메뉴 건너뛰기




Volumn 52, Issue 1, 2007, Pages 89-106

Dispatching in flowshops with bottleneck machines

Author keywords

Bottleneck machines; Dispatching rules; Earliness; Flowshop; Flowtime; Tardiness

Indexed keywords

INDUSTRIAL ENGINEERING; OPTIMIZATION; PROBLEM SOLVING; SCHEDULING;

EID: 33846357486     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cie.2006.10.006     Document Type: Article
Times cited : (28)

References (48)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release and sequencing interaction in job shop scheduling
    • Ahmed I., and Fisher W.W. Due date assignment, job order release and sequencing interaction in job shop scheduling. Decision Sciences 23 (1992) 633-647
    • (1992) Decision Sciences , vol.23 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 2
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker K.R. The effects of input control in a simple scheduling model. Journal of Operations Management 4 (1984) 99-112
    • (1984) Journal of Operations Management , vol.4 , pp. 99-112
    • Baker, K.R.1
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • Baker K.R. Sequencing rules and due-date assignments in a job shop. Management Science 30 (1984) 1093-1104
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 7
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job, m-machine sequencing problem
    • Campbell H.G., Dudek R.A., and Smith M.L. A heuristic algorithm for the n-job, m-machine sequencing problem. Management Science 16 (1970) B630-B637
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, M.L.3
  • 8
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini R., Perona M., and Portioli A. Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research 36 (1998) 2931-2951
    • (1998) International Journal of Production Research , vol.36 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 9
    • 0017516618 scopus 로고
    • An evaluation of flow-shop sequencing heuristics
    • Dannenbring D.G. An evaluation of flow-shop sequencing heuristics. Management Science 23 (1977) 1174-1182
    • (1977) Management Science , vol.23 , pp. 1174-1182
    • Dannenbring, D.G.1
  • 10
    • 0037578177 scopus 로고    scopus 로고
    • Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop
    • Framinan J.M., Leisten R., and Rajendran C. Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop. International Journal of Production Research 41 (2003) 121-148
    • (2003) International Journal of Production Research , vol.41 , pp. 121-148
    • Framinan, J.M.1    Leisten, R.2    Rajendran, C.3
  • 13
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt R. A survey of priority rule-based scheduling. OR Spektrum 11 (1989) 3-16
    • (1989) OR Spektrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 16
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: a comparison by simulation
    • Hendry L., and Wong S.K. Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research 32 (1994) 2827-2842
    • (1994) International Journal of Production Research , vol.32 , pp. 2827-2842
    • Hendry, L.1    Wong, S.K.2
  • 17
    • 0029264383 scopus 로고
    • Flowshop sequencing with mean flowtime objective
    • Ho J.C. Flowshop sequencing with mean flowtime objective. European Journal of Operational Research 81 (1995) 571-578
    • (1995) European Journal of Operational Research , vol.81 , pp. 571-578
    • Ho, J.C.1
  • 18
    • 0000177367 scopus 로고
    • Application of the branch-and-bound technique to some flowshop scheduling problems
    • Ignall E., and Schrage L. Application of the branch-and-bound technique to some flowshop scheduling problems. Operations Research 13 (1965) 400-412
    • (1965) Operations Research , vol.13 , pp. 400-412
    • Ignall, E.1    Schrage, L.2
  • 19
    • 0029632605 scopus 로고
    • Modified simulated annealing algorithms for the flow shop sequencing problems
    • Ishibuchi H., Misaki S., and Tanaka H. Modified simulated annealing algorithms for the flow shop sequencing problems. European Journal of Operational Research 81 (1995) 388-398
    • (1995) European Journal of Operational Research , vol.81 , pp. 388-398
    • Ishibuchi, H.1    Misaki, S.2    Tanaka, H.3
  • 21
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules
    • Johnson S.M. Optimal two- and three-stage production schedules. Naval Research Logistics 1 (1954) 61-68
    • (1954) Naval Research Logistics , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 22
    • 0012298197 scopus 로고
    • Priority dispatching with operation due-dates in a job shop
    • Kanet J.J., and Hayya J.G. Priority dispatching with operation due-dates in a job shop. Journal of Operations Management 2 (1982) 167-176
    • (1982) Journal of Operations Management , vol.2 , pp. 167-176
    • Kanet, J.J.1    Hayya, J.G.2
  • 23
    • 0027240799 scopus 로고
    • Heuristics for flowshop scheduling problems with mean tardiness
    • Kim Y.D. Heuristics for flowshop scheduling problems with mean tardiness. Journal of Operational Research Society 44 (1993) 19-29
    • (1993) Journal of Operational Research Society , vol.44 , pp. 19-29
    • Kim, Y.D.1
  • 29
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flowshop sequencing problem
    • Nawaz M., Enscore Jr. E.E., and Ham I. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. OMEGA 11 (1983) 91-95
    • (1983) OMEGA , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 31
    • 0026953379 scopus 로고
    • Capacity based order review/release strategies to improve manufacturing performance
    • Philipoom P.R., and Fry T.D. Capacity based order review/release strategies to improve manufacturing performance. International Journal of Production Research 30 (1992) 2559-2572
    • (1992) International Journal of Production Research , vol.30 , pp. 2559-2572
    • Philipoom, P.R.1    Fry, T.D.2
  • 32
    • 0033101604 scopus 로고    scopus 로고
    • Order review/release in the absence of adherence to formal scheduling policies
    • Philipoom P.R., and Fry T.D. Order review/release in the absence of adherence to formal scheduling policies. Journal of Operations Management 17 (1999) 327-342
    • (1999) Journal of Operations Management , vol.17 , pp. 327-342
    • Philipoom, P.R.1    Fry, T.D.2
  • 33
    • 0032043112 scopus 로고    scopus 로고
    • Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell
    • Parthasarathy S., and Rajendran C. Scheduling to minimize mean tardiness and weighted mean tardiness in flowshop and flowline-based manufacturing cell. Computers and Industrial Engineering 34 (1998) 531-546
    • (1998) Computers and Industrial Engineering , vol.34 , pp. 531-546
    • Parthasarathy, S.1    Rajendran, C.2
  • 35
    • 0027912256 scopus 로고
    • Optimising theory of constraints when multiple constrained resources exist
    • Plenert G. Optimising theory of constraints when multiple constrained resources exist. European Journal of Operational Research 70 (1993) 126-133
    • (1993) European Journal of Operational Research , vol.70 , pp. 126-133
    • Plenert, G.1
  • 36
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job shop environment
    • Ragatz G.L., and Mabert V.A. An evaluation of order release mechanisms in a job shop environment. Decision Sciences 19 (1988) 167-189
    • (1988) Decision Sciences , vol.19 , pp. 167-189
    • Ragatz, G.L.1    Mabert, V.A.2
  • 37
    • 0027542699 scopus 로고
    • Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
    • Rajendran C. Heuristic algorithm for scheduling in a flowshop to minimize total flowtime. International Journal of Production Economics 29 (1993) 65-73
    • (1993) International Journal of Production Economics , vol.29 , pp. 65-73
    • Rajendran, C.1
  • 38
    • 0031275336 scopus 로고    scopus 로고
    • An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
    • Rajendran C., and Ziegler H. An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs. European Journal of Operational Research 103 (1997) 129-138
    • (1997) European Journal of Operational Research , vol.103 , pp. 129-138
    • Rajendran, C.1    Ziegler, H.2
  • 39
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flowshops and jobshops
    • Rajendran C., and Holthaus O. A comparative study of dispatching rules in dynamic flowshops and jobshops. European Journal of Operational Research 116 (1999) 156-170
    • (1999) European Journal of Operational Research , vol.116 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 40
    • 1642559633 scopus 로고    scopus 로고
    • Ant colony algorithms for permutation flowshop scheduling to minimize makespan/ total flowtime of jobs
    • Rajendran C., and Ziegler H. Ant colony algorithms for permutation flowshop scheduling to minimize makespan/ total flowtime of jobs. European Journal of Operational Research 155 (2004) 426-438
    • (2004) European Journal of Operational Research , vol.155 , pp. 426-438
    • Rajendran, C.1    Ziegler, H.2
  • 41
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: a survey of simulation research
    • Ramasesh R. Dynamic job shop scheduling: a survey of simulation research. OMEGA 18 (1990) 43-57
    • (1990) OMEGA , vol.18 , pp. 43-57
    • Ramasesh, R.1
  • 43
    • 0034689098 scopus 로고    scopus 로고
    • Theory of constraints in a service application: the Swine Graphics case
    • Spencer M.S. Theory of constraints in a service application: the Swine Graphics case. International Journal of Production Research 38 (2000) 1101-1108
    • (2000) International Journal of Production Research , vol.38 , pp. 1101-1108
    • Spencer, M.S.1
  • 44
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flowshop sequencing problem
    • Taillard E. Some efficient heuristic methods for the flowshop sequencing problem. European Journal of Operational Research 47 (1990) 65-79
    • (1990) European Journal of Operational Research , vol.47 , pp. 65-79
    • Taillard, E.1
  • 47
    • 0024700013 scopus 로고
    • A new heuristic method for the flowshop sequencing problem
    • Widmer M., and Hertz A. A new heuristic method for the flowshop sequencing problem. European Journal of Operational Research 41 (1989) 186-193
    • (1989) European Journal of Operational Research , vol.41 , pp. 186-193
    • Widmer, M.1    Hertz, A.2
  • 48
    • 0002274219 scopus 로고
    • Input/output control - a real handle on lead time
    • Wight O.W. Input/output control - a real handle on lead time. Production and Inventory Management 11 (1970) 9-13
    • (1970) Production and Inventory Management , vol.11 , pp. 9-13
    • Wight, O.W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.