459, Nov. 1999.
-
(1999)
IEEE Trans. Power Syst
, vol.14
, Issue.4
, pp. 1452-1459
-
-
Juste, K.A.1
Kita, H.2
Tanaka, E.3
Hasegawa, J.4
-
15
-
-
0026153980
-
Maintenance scheduling by using simulated annealing method [for power plants]
-
May
-
T. Satoh and K. Nara, "Maintenance scheduling by using simulated annealing method [for power plants]," IEEE Trans. Power Syst., vol. 6, no. 2, pp. 850-857, May 1991.
-
(1991)
IEEE Trans. Power Syst
, vol.6
, Issue.2
, pp. 850-857
-
-
Satoh, T.1
Nara, K.2
-
16
-
-
0012202716
-
An enhanced simulated annealing approach to unit commitment
-
May
-
S. Y. W. Wong, "An enhanced simulated annealing approach to unit commitment", Electric Power Energy Syst., vol. 20, pp. 359-368, May 1998.
-
(1998)
Electric Power Energy Syst
, vol.20
, pp. 359-368
-
-
Wong, S.Y.W.1
-
17
-
-
0025385335
-
Unit commitment by simulated annealing
-
Feb
-
F. Zhuang and F. D. Galiana, "Unit commitment by simulated annealing," IEEE Trans. Power Syst., vol. 5, no. 1, pp. 311-318, Feb. 1990.
-
(1990)
IEEE Trans. Power Syst
, vol.5
, Issue.1
, pp. 311-318
-
-
Zhuang, F.1
Galiana, F.D.2
-
18
-
-
0031999302
-
A simulated annealing algorithm for unit commitment
-
Feb
-
A. H. Mantawy, Y. L. Abel-Mogid, and S. Z. Selim, "A simulated annealing algorithm for unit commitment," IEEE Trans. Power Syst., vol. 13, no. 1, pp. 197-204, Feb. 1998.
-
(1998)
IEEE Trans. Power Syst
, vol.13
, Issue.1
, pp. 197-204
-
-
Mantawy, A.H.1
Abel-Mogid, Y.L.2
Selim, S.Z.3
-
19
-
-
0032593076
-
Integrating genetic algorithms, tabu search, and simulated annealing for the unit commitment problem
-
Aug
-
A. H. Mantawy, Y. L. Abel-Mogid, and S. Z. Selim, "Integrating genetic algorithms, tabu search, and simulated annealing for the unit commitment problem," IEEE Trans. Power Syst., vol. 14, no. 3, pp. 829-836, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst
, vol.14
, Issue.3
, pp. 829-836
-
-
Mantawy, A.H.1
Abel-Mogid, Y.L.2
Selim, S.Z.3
-
20
-
-
0037291017
-
Simulated annealing with local search - A hybrid algorithm for unit commitment
-
Feb
-
G. K. Purushothama and L. Jenkins, "Simulated annealing with local search - A hybrid algorithm for unit commitment," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 273-278, Feb. 2003.
-
(2003)
IEEE Trans. Power Syst
, vol.18
, Issue.1
, pp. 273-278
-
-
Purushothama, G.K.1
Jenkins, L.2
|