-
2
-
-
33846667376
-
Unit-oriented tendering and calculation of buildings using data generated by the method of Integrated Product Lifecycle management (PLM/PDM) of buildings
-
Shanghai, Available via, accessed July 29, 2005
-
Bargstädt, H.-J., Blickling, A. 2003. Unit-oriented tendering and calculation of buildings using data generated by the method of Integrated Product Lifecycle management (PLM/PDM) of buildings. IABSE-Symposium Metropolitan Habitats and Infrastructure, Shanghai 2004. Available via http://www.uni-weimar.de/Bauing/baubet/personen/blickling_engl.html [accessed July 29, 2005].
-
(2003)
IABSE-Symposium Metropolitan Habitats and Infrastructure
-
-
Bargstädt, H.-J.1
Blickling, A.2
-
3
-
-
33846661526
-
Effective cost estimate and construction processes with 3D interactive technologies: Towards a virtual world of construction sites
-
Weimar, June 2-4, Available via, accessed July 29, 2005
-
Bargstädt, H.-J., Blickling, A. 2004. Effective cost estimate and construction processes with 3D interactive technologies: Towards a virtual world of construction sites. Xth International Conference on Computing in Civil and Building Engineering ICCCBE, Weimar, June 2-4, 2004. Available via http://www.uni-weimar.de/Bauing/baubet/personen/blickling_engl.html [accessed July 29, 2005].
-
(2004)
Xth International Conference on Computing in Civil and Building Engineering ICCCBE
-
-
Bargstädt, H.-J.1
Blickling, A.2
-
4
-
-
33846653666
-
Implementation of logic for earthmoving processes with a game development engine
-
Dresden 19-21 July, see http://cib.bau.tudresden.de/w78/ [accessed July 28, 2005a
-
Bargstädt, H.-J., Blickling, A. 2005a. Implementation of logic for earthmoving processes with a game development engine. In Proceedings of Information Technology in Construction, 22nd CIB-W7,8 Dresden 19-21 July 2005, see http://cib.bau.tudresden.de/w78/ [accessed July 28, 2005].
-
(2005)
Proceedings of Information Technology in Construction, 22nd CIB-W7,8
-
-
Bargstädt, H.-J.1
Blickling, A.2
-
5
-
-
33846651766
-
-
Bargstädt, H.-J., Blickling, A. 2005b. A game prototype for determination of construction process parameters with a partly automated simulation approach. Paper submitted at CONVR 2005 in Durham (UK), to be held from 12-13 September 2005, see http://www.adetti.pt/events/CONVR2005 [accessed July 29, 2005].
-
Bargstädt, H.-J., Blickling, A. 2005b. A game prototype for determination of construction process parameters with a partly automated simulation approach. Paper submitted at CONVR 2005 in Durham (UK), to be held from 12-13 September 2005, see http://www.adetti.pt/events/CONVR2005 [accessed July 29, 2005].
-
-
-
-
6
-
-
33846674329
-
-
Bargstädt, H.-J., Blickling, A. 2005c. Simulation of construction processes with game development software. Poster accepted at International Scientific Colloquium, 50th IWK 2005, Ilmenau (Germany), Faculty of Mechanical Engineering, to be held from 19-23 September 2005, see http://www.iwk.tuilmenau.de [accessed June 13, 2005].
-
Bargstädt, H.-J., Blickling, A. 2005c. Simulation of construction processes with game development software. Poster accepted at International Scientific Colloquium, 50th IWK 2005, Ilmenau (Germany), Faculty of Mechanical Engineering, to be held from 19-23 September 2005, see http://www.iwk.tuilmenau.de [accessed June 13, 2005].
-
-
-
-
7
-
-
1442311981
-
Using 4D CAD in the design and management of vertical extensions to existing buildings
-
ed, Erik, 266-277. Oxford: Blackwell Science
-
Bergsten, S. 2003. Using 4D CAD in the design and management of vertical extensions to existing buildings. In: Construction Process Improvement, ed. Atkin, Brian; Borgbrant, Jan; Josephson, Per-Erik), 266-277. Oxford: Blackwell Science.
-
(2003)
Construction Process Improvement
-
-
Bergsten, S.1
-
8
-
-
0033703954
-
Ladars for construction assessment and update
-
Cheok, G.S., Stone, W.C., Lipman, R.R., Witzgall, C. 2000. Ladars for construction assessment and update. Automation in Construction, 9: 463-473.
-
(2000)
Automation in Construction
, vol.9
, pp. 463-473
-
-
Cheok, G.S.1
Stone, W.C.2
Lipman, R.R.3
Witzgall, C.4
-
10
-
-
0037332742
-
Development of an integrated information resource base for 4D/VR construction processes simulation
-
Dawood, N., Sriprasert, E., Mallasi, Z., Hobbs, B. 2002. Development of an integrated information resource base for 4D/VR construction processes simulation. In Automation in Construction. 12: 123-131.
-
(2002)
Automation in Construction
, vol.12
, pp. 123-131
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
Hobbs, B.4
-
12
-
-
33846706904
-
Computer Simulation in Civil Engineering - State of the Art, Innovative Application Fields
-
Fraunhofer Institute for Production Systems and Design Technology IPK, Berlin
-
Franz, V., Chahrour, R. 2004. Computer Simulation in Civil Engineering - State of the Art, Innovative Application Fields. In Proceedings of 11. ASIM Dedicated Conference - Simulation in Production and Logistics. 329-339. Fraunhofer Institute for Production Systems and Design Technology (IPK). Berlin.
-
(2004)
Proceedings of 11. ASIM Dedicated Conference - Simulation in Production and Logistics
, pp. 329-339
-
-
Franz, V.1
Chahrour, R.2
-
13
-
-
33846651116
-
-
Freundt, M. 2005. Ein flexibles Modell für die Bauablaufplanung auf Basis von Graphentheorie und Fuzzy-Zahlen. Aachen: Shaker. Doctoral dissertation, Bauhaus-University Weimar, 2004.
-
Freundt, M. 2005. Ein flexibles Modell für die Bauablaufplanung auf Basis von Graphentheorie und Fuzzy-Zahlen. Aachen: Shaker. Doctoral dissertation, Bauhaus-University Weimar, 2004.
-
-
-
-
15
-
-
0016932216
-
CONSTRUCTO - An interactive gaming environment
-
Halpin, D. W. 1976. CONSTRUCTO - An interactive gaming environment. Journal of the Construction Division, ASCE. 102(C01): 145-156.
-
(1976)
Journal of the Construction Division, ASCE
, vol.102
, Issue.C01
, pp. 145-156
-
-
Halpin, D.W.1
-
16
-
-
33846705981
-
Subjective and interactive duration estimation: Discussion
-
Halpin, D. W. 1993. Subjective and interactive duration estimation: Discussion. Canadian Journal of Civil Engineering. 20(4): 719-721.
-
(1993)
Canadian Journal of Civil Engineering
, vol.20
, Issue.4
, pp. 719-721
-
-
Halpin, D.W.1
-
17
-
-
0041825829
-
Virtual experiment of innovative construction operations
-
Li, H., Ma, Z., Shen, Q., Kong, S. 2003. Virtual experiment of innovative construction operations. Automation in Construction, 12(5): 561-575.
-
(2003)
Automation in Construction
, vol.12
, Issue.5
, pp. 561-575
-
-
Li, H.1
Ma, Z.2
Shen, Q.3
Kong, S.4
-
18
-
-
0032275845
-
Earthmover - Simulation tool for earthwork planning
-
Society for Computer Simulation. Washington, D.C
-
Martinez, J.C. 1998. Earthmover - Simulation tool for earthwork planning. In Proceedings of the 1998 Winter Simulation Conference. Society for Computer Simulation. Washington, D.C.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
-
-
Martinez, J.C.1
-
19
-
-
17744373520
-
Implementing a general purpose framework using multiagents for construction management education
-
Mukherjee, A., Rojas, E.M., Winn, W.D. 2004. Implementing a general purpose framework using multiagents for construction management education. In Proceedings of the 2004 Winter Simulation Conference, 1244-1251.
-
(2004)
Proceedings of the 2004 Winter Simulation Conference
, pp. 1244-1251
-
-
Mukherjee, A.1
Rojas, E.M.2
Winn, W.D.3
-
20
-
-
0032593162
-
VR-based planning of construction site activities
-
Retik, A., Shapira, A. 1999. VR-based planning of construction site activities. Automation in Construction. 8: 671-680.
-
(1999)
Automation in Construction
, vol.8
, pp. 671-680
-
-
Retik, A.1
Shapira, A.2
-
21
-
-
85001720421
-
Analysis of earth-moving systems using discrete-event simulation. Discussion
-
Schexnayder C.J. 1997. Analysis of earth-moving systems using discrete-event simulation. Discussion. Journal of Construction Engineering and Management. 121: 199.
-
(1997)
Journal of Construction Engineering and Management
, vol.121
, pp. 199
-
-
Schexnayder, C.J.1
|