메뉴 건너뛰기




Volumn 2005, Issue , 2005, Pages 540-545

Computing contingency probabilities for electric transmission decision problems

Author keywords

Contingency; Data; Decision; Equipment failure; Maintenance; Operations; Planning; Probability; Reliability; Risk; Security

Indexed keywords

EQUIPMENT FAILURE; POWER ENGINEERING INDUSTRY;

EID: 33847363580     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ISAP.2005.1599321     Document Type: Conference Paper
Times cited : (11)

References (22)
  • 1
    • 0038205035 scopus 로고    scopus 로고
    • NERC Planning Standards
    • Section I System Adequacy and Security, Standard SI
    • "NERC Planning Standards," Section I System Adequacy and Security, Standard SI.
  • 5
    • 0016953778 scopus 로고    scopus 로고
    • H. Saddock (chair), M. Bhavaraju, R. Billinton, C. DeSieno, J. Endrenyi, G. Horgensen, A. Patton, D. Piede, R. Ringlee, and J. Stratton, Common Mode Forced Outages of Overhead Transmission Lines, Task Force on Common Mode Outages of Bulk Power Supply Facilities of the IEEE PES Application of Probability Methods Subcommittee, IEEE Transactions on Power Apparatus and Systems, PAS-95, No. 3, pp. 859-863, May/June 1976.
    • H. Saddock (chair), M. Bhavaraju, R. Billinton, C. DeSieno, J. Endrenyi, G. Horgensen, A. Patton, D. Piede, R. Ringlee, and J. Stratton, "Common Mode Forced Outages of Overhead Transmission Lines," Task Force on Common Mode Outages of Bulk Power Supply Facilities of the IEEE PES Application of Probability Methods Subcommittee, IEEE Transactions on Power Apparatus and Systems, Vol. PAS-95, No. 3, pp. 859-863, May/June 1976.
  • 6
    • 0019597743 scopus 로고    scopus 로고
    • Station originated multiple outages in the reliability analysis of a composite generation and transmission system
    • R. Billinton and T. Medicheria, "Station originated multiple outages in the reliability analysis of a composite generation and transmission system," IEEE Trans. Power Apparatus and Systems, vol. PAS-100, no. 8, pp 3870-3878.
    • IEEE Trans. Power Apparatus and Systems , vol.PAS-100 , Issue.8 , pp. 3870-3878
    • Billinton, R.1    Medicheria, T.2
  • 7
    • 0022717461 scopus 로고
    • Transmission Outage Performance Prediction: Unit or Component Approach
    • May
    • G. Landgren, A. Schneider, M. Bhavaraju, and N. Balu, "Transmission Outage Performance Prediction: Unit or Component Approach," IEEE Trans. on Power Systems, Vol PWRS-1, No. 2, May, 1986, pp. 54-61.
    • (1986) IEEE Trans. on Power Systems , vol.PWRS-1 , Issue.2 , pp. 54-61
    • Landgren, G.1    Schneider, A.2    Bhavaraju, M.3    Balu, N.4
  • 8
    • 0029405004 scopus 로고    scopus 로고
    • The APM Task Force on Generator Data Pooling (A.M. Breipohl, Chmn., P. Albrecht, R. Allan, S. Asgarpoor, M. Bhavaraju, R. Billinton, M. Curley, C. Heising, M. Mazumdar, M. MoCoy, R. Niebo, A.D. Patton, N. Rau, R. Ringlee, A. Schneider, C. Singh, L. Wang, M. Warren, P. Wong), Pooling Generating Unit Data for Improved Estimates of Performance Indices, IEEE Transactions on Power Systems, 10, No. 4, November 1995.
    • The APM Task Force on Generator Data Pooling (A.M. Breipohl, Chmn., P. Albrecht, R. Allan, S. Asgarpoor, M. Bhavaraju, R. Billinton, M. Curley, C. Heising, M. Mazumdar, M. MoCoy, R. Niebo, A.D. Patton, N. Rau, R. Ringlee, A. Schneider, C. Singh, L. Wang, M. Warren, P. Wong), "Pooling Generating Unit Data for Improved Estimates of Performance Indices," IEEE Transactions on Power Systems, Vol. 10, No. 4, November 1995.
  • 10
    • 0032071144 scopus 로고    scopus 로고
    • Probabilistic Evaluation of the Effect of Maintenance on Reliability- An Application
    • May
    • J. Endrenyi, G. Anders, A. Leite da Silva, "Probabilistic Evaluation of the Effect of Maintenance on Reliability- An Application", IEEE Trans on Power System, Vol 13 Issue 2, May 1998, pp 576-583.
    • (1998) IEEE Trans on Power System , vol.13 , Issue.2 , pp. 576-583
    • Endrenyi, J.1    Anders, G.2    Leite da Silva, A.3
  • 11
    • 33847344054 scopus 로고    scopus 로고
    • Integrated Monitoring and Diagnostics, EPRI
    • Palo Alto, CA, TE-1000511
    • Electric Power Research Institute (EPRI) Final Report, Integrated Monitoring and Diagnostics, EPRI, Palo Alto, CA, 2000, TE-1000511.
    • (2000) Electric Power Research Institute (EPRI) Final Report
  • 13
    • 33847377766 scopus 로고    scopus 로고
    • Introduction to Hidden Markov Model
    • "Introduction to Hidden Markov Model," www.cedar.buffalo.edu/ ~govind/CS661/Lec12.ppt.
  • 14
    • 0024610919 scopus 로고
    • A Tutorial on Hidden Markov Models and Selected Applications in Speech Recognition
    • Feb
    • L. Rabiner, "A Tutorial on Hidden Markov Models and Selected Applications in Speech Recognition," Proc. of the IEEE, Vol. 7, Issue 2, Feb. 1989, pp 257-286.
    • (1989) Proc. of the IEEE , vol.7 , Issue.2 , pp. 257-286
    • Rabiner, L.1
  • 15
    • 0022594196 scopus 로고
    • An Introduction to Hidden Markov Models
    • January
    • L. Rabiner and B. H. Juang, "An Introduction to Hidden Markov Models," IEEE ASSP Magazine, pp. 4-15, January 1986.
    • (1986) IEEE ASSP Magazine , pp. 4-15
    • Rabiner, L.1    Juang, B.H.2
  • 18
    • 0000342467 scopus 로고
    • Statistical Inference for Probabilistic Functions of Finite State Markov Chains
    • L. Baum and T. Petrie. Statistical Inference for Probabilistic Functions of Finite State Markov Chains. Annals of Mathematical Statistics, 37, pp1554-1563, 1966.
    • (1966) Annals of Mathematical Statistics , vol.37 , pp. 1554-1563
    • Baum, L.1    Petrie, T.2
  • 19
    • 33747596755 scopus 로고    scopus 로고
    • Condition-Based Failure Rate Estimation and Optimal Maintenance Scheduling for Electrical Transmission System,
    • Ph.D. Dissertation, Iowa State University, December
    • Y. Jiang, "Condition-Based Failure Rate Estimation and Optimal Maintenance Scheduling for Electrical Transmission System," Ph.D. Dissertation, Iowa State University, December, 2005.
    • (2005)
    • Jiang, Y.1
  • 20
    • 51849097143 scopus 로고    scopus 로고
    • Automated Integration of Condition Monitoring with an Optimized Maintenance Scheduler for Circuit Breakers and Power Transformers
    • Final Report, Power Systems Engineering Research Center PSERC, December
    • J. McCalley, V. Honavar, M. Kezunovic, C. Singh, "Automated Integration of Condition Monitoring with an Optimized Maintenance Scheduler for Circuit Breakers and Power Transformers," Final Report, Power Systems Engineering Research Center (PSERC), December, 2005.
    • (2005)
    • McCalley, J.1    Honavar, V.2    Kezunovic, M.3    Singh, C.4
  • 22
    • 18944382536 scopus 로고    scopus 로고
    • Identifying High-Risk N-k Contingencies for On-Line Security Assessment
    • May
    • Q. Chen and J. McCalley, "Identifying High-Risk N-k Contingencies for On-Line Security Assessment," IEEE Trans. on Pwr. Sys., Vol. 20, No. 2, May, 2005.
    • (2005) IEEE Trans. on Pwr. Sys , vol.20 , Issue.2
    • Chen, Q.1    McCalley, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.