-
1
-
-
0029356616
-
-
S.J.Wang,D.s.Kirschen,S.Mokhtari,G.D.Irisarri Short-Term Generation Scheduling with Transmission Constraints Using Augumented Lagrangian Relaxation, IEEE trans on Power systems, 10, no3,Aug 1995,p 1294-1301
-
S.J.Wang,D.s.Kirschen,S.Mokhtari,G.D.Irisarri "Short-Term Generation Scheduling with Transmission Constraints Using Augumented Lagrangian Relaxation," IEEE trans on Power systems, vol 10, no3,Aug 1995,p 1294-1301
-
-
-
-
2
-
-
0032073503
-
A Genetic Algorithm Modelling Framework and solution Technique for short term optimal Hydrothermal scheduling
-
May
-
S.O.Orero and M.R.Irving," A Genetic Algorithm Modelling Framework and solution Technique for short term optimal Hydrothermal scheduling", IEEE trans on Powersystems, vol 13, no2,May 1998,p 501
-
(1998)
IEEE trans on Powersystems
, vol.13
, Issue.NO2
, pp. 501
-
-
Orero, S.O.1
Irving, M.R.2
-
3
-
-
0030148470
-
Genetic Aided Scheduling of Hydraulically Coupled Plants in Hydrothermal Coordination
-
May
-
P.Haung Chen and H C Chang, "Genetic Aided Scheduling of Hydraulically Coupled Plants in Hydrothermal Coordination",IEEE Trans on Powersystems,vol 11,no2,May 1996,p975
-
(1996)
IEEE Trans on Powersystems
, vol.11
, Issue.NO2
, pp. 975
-
-
Haung Chen, P.1
Chang, H.C.2
-
4
-
-
0028338155
-
-
B.Fogel, An Introduction to Simulated Evolutionary Optimiozation,IEEE Trans on Neural Networks, vol5,no1,January 1995,p3
-
B.Fogel, "An Introduction to Simulated Evolutionary Optimiozation",IEEE Trans on Neural Networks, vol5,no1,January 1995,p3
-
-
-
-
7
-
-
0033359881
-
Short-Term Hydrothermal Scheduling Through Evolutionary Programming Technique
-
P.K.Hota, R.Chakrabarti and P.K.Chattopadhyay -1999. "Short-Term Hydrothermal Scheduling Through Evolutionary Programming Technique ", EPSR, vol.52, pp.189-196.
-
(1999)
EPSR
, vol.52
, pp. 189-196
-
-
Hota, P.K.1
Chakrabarti, R.2
Chattopadhyay, P.K.3
-
8
-
-
0032075195
-
Evolutionary Programming Based Algorithm For Environmentally Constrained Economic Dispatch
-
Ki Po Wong, Jason Yuryevich -1998" Evolutionary Programming Based Algorithm For Environmentally Constrained Economic Dispatch", IEEE Trans on power system, vol. 133, pp.301-306.
-
(1998)
IEEE Trans on power system
, vol.133
, pp. 301-306
-
-
Ki, P.1
-
9
-
-
0015650865
-
-
R.Luss and T H I Jaakola-1973, Optimization by Direct search and system reduction of size of the search region, Annual Meeting of American Institute of Chemical Engineers Journal, 19,no.4
-
R.Luss and T H I Jaakola-1973, "Optimization by Direct search and system reduction of size of the search region, Annual Meeting of American Institute of Chemical Engineers Journal, vol.19,no.4
-
-
-
-
10
-
-
0031191601
-
Evolutionary Programming Techniques for Constrained Optimization Problems
-
Jong-Hwan Kim, and Hyun Myung-1997 "Evolutionary Programming Techniques for Constrained Optimization Problems", IEEE Transactions On Evolutionary Computation, Vol. 1, No. 2
-
(1997)
IEEE Transactions On Evolutionary Computation
, vol.1
, Issue.2
-
-
Kim, J.1
Myung, H.2
-
11
-
-
33847158680
-
Then and Now, Robert Michel Lewies
-
no 2000-26 Direct search method:, Verginia Torozon May 2000
-
ICASE report no 2000-26 Direct search method: Then and Now, Robert Michel Lewies, Verginia Torozon May 2000.
-
ICASE report
-
-
-
12
-
-
0022807556
-
Optimal short term operation planning of a large hydrothermal power system based on a non linear network flow concept
-
Nov
-
Brannud, H.,Bubenko, J.A., Sjelvgren, D., "Optimal short term operation planning of a large hydrothermal power system based on a non linear network flow concept".,IEEE Trans. PWRS, Vol. 1, No.4, Nov. 1986,pp. 75-82.
-
(1986)
IEEE Trans. PWRS
, vol.1
, Issue.4
, pp. 75-82
-
-
Brannud, H.1
Bubenko, J.A.2
Sjelvgren, D.3
-
13
-
-
0020849470
-
Application of decomposition techniques to the mid and short term scheduling of hydrothermal systems
-
Nov
-
Pereira, M.V.F., Pinto, L.M.V.G., "Application of decomposition techniques to the mid and short term scheduling of hydrothermal systems.", IEEE Trans. PAS, Vol. 102, No. 11, Nov. 1983,pp.3611-3618.
-
(1983)
IEEE Trans. PAS
, vol.102
, Issue.11
, pp. 3611-3618
-
-
Pereira, M.V.F.1
Pinto, L.M.V.G.2
-
14
-
-
0028513178
-
Scheduling of hydroelectric generation units using artificial neural networks
-
Sep
-
Liang, R.H., Y.Y. Hsu., "Scheduling of hydroelectric generation units using artificial neural networks.", Proc. IEE, Pt. C, Vol. 141, No.5, Sep. 1994, pp.452-458.
-
(1994)
Proc. IEE, Pt. C
, vol.141
, Issue.5
, pp. 452-458
-
-
Liang, R.H.1
Hsu, Y.Y.2
-
15
-
-
0037291589
-
Fast Evolutionary Programming Techniques For Short-Term Hydrothermal Scheduling
-
Feb
-
Nidul Sinha, R. Chakrabarti "Fast Evolutionary Programming Techniques For Short-Term Hydrothermal Scheduling" IEEE Trans. PWRS, Vol. 18, No.1, Feb.2003,pp. 214-219.
-
(2003)
IEEE Trans. PWRS
, vol.18
, Issue.1
, pp. 214-219
-
-
Nidul Sinha, R.C.1
|