![]() |
Volumn 55, Issue 1-2, 2007, Pages 367-374
|
Spatial and temporal pollutant budget analyses toward the total maximum daily loads management for the Yeongsan watershed in Korea
|
Author keywords
Pollutant budget analysis; Spatial and temporal analysis; Total maximum daily loads (TMDL); Watershed management
|
Indexed keywords
BIOCHEMICAL OXYGEN DEMAND;
FLOW CONTROL;
RESERVOIRS (WATER);
WATER POLLUTION;
WATER QUALITY;
POLLUTANT BUDGET ANALYSIS;
TOTAL MAXIMUM DAILY LOADS (TMDL);
VOLUMETRIC FLOW RATE;
WATERSHED MANAGEMENT;
WATERSHEDS;
BIOCHEMICAL OXYGEN DEMAND;
FLOW CONTROL;
RESERVOIRS (WATER);
WATER POLLUTION;
WATER QUALITY;
WATERSHEDS;
FLOW CONTROL;
POLLUTANT SOURCE;
WATER MANAGEMENT;
WATER QUALITY;
WATERSHED;
ARTICLE;
BIOCHEMICAL OXYGEN DEMAND;
BUDGET;
CITY PLANNING;
CONCENTRATION (PARAMETERS);
CONTROLLED STUDY;
FLOW RATE;
KOREA;
RIVER;
SEDIMENT;
VOLUMETRY;
WASTE COMPONENT REMOVAL;
WATER CONTAMINATION;
WATER FLOW;
WATER POLLUTANT;
WATER POLLUTION;
WATER QUALITY;
WATER SUPPLY;
WATER TREATMENT;
WATERSHED MANAGEMENT;
ENVIRONMENTAL MONITORING;
KOREA;
WATER POLLUTANTS;
WATER POLLUTION;
WATER SUPPLY;
ASIA;
EURASIA;
FAR EAST;
KOREA;
KWANGJU [SOUTH KOREA];
SOUTH KOREA;
|
EID: 33846936305
PISSN: 02731223
EISSN: None
Source Type: Book Series
DOI: 10.2166/wst.2007.039 Document Type: Article |
Times cited : (26)
|
References (11)
|