A strategy for autogeneration of space shuttle ground processing simulation models for project makespan estimation

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SOFTWARE; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING; STRATEGIC PLANNING; SYNCHRONIZATION;

EID: 33846687178     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2005.1574384     Document Type: Conference Paper
Times cited : (4)

References (9)
  • 2
    • 0034161004 scopus 로고    scopus 로고
    • Priority rules in project scheduling: A case for random activity selection
    • Akpan, E. O. P. (2000). Priority rules in project scheduling: a case for random activity selection. Production Planning & Control, 11(2), 165.
    • (2000) Production Planning & Control , vol.11 , Issue.2 , pp. 165
    • Akpan, E.O.P.1
  • 3
    • 0036923701 scopus 로고    scopus 로고
    • Benjamin, P., Graul, M., and Erraguntla, M. (2002). Methods and tools for aerospace operations modeling and simulation: toolkit for enabling adaptive modeling and simulation (TEAMS). In the Proceedings of the 2002 Winter Simulation Conference, San Diego, California, 763-771.
    • Benjamin, P., Graul, M., and Erraguntla, M. (2002). Methods and tools for aerospace operations modeling and simulation: toolkit for enabling adaptive modeling and simulation (TEAMS). In the Proceedings of the 2002 Winter Simulation Conference, San Diego, California, 763-771.
  • 4
    • 33846659848 scopus 로고    scopus 로고
    • Boydstun et al. (2002). Methods and tools for aerospace operations modeling and simulation: new perspectives towards modeling depot MRO. In the Proceedings of the 2002 Winter Simulation, San Diego, California, 738-746.
    • Boydstun et al. (2002). Methods and tools for aerospace operations modeling and simulation: new perspectives towards modeling depot MRO. In the Proceedings of the 2002 Winter Simulation, San Diego, California, 738-746.
  • 5
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models, and methods
    • Brucker et al. (1999). Resource-constrained project scheduling: notation, classification, models, and methods. European Journal of Operational Research, 112(1), 3-41.
    • (1999) European Journal of Operational Research , vol.112 , Issue.1 , pp. 3-41
    • Brucker1
  • 6
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen, W. S., & Leus, R. (2001). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19(5), 559-577.
    • (2001) Journal of Operations Management , vol.19 , Issue.5 , pp. 559-577
    • Herroelen, W.S.1    Leus, R.2
  • 7
    • 18044403717 scopus 로고    scopus 로고
    • Linear preselective policies for stochastic project scheduling
    • Möhring, R. H., & Stork, F. (2000). Linear preselective policies for stochastic project scheduling. Mathematical Methods of Operations Research, 52(3), 501.
    • (2000) Mathematical Methods of Operations Research , vol.52 , Issue.3 , pp. 501
    • Möhring, R.H.1    Stork, F.2
  • 9
    • 0027700624 scopus 로고
    • Scheduling and rescheduling with iterative repair
    • Zweben et al. (1993). Scheduling and rescheduling with iterative repair. Systems, Man and Cybernetics, IEEE Transactions on, 23(6), 1588-1596.
    • (1993) Systems, Man and Cybernetics, IEEE Transactions on , vol.23 , Issue.6 , pp. 1588-1596
    • Zweben1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.