메뉴 건너뛰기




Volumn 149, Issue 1, 2007, Pages 209-216

Integer programming in forestry

Author keywords

[No Author keywords available]

Indexed keywords


EID: 33846865350     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1007/s10479-006-0105-9     Document Type: Review
Times cited : (9)

References (27)
  • 1
    • 2342568997 scopus 로고    scopus 로고
    • Incorporating Average and Maximum area Restrictions in Harvest Scheduling Models
    • Murray, A.T., M. Goycoolea, and A. Weintraub. (2004). "Incorporating Average and Maximum area Restrictions in Harvest Scheduling Models." Canadian Journal of Forest Research, 34, 456-464.
    • (2004) Canadian Journal of Forest Research , vol.34 , pp. 456-464
    • Murray, A.T.1    Goycoolea, M.2    Weintraub, A.3
  • 2
    • 4344680315 scopus 로고    scopus 로고
    • A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation
    • Andalaft, N., P. Andalaft, M. Guignard, M. Adrian, W. Alexis, and W. Andr es. (2003). "A Problem of Forest Harvesting and Road Building Solved Through Model Strengthening and Lagrangean Relaxation." Operations Research, 51(4), 613-628.
    • (2003) Operations Research , vol.51 , Issue.4 , pp. 613-628
    • Andalaft, N.1    Andalaft, P.2    Guignard, M.3    Adrian, M.4    Alexis, W.5    Andr es, W.6
  • 3
    • 0026435460 scopus 로고
    • Habitat Dispersion in Forest Planning and the Stable Set Problem
    • Barahona, F., A. Weintaub, and R. Epstein. (1992). "Habitat Dispersion in Forest Planning and the Stable Set Problem." Operations Research, 40(1).
    • (1992) Operations Research , vol.40 , Issue.1
    • Barahona, F.1    Weintaub, A.2    Epstein, R.3
  • 4
    • 0034393574 scopus 로고    scopus 로고
    • Even-Aged Restrictions with Sub-Graph Adjacency
    • Barrett, T.M. and J.K. Gilless. (2000). "Even-Aged Restrictions with Sub-Graph Adjacency." Annals of Operations Research, 95, 159-175.
    • (2000) Annals of Operations Research , vol.95 , pp. 159-175
    • Barrett, T.M.1    Gilless, J.K.2
  • 5
    • 0036177955 scopus 로고    scopus 로고
    • Combining Tabu Search and Genetic Algorithm Heuristic Techniques to Solve Spatial Harvest Scheduling Problems
    • Boston, K. and P. Bettinger. (2002). "Combining Tabu Search and Genetic Algorithm Heuristic Techniques to Solve Spatial Harvest Scheduling Problems." Forest Science, 48, 35-58.
    • (2002) Forest Science , vol.48 , pp. 35-58
    • Boston, K.1    Bettinger, P.2
  • 6
    • 0034127090 scopus 로고    scopus 로고
    • A Three-Stage Heuristic for Harvest Scheduling with Access Road Network Development
    • Clark, M.M., Meller, and T.P. McDonald. (2000). "A Three-Stage Heuristic for Harvest Scheduling with Access Road Network Development." Forest Science, 46, 204-218.
    • (2000) Forest Science , vol.46 , pp. 204-218
    • Clark, M.M.1    Meller2    McDonald, T.P.3
  • 7
    • 0142095204 scopus 로고    scopus 로고
    • A 2 Opt. Tabu Search Procedure for the Multi-Period Forest Harvesting Problem with Adjacency, Green-up, Old Growth and Even Flow Constraints
    • Caro, F.,M. Constantino, I. Martins, and A.Weintraub. (2003). "A 2 Opt. Tabu Search Procedure for the Multi-Period Forest Harvesting Problem with Adjacency, Green-up, Old Growth and Even Flow Constraints." Forest Science, 49(5), 738-751.
    • (2003) Forest Science , vol.49 , Issue.5 , pp. 738-751
    • Caro, F.1    Constantino, M.2    Martins, I.3    Weintraub, A.4
  • 9
    • 0039444463 scopus 로고    scopus 로고
    • Use of OR Systems in the Chilean Forest Industries
    • Epstein, R., R. Morales, J. Serón, and A. Weintraub. (1999). "Use of OR Systems in the Chilean Forest Industries." Interfaces, 29, 7-29.
    • (1999) Interfaces , vol.29 , pp. 7-29
    • Epstein, R.1    Morales, R.2    Serón, J.3    Weintraub, A.4
  • 10
    • 84872984396 scopus 로고    scopus 로고
    • Epstein, R. and A. Weintraub. (2005). A Mixed Integer Programming Approach for Solving Machinery Location and Road Design in Forestry Planning, submitted to Operations Research.
    • Epstein, R. and A. Weintraub. (2005). A Mixed Integer Programming Approach for Solving Machinery Location and Road Design in Forestry Planning", submitted to Operations Research.
  • 12
    • 25144511439 scopus 로고    scopus 로고
    • Harvest Scheduling Subject to Maximum Area Restrictions Exploring Exact Approaches
    • To appear in
    • Goycoolea, M., A. Murray, F. Barahona, R. Epstein, and A. Weintraub. (2005). "Harvest Scheduling Subject to Maximum Area Restrictions Exploring Exact Approaches." To appear in Operations Research.
    • (2005) Operations Research
    • Goycoolea, M.1    Murray, A.2    Barahona, F.3    Epstein, R.4    Weintraub, A.5
  • 13
    • 0032212039 scopus 로고    scopus 로고
    • Using Dynamic Programming and Overlapping Sub Problems to Address Adjacency in Large Harvest Scheduling Problems
    • Hogason, H.M. and J.G. Borges. (1998). "Using Dynamic Programming and Overlapping Sub Problems to Address Adjacency in Large Harvest Scheduling Problems." Forest Science, 44, 526-538.
    • (1998) Forest Science , vol.44 , pp. 526-538
    • Hogason, H.M.1    Borges, J.G.2
  • 15
    • 0001285126 scopus 로고
    • Simultaneous Planning of Wildland Transportation Alternatives
    • New York, Elsevier Science Publishers, pp
    • Kirby, M.W., W. Hager, and P. Wong. (1986). "Simultaneous Planning of Wildland Transportation Alternatives." In TIMS Studies in the Management Sciences, Vol. 21, New York, Elsevier Science Publishers, pp. 371-387.
    • (1986) TIMS Studies in the Management Sciences , vol.21 , pp. 371-387
    • Kirby, M.W.1    Hager, W.2    Wong, P.3
  • 16
    • 0036847407 scopus 로고    scopus 로고
    • Harvest Scheduling with Area-Based Adjacency Constraints
    • McDill, M.E., S.A. Rabin, and J. Braze. (2002). "Harvest Scheduling with Area-Based Adjacency Constraints." Forest Science, 48, 631-642.
    • (2002) Forest Science , vol.48 , pp. 631-642
    • McDill, M.E.1    Rabin, S.A.2    Braze, J.3
  • 17
    • 0033083079 scopus 로고    scopus 로고
    • Spatial Restrictions in Harvest Scheduling
    • Murray, A.T. (1999). "Spatial Restrictions in Harvest Scheduling." Forest Science, 45, 1-8.
    • (1999) Forest Science , vol.45 , pp. 1-8
    • Murray, A.T.1
  • 18
    • 0029810962 scopus 로고    scopus 로고
    • Analyzing Cliques for Imposing Adjacency Restrictions in Forest Models
    • Murray, A.T. and R.L. Church. (1996). "Analyzing Cliques for Imposing Adjacency Restrictions in Forest Models." Forest Science, 42, 166-175.
    • (1996) Forest Science , vol.42 , pp. 166-175
    • Murray, A.T.1    Church, R.L.2
  • 19
    • 0036845146 scopus 로고    scopus 로고
    • Scale and Unit Specificaton Influences in Harvest Scheduling with Maximum Area Restrictions
    • Murray, A.T. and A. Weintraub. (2002). "Scale and Unit Specificaton Influences in Harvest Scheduling with Maximum Area Restrictions." Forest Science, 48, 779-789.
    • (2002) Forest Science , vol.48 , pp. 779-789
    • Murray, A.T.1    Weintraub, A.2
  • 20
    • 2342568997 scopus 로고    scopus 로고
    • Incorporating Average and Maximum Area Restrictions in Harvest Scheduling Models
    • Murray, A.T., M. Goycoolea, and A. Weintraub. (2004). "Incorporating Average and Maximum Area Restrictions in Harvest Scheduling Models." Canadian Journal of Forest Research, 34, 456-464.
    • (2004) Canadian Journal of Forest Research , vol.34 , pp. 456-464
    • Murray, A.T.1    Goycoolea, M.2    Weintraub, A.3
  • 22
    • 0034029986 scopus 로고    scopus 로고
    • A Model and Tabu Search Method to Optimize Sand Harvest and Road Construction Schedules
    • Richards, E.W. and E.A. Gunn. (2000). "A Model and Tabu Search Method to Optimize Sand Harvest and Road Construction Schedules." Forest Science, 46, 188-203.
    • (2000) Forest Science , vol.46 , pp. 188-203
    • Richards, E.W.1    Gunn, E.A.2
  • 25
    • 0016986036 scopus 로고
    • A Forest Management Planning Model Integrating Silvicultural and Transportation Activities
    • Weintraub, A. and D. Navon. (1976). "A Forest Management Planning Model Integrating Silvicultural and Transportation Activities." Management Sciences, 22(12), 1299-1309.
    • (1976) Management Sciences , vol.22 , Issue.12 , pp. 1299-1309
    • Weintraub, A.1    Navon, D.2
  • 26
    • 0028548953 scopus 로고
    • Heuristic System to Solve Mixed Integer Forest Planning Models
    • Weintraub, A., G. Jones, A. Magendzo, M. Meacham, and M. Kirby. (1994). "Heuristic System to Solve Mixed Integer Forest Planning Models." Operations Research, 42(6), 1010-1024.
    • (1994) Operations Research , vol.42 , Issue.6 , pp. 1010-1024
    • Weintraub, A.1    Jones, G.2    Magendzo, A.3    Meacham, M.4    Kirby, M.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.