Volumn 10, Issue 2, 2007, Pages 87-95

A note on the two machine job shop with the weighted late work criterion

Author keywords

Dynamic programming; Job shop scheduling problem; Late work criterion; Scheduling

Indexed keywords

JOB SHOP SCHEDULING PROBLEMS; LATE WORK CRITERION; PSEUDOPOLYNOMIAL TIME METHOD; WORK PERFORMANCE;

EID: 33847252582     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-006-0005-5     Document Type: Article
Times cited : (31)

References (15)
  • 1
    • 4243272962 scopus 로고
    • Scheduling preemptible tasks on parallel processors with information loss
    • Blazewicz, J., "Scheduling preemptible tasks on parallel processors with information loss," Recherche Technique et Science Informatiques, 3(6), 415-420 (1984).
    • (1984) Recherche Technique et Science Informatiques , vol.3 , Issue.6 , pp. 415-420
    • Blazewicz, J.1
  • 3
    • 0023642114 scopus 로고
    • Minimizing mean weighted execution time loss on identical and uniform processors
    • Blazewicz, J. and G. Finke, "Minimizing mean weighted execution time loss on identical and uniform processors," Information Processing Letters, 24, 259-263 (1987).
    • (1987) Information Processing Letters , vol.24 , pp. 259-263
    • Blazewicz, J.1    Finke, G.2
  • 5
    • 13444291276 scopus 로고    scopus 로고
    • The two-machine flow-shop problem with weighted late work criterion and common due date
    • Blazewicz, J., E. Pesch, M. Sterna, and F. Werner, "The two-machine flow-shop problem with weighted late work criterion and common due date," European Journal of Operational Research, 165(2), 408-415 (2005).
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 408-415
    • Blazewicz, J.1    Pesch, E.2    Sterna, M.3    Werner, F.4
  • 6
    • 84891459569 scopus 로고    scopus 로고
    • 2nd edn. Springer, Berlin, Heidelberg, New York
    • Brucker, P., Scheduling Algorithms. 2nd edn. Springer, Berlin, Heidelberg, New York, 1998.
    • (1998) Scheduling Algorithms
    • Brucker, P.1
  • 8
    • 0040362439 scopus 로고
    • An extension of Johnson's results on job shop scheduling
    • Jackson, J. R., "An extension of Johnson's results on job shop scheduling," Naval Research Logistics Quarterly, 3, 201-203 (1956).
    • (1956) Naval Research Logistics Quarterly , vol.3 , pp. 201-203
    • Jackson, J.R.1
  • 9
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with setup times included
    • Johnson, S. M., "Optimal two- and three-stage production schedules with setup times included," Naval Research Logistics Quarterly, 1, 61-68 (1954).
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 10
    • 0028734078 scopus 로고
    • Scheduling shops to minimize the weighted number of late jobs
    • Jozefowska, J., B. Jurisch, and W. Kubiak, "Scheduling shops to minimize the weighted number of late jobs," Operation Research Letters, 16(5), 277-283 (1994).
    • (1994) Operation Research Letters , vol.16 , Issue.5 , pp. 277-283
    • Jozefowska, J.1    Jurisch, B.2    Kubiak, W.3
  • 11
    • 57749173343 scopus 로고    scopus 로고
    • Minim izing total weighted error for imprecise computation tasks and related problems
    • J. Y. T. Leung ed, CRC Press, Boca Raton, Chapter 34
    • Leung, J. Y. T., "Minim izing total weighted error for imprecise computation tasks and related problems," in: J. Y. T. Leung (ed.), Handbook of Scheduling: Algorithms, Models, and Performance Analysis. CRC Press, Boca Raton, 2004; Chapter 34:1-16.
    • (2004) Handbook of Scheduling: Algorithms, Models, and Performance Analysis , pp. 1-16
    • Leung, J.Y.T.1
  • 13
    • 0005686907 scopus 로고
    • Single machine scheduling to minimize total late work
    • Potts, C. N. and L. N. van Wassenhove, "Single machine scheduling to minimize total late work," Operations Research, 40(3), 586-595 (1991).
    • (1991) Operations Research , vol.40 , Issue.3 , pp. 586-595
    • Potts, C.N.1    van Wassenhove, L.N.2
  • 15
    • 71849101330 scopus 로고    scopus 로고
    • Publishing House of Poznan University of Technology, Poznan
    • Sterna, M., Late Work Scheduling in Shop Systems. Publishing House of Poznan University of Technology, Poznan (2006).
    • (2006) Late Work Scheduling in Shop Systems
    • Sterna, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.