Due date assignment, job order release and sequencing interaction in job shop scheduling
-
Ahmed I., and Fisher W.W. Due date assignment, job order release and sequencing interaction in job shop scheduling. Decision Sciences 23 (1992) 633-647
-
(1992)
Decision Sciences
, vol.23
, pp. 633-647
-
-
Ahmed, I.1
Fisher, W.W.2
-
2
-
-
0012245221
-
The effects of input control in a simple scheduling model
-
Baker K.R. The effects of input control in a simple scheduling model. Journal of Operations Management 4 (1984) 99-112
-
(1984)
Journal of Operations Management
, vol.4
, pp. 99-112
-
-
Baker, K.R.1
-
3
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
Baker K.R. Sequencing rules and due-date assignments in a job shop. Management Science 30 (1984) 1093-1104
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
7
-
-
0014807274
-
A heuristic algorithm for the n-job, m-machine sequencing problem
-
Campbell H.G., Dudek R.A., and Smith M.L. A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science 16 (1970) B630-B637
-
(1970)
Management Science
, vol.16
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, M.L.3
-
8
-
-
0032205531
-
Comparison of order review and release techniques in a dynamic and uncertain job shop environment
-
Cigolini R., Perona M., and Portioli A. Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research 36 (1998) 2931-2951
-
(1998)
International Journal of Production Research
, vol.36
, pp. 2931-2951
-
-
Cigolini, R.1
Perona, M.2
Portioli, A.3
-
9
-
-
0017516618
-
An evaluation of flow-shop sequencing heuristics
-
Dannenbring D.G. An evaluation of flow-shop sequencing heuristics. Management Science 23 (1977) 1174-1182
-
(1977)
Management Science
, vol.23
, pp. 1174-1182
-
-
Dannenbring, D.G.1
-
10
-
-
0037578177
-
Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop
-
Framinan J.M., Leisten R., and Rajendran C. Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop. International Journal of Production Research 41 (2003) 121-148
-
(2003)
International Journal of Production Research
, vol.41
, pp. 121-148
-
-
Framinan, J.M.1
Leisten, R.2
Rajendran, C.3
-
13
-
-
34249973653
-
A survey of priority rule-based scheduling
-
Haupt R. A survey of priority rule-based scheduling. OR Spektrum 11 (1989) 3-16
-
(1989)
OR Spektrum
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
16
-
-
0000327811
-
Alternative order release mechanisms: a comparison by simulation
-
Hendry L., and Wong S.K. Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research 32 (1994) 2827-2842
-
(1994)
International Journal of Production Research
, vol.32
, pp. 2827-2842
-
-
Hendry, L.1
Wong, S.K.2
-
17
-
-
0029264383
-
Flowshop sequencing with mean flowtime objective
-
Ho J.C. Flowshop sequencing with mean flowtime objective. European Journal of Operational Research 81 (1995) 571-578
-
(1995)
European Journal of Operational Research
, vol.81
, pp. 571-578
-
-
Ho, J.C.1
-
18
-
-
0000177367
-
Application of the branch-and-bound technique to some flowshop scheduling problems
-
Ignall E., and Schrage L. Application of the branch-and-bound technique to some flowshop scheduling problems. Operations Research 13 (1965) 400-412
-
(1965)
Operations Research
, vol.13
, pp. 400-412
-
-
Ignall, E.1
Schrage, L.2
-
21
-
-
0003075019
-
Optimal two- and three-stage production schedules
-
Johnson S.M. Optimal two- and three-stage production schedules. Naval Research Logistics 1 (1954) 61-68
-
(1954)
Naval Research Logistics
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
22
-
-
0012298197
-
Priority dispatching with operation due-dates in a job shop
-
Kanet J.J., and Hayya J.G. Priority dispatching with operation due-dates in a job shop. Journal of Operations Management 2 (1982) 167-176
-
(1982)
Journal of Operations Management
, vol.2
, pp. 167-176
-
-
Kanet, J.J.1
Hayya, J.G.2
-
23
-
-
0027240799
-
Heuristics for flowshop scheduling problems with mean tardiness
-
Kim Y.D. Heuristics for flowshop scheduling problems with mean tardiness. Journal of Operational Research Society 44 (1993) 19-29
-
(1993)
Journal of Operational Research Society
, vol.44
, pp. 19-29
-
-
Kim, Y.D.1
-
29
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
-
Nawaz M., Enscore Jr. E.E., and Ham I. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA 11 (1983) 91-95
-
(1983)
OMEGA
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
31
-
-
0026953379
-
Capacity based order review/release strategies to improve manufacturing performance
-
Philipoom P.R., and Fry T.D. Capacity based order review/release strategies to improve manufacturing performance. International Journal of Production Research 30 (1992) 2559-2572
-
(1992)
International Journal of Production Research
, vol.30
, pp. 2559-2572
-
-
Philipoom, P.R.1
Fry, T.D.2
-
32
-
-
0033101604
-
Order review/release in the absence of adherence to formal scheduling policies
-
Philipoom P.R., and Fry T.D. Order review/release in the absence of adherence to formal scheduling policies. Journal of Operations Management 17 (1999) 327-342
-
(1999)
Journal of Operations Management
, vol.17
, pp. 327-342
-
-
Philipoom, P.R.1
Fry, T.D.2
-
33
-
-
0032043112
-
Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell
-
Parthasarathy S., and Rajendran C. Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell. Computers and Industrial Engineering 34 (1998) 531-546
-
(1998)
Computers and Industrial Engineering
, vol.34
, pp. 531-546
-
-
Parthasarathy, S.1
Rajendran, C.2
-
35
-
-
0027912256
-
Optimising theory of constraints when multiple constrained resources exist
-
Plenert G. Optimising theory of constraints when multiple constrained resources exist. European Journal of Operational Research 70 (1993) 126-133
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 126-133
-
-
Plenert, G.1
-
36
-
-
84985757538
-
An evaluation of order release mechanisms in a job shop environment
-
Ragatz G.L., and Mabert V.A. An evaluation of order release mechanisms in a job shop environment. Decision Sciences 19 (1988) 167-189
-
(1988)
Decision Sciences
, vol.19
, pp. 167-189
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
37
-
-
0027542699
-
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
-
Rajendran C. Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics 29 (1993) 65-73
-
(1993)
International Journal of Production Economics
, vol.29
, pp. 65-73
-
-
Rajendran, C.1
-
38
-
-
0031275336
-
An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
-
Rajendran C., and Ziegler H. An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs. European Journal of Operational Research 103 (1997) 129-138
-
(1997)
European Journal of Operational Research
, vol.103
, pp. 129-138
-
-
Rajendran, C.1
Ziegler, H.2
-
39
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flowshops and jobshops
-
Rajendran C., and Holthaus O. A comparative study of dispatching rules in dynamic flowshops and jobshops. European Journal of Operational Research 116 (1999) 156-170
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
40
-
-
1642559633
-
Ant colony algorithms for permutation flowshop scheduling to minimize makespan/ total flowtime of jobs
-
Rajendran C., and Ziegler H. Ant colony algorithms for permutation flowshop scheduling to minimize makespan/ total flowtime of jobs. European Journal of Operational Research 155 (2004) 426-438
-
(2004)
European Journal of Operational Research
, vol.155
, pp. 426-438
-
-
Rajendran, C.1
Ziegler, H.2
-
41
-
-
29444438437
-
Dynamic job shop scheduling: a survey of simulation research
-
Ramasesh R. Dynamic job shop scheduling: a survey of simulation research. OMEGA 18 (1990) 43-57
-
(1990)
OMEGA
, vol.18
, pp. 43-57
-
-
Ramasesh, R.1
-
43
-
-
0034689098
-
Theory of constraints in a service application: the Swine Graphics case
-
Spencer M.S. Theory of constraints in a service application: the Swine Graphics case. International Journal of Production Research 38 (2000) 1101-1108
-
(2000)
International Journal of Production Research
, vol.38
, pp. 1101-1108
-
-
Spencer, M.S.1
-
44
-
-
0025700701
-
Some efficient heuristic methods for the flowshop sequencing problem
-
Taillard E. Some efficient heuristic methods for the flowshop sequencing problem. European Journal of Operational Research 47 (1990) 65-79
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 65-79
-
-
Taillard, E.1
-
47
-
-
0024700013
-
A new heuristic method for the flowshop sequencing problem
-
Widmer M., and Hertz A. A new heuristic method for the flowshop sequencing problem. European Journal of Operational Research 41 (1989) 186-193
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 186-193
-
-
Widmer, M.1
Hertz, A.2
-
48
-
-
0002274219
-
Input/output control - a real handle on lead time
-
Wight O.W. Input/output control - a real handle on lead time. Production and Inventory Management 11 (1970) 9-13
-
(1970)
Production and Inventory Management
, vol.11
, pp. 9-13
-
-
Wight, O.W.1
|