메뉴 건너뛰기




Volumn 46, Issue 4, 2007, Pages 271-281

Optimal scheduling of mixed batch and continuous processes incorporating utility aspects

Author keywords

Continuous time formulation; Instantaneous utility consumption production; Mixed batch and continuous processes; Scheduling optimization; Utility management

Indexed keywords

INTEGER PROGRAMMING; MATHEMATICAL MODELS; OPTIMIZATION; SCHEDULING;

EID: 33846422438     PISSN: 02552701     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cep.2006.06.007     Document Type: Article
Times cited : (17)

References (27)
  • 2
    • 0028532901 scopus 로고
    • Method to incorporate energy integration considerations in multiproduct batch processes
    • Corominas J., Espuna A., and Puigjaner L. Method to incorporate energy integration considerations in multiproduct batch processes. Comput. Chem. Eng. 18 (1994) 1043-1055
    • (1994) Comput. Chem. Eng. , vol.18 , pp. 1043-1055
    • Corominas, J.1    Espuna, A.2    Puigjaner, L.3
  • 3
    • 0042845546 scopus 로고    scopus 로고
    • Advanced concepts for energy integration in time-dependent processes
    • Stockholm, Sweden pp. 353-359
    • Font E., Espuna A., and Puigjaner L. Advanced concepts for energy integration in time-dependent processes. ECOS_96 (1996), Stockholm, Sweden pp. 353-359
    • (1996) ECOS_96
    • Font, E.1    Espuna, A.2    Puigjaner, L.3
  • 4
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. Part 1. MILP formulation
    • Kondili E., Pantelides C.C., and Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. Part 1. MILP formulation. Comput. Chem. Eng. 17 (1993) 211-227
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 6
    • 0029231167 scopus 로고
    • Optimal short-term scheduling of maintenance and production for multipurpose plants
    • Dedopoulos I.T., and Shah N. Optimal short-term scheduling of maintenance and production for multipurpose plants. Indus. Eng. Chem. Res. 34 (1995) 192-201
    • (1995) Indus. Eng. Chem. Res. , vol.34 , pp. 192-201
    • Dedopoulos, I.T.1    Shah, N.2
  • 7
    • 0031146289 scopus 로고    scopus 로고
    • Using detailed scheduling to obtain realistic operating policies for a batch processing facility
    • Bassett M.H., Pekny J.F., and Reklaitis G.V. Using detailed scheduling to obtain realistic operating policies for a batch processing facility. Ind. Eng. Chem. Res. 36 (1997) 1717-1726
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 1717-1726
    • Bassett, M.H.1    Pekny, J.F.2    Reklaitis, G.V.3
  • 8
    • 0033168424 scopus 로고    scopus 로고
    • An optimal control approach for scheduling mixed batch/continuous process plants with variable cycle time
    • Nott H.P., and Lee P. An optimal control approach for scheduling mixed batch/continuous process plants with variable cycle time. Comput. Chem. Eng. 23 (1999) 907-917
    • (1999) Comput. Chem. Eng. , vol.23 , pp. 907-917
    • Nott, H.P.1    Lee, P.2
  • 9
    • 2442583184 scopus 로고    scopus 로고
    • An Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Lin X., and Floudas C.A. An Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput. Chem. Eng. 28 (2004) 2109-2129
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109-2129
    • Lin, X.1    Floudas, C.A.2
  • 10
    • 0030174820 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities. Part A. General formulation and some solution approaches for the solution
    • Zhang X., and Sargent R.W.H. The optimal operation of mixed production facilities. Part A. General formulation and some solution approaches for the solution. Comput. Chem. Eng. 20 (1996) 897-904
    • (1996) Comput. Chem. Eng. , vol.20 , pp. 897-904
    • Zhang, X.1    Sargent, R.W.H.2
  • 11
    • 0344528710 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities-extensions and improvements
    • Zhang X., and Sargent R.W.H. The optimal operation of mixed production facilities-extensions and improvements. Comput. Chem. Eng. 22 (1998) 1287-1295
    • (1998) Comput. Chem. Eng. , vol.22 , pp. 1287-1295
    • Zhang, X.1    Sargent, R.W.H.2
  • 12
    • 0031190611 scopus 로고    scopus 로고
    • Mathematical programming formulation for scheduling of batch operations based on non-uniform time discretization
    • Mockus L., and Reklaitis G.V. Mathematical programming formulation for scheduling of batch operations based on non-uniform time discretization. Comput. Chem. Eng. 21 (1997) 1147-1156
    • (1997) Comput. Chem. Eng. , vol.21 , pp. 1147-1156
    • Mockus, L.1    Reklaitis, G.V.2
  • 13
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., and Pantelides C.C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comput. Chem. Eng. 20 (1996) S1221-S1226
    • (1996) Comput. Chem. Eng. , vol.20
    • Schilling, G.1    Pantelides, C.C.2
  • 14
    • 0035795519 scopus 로고    scopus 로고
    • An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
    • Castro P., Barbosa-Póvoa A.P.F.D., and Matos H. An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Indust. Eng. Chem. Res. 40 (2001) 2059-2068
    • (2001) Indust. Eng. Chem. Res. , vol.40 , pp. 2059-2068
    • Castro, P.1    Barbosa-Póvoa, A.P.F.D.2    Matos, H.3
  • 15
    • 0343627890 scopus 로고    scopus 로고
    • Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities
    • Méndez C.A., and Cerdá J. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end-product facilities. Comput. Chem. Eng. 2A (2000) 369-376
    • (2000) Comput. Chem. Eng. , vol.2 A , pp. 369-376
    • Méndez, C.A.1    Cerdá, J.2
  • 16
    • 0026108226 scopus 로고
    • MINLP model for cyclic multiproduct scheduling on continuous parallel lines
    • Sahinidis N.V., and Grossmann I. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Comput. Chem. Eng. 15 (1991) 85-92
    • (1991) Comput. Chem. Eng. , vol.15 , pp. 85-92
    • Sahinidis, N.V.1    Grossmann, I.2
  • 17
    • 0031188902 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semi-continuous process part1: production planning
    • Karimi I., and Mc Donald C. Planning and scheduling of parallel semi-continuous process part1: production planning. Indust. Eng. Chem. Res. 36 (1997) 2691-2700
    • (1997) Indust. Eng. Chem. Res. , vol.36 , pp. 2691-2700
    • Karimi, I.1    Mc Donald, C.2
  • 18
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semi-continuous process part 2: short-term scheduling
    • Karimi I., and Mc Donald C. Planning and scheduling of parallel semi-continuous process part 2: short-term scheduling. Indust. Eng. Chem. Res. 36 (1997) 2701-2714
    • (1997) Indust. Eng. Chem. Res. , vol.36 , pp. 2701-2714
    • Karimi, I.1    Mc Donald, C.2
  • 19
    • 0032997426 scopus 로고    scopus 로고
    • Continuous-time representation approach to batch and continuous process scheduling: Part 1. MINLP formulation
    • Mockus L., and Reklaitis G.V. Continuous-time representation approach to batch and continuous process scheduling: Part 1. MINLP formulation. Indust. Eng. Chem. Res. 38 (1999) 197-203
    • (1999) Indust. Eng. Chem. Res. , vol.38 , pp. 197-203
    • Mockus, L.1    Reklaitis, G.V.2
  • 20
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. Part 1. Multipurpose batch processes
    • Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. Part 1. Multipurpose batch processes. Indust. Eng. Chem. Res. 37 (1998) 4341-4359
    • (1998) Indust. Eng. Chem. Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 21
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. Part 2. Continuous and semi-continuous processes
    • Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. Part 2. Continuous and semi-continuous processes. Indust. Eng. Chem. Res. 37 (1998) 4360-4374
    • (1998) Indust. Eng. Chem. Res. , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 22
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. Part 3. Multiple intermediate due dates
    • Ierapetritou M.G., Hene T.S., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. Part 3. Multiple intermediate due dates. Indust. Eng. Chem. Res. 38 (1999) 3446-3461
    • (1999) Indust. Eng. Chem. Res. , vol.38 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 23
    • 4143112202 scopus 로고    scopus 로고
    • Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation
    • Wu D., and Ierapetritou M. Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation. Comput. Chem. Eng. 28 (2004) 2271-2286
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2271-2286
    • Wu, D.1    Ierapetritou, M.2
  • 24
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak S.L., Lin X., and Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Indust. Eng. Chem. Res. 43 (2004) 2516-2533
    • (2004) Indust. Eng. Chem. Res. , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 25
    • 0034332903 scopus 로고    scopus 로고
    • A new approach for efficient rescheduling of multiproduct batch plants
    • Vin J.P., and Ierapetritou M.G. A new approach for efficient rescheduling of multiproduct batch plants. Ind. Eng. Chem. Res. 39 (2000) 4228-4238
    • (2000) Ind. Eng. Chem. Res. , vol.39 , pp. 4228-4238
    • Vin, J.P.1    Ierapetritou, M.G.2
  • 26
    • 0035340986 scopus 로고    scopus 로고
    • Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation
    • Lin X., and Floudas C.A. Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation. Comput. Chem. Eng. 25 (2001) 665-674
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 665-674
    • Lin, X.1    Floudas, C.A.2
  • 27
    • 3042696417 scopus 로고    scopus 로고
    • Short-term scheduling under uncertainty using MILP sensitivity analysis
    • Jia Z., and Ierapetritou M.G. Short-term scheduling under uncertainty using MILP sensitivity analysis. Indust. Eng. Chem. Res. 43 (2004) 3782-3791
    • (2004) Indust. Eng. Chem. Res. , vol.43 , pp. 3782-3791
    • Jia, Z.1    Ierapetritou, M.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.