-
2
-
-
85024183056
-
-
Proc of the 1992 Winter Simulation Conference, Arlington, VA, USA.
-
SHANNON, R. E., 1992. Introduction to simulation. Proc of the 1992 Winter Simulation Conference. 1992, Arlington, VA, USA. pp. 65–73.
-
(1992)
Introduction to simulation
, pp. 65-73
-
-
Shannon, R.E.1
-
3
-
-
0032104987
-
A framework for applying simulation in construction
-
ABOURIZK, S. M., and HAJJAR, D., 1998. A framework for applying simulation in construction. Canadian Journal of Civil Engineering, 5 (3):604–617.
-
(1998)
Canadian Journal of Civil Engineering
, vol.5
, Issue.3
, pp. 604-617
-
-
Abourizk, S.M.1
Hajjar, D.2
-
4
-
-
0030127938
-
Computerized tool for hierarchical simulation modeling
-
SAWHNEY, A., and ABOURIZK, S. M., 1996. Computerized tool for hierarchical simulation modeling. Journal of Computing in Civil Engineering, 10 (2):115–124.
-
(1996)
Journal of Computing in Civil Engineering
, vol.10
, Issue.2
, pp. 115-124
-
-
Sawhney, A.1
Abourizk, S.M.2
-
5
-
-
0032073195
-
Resource-based simulation libraries for construction
-
OLOUFA, A., IKEDA, M., and NGUYEN, T., 1998. Resource-based simulation libraries for construction. Automation in Construction, 7 (4):315–326.
-
(1998)
Automation in Construction
, vol.7
, Issue.4
, pp. 315-326
-
-
Oloufa, A.1
Ikeda, M.2
Nguyen, T.3
-
7
-
-
0003850656
-
-
New York, NY: John Wiley & Sons, Inc
-
PRITSKER, A. A. B., O'REILLYAND, J. J., and LAVAL, D. K., 1997. Simulation with Visual SLAM and AweSim., 811New York, NY:John Wiley & Sons, Inc.
-
(1997)
Simulation with Visual SLAM and AweSim.
, pp. 811
-
-
Pritsker, A.A.B.1
O'reillyand, J.J.2
Laval, D.K.3
-
8
-
-
0031356308
-
-
Proc of the 1997 Winter Simulation Conference, Atlanta, GA, USA.
-
CRAIN, R. C., 1997. Simulation using GPSS/H. Proc of the 1997 Winter Simulation Conference. 1997, Atlanta, GA, USA. pp. 567–573.
-
(1997)
Simulation using GPSS/H
, pp. 567-573
-
-
Crain, R.C.1
-
9
-
-
0003402124
-
-
New York, NY: John Wiley & Sons, Inc
-
HALPIN, D. W., and RIGGS, L. S., 1992. Planning and analysis of construction operations., 400New York, NY:John Wiley & Sons, Inc.
-
(1992)
Planning and analysis of construction operations.
, pp. 400
-
-
Halpin, D.W.1
Riggs, L.S.2
-
11
-
-
0242633355
-
An object - oriented model for earthmoving operations
-
MARZOUK, M., and MOSELHI, O., 2003. An object - oriented model for earthmoving operations. Journal of Construction Engineering and Management, 129 (2):173–181.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.2
, pp. 173-181
-
-
Marzouk, M.1
Moselhi, O.2
-
12
-
-
0343557614
-
-
New York, NY: John Wiley & Sons, Inc
-
PODOLNY, W., and MULLER, J. M., 1982. Construction and design of prestressed concrete segmental bridges., 561New York, NY:John Wiley & Sons, Inc.
-
(1982)
Construction and design of prestressed concrete segmental bridges.
, pp. 561
-
-
Podolny, W.1
Muller, J.M.2
-
13
-
-
33847381830
-
-
Berkeley: University of California, (http://nisee.berkeley.edu/leonhardt/html/incrementally_lau nched_bridges. html)
-
NISEE. 1997. Incrementally launched bridges, Berkeley:University of California. (available at http://nisee.berkeley.edu/leonhardt/html/incrementally_lau nched_bridges. html)
-
(1997)
Incrementally launched bridges
-
-
|