-
1
-
-
0142214693
-
Tuning PID Controllers using Achievable Performance Index
-
Agrawal, P. and S. Lakshminarayanan, "Tuning PID Controllers using Achievable Performance Index," Ind. Eng. Chem. Res. 42(22), 5576-5582 (2003).
-
(2003)
Ind. Eng. Chem. Res
, vol.42
, Issue.22
, pp. 5576-5582
-
-
Agrawal, P.1
Lakshminarayanan, S.2
-
3
-
-
17144407644
-
Achievable Performance Assessment and Design for Parallel Cascade Systems
-
Chen, J., S.-C. Huang and Y. Yea, "Achievable Performance Assessment and Design for Parallel Cascade Systems," J. Chem. Eng. Japan 38, 188-201 (2005).
-
(2005)
J. Chem. Eng. Japan
, vol.38
, pp. 188-201
-
-
Chen, J.1
Huang, S.-C.2
Yea, Y.3
-
4
-
-
0026994413
-
Performance Assessment Measures for Univariate Feedback Control
-
Desborough, L. D. and T. J. Harris, "Performance Assessment Measures for Univariate Feedback Control," Can. J. Chem. Eng. 70, 1186-1197 (1992).
-
(1992)
Can. J. Chem. Eng
, vol.70
, pp. 1186-1197
-
-
Desborough, L.D.1
Harris, T.J.2
-
5
-
-
0027642981
-
Performance Assessment Measures for Univariate Feedforward/Feedback Control
-
Desborough, L. D. and T. J. Harris, "Performance Assessment Measures for Univariate Feedforward/Feedback Control," Can. J. Chem. Eng. 71, 605-616 (1993).
-
(1993)
Can. J. Chem. Eng
, vol.71
, pp. 605-616
-
-
Desborough, L.D.1
Harris, T.J.2
-
6
-
-
0005104628
-
Increasing Customer Value of Industrial Control Performance Monitoring -Honeywell's Experience
-
Tucson, U.S
-
Desborough, L. D. and R. M. Miller, "Increasing Customer Value of Industrial Control Performance Monitoring -Honeywell's Experience," Proceedings of CPC VI, Tucson, U.S. (2001).
-
(2001)
Proceedings of CPC
, vol.6
-
-
Desborough, L.D.1
Miller, R.M.2
-
7
-
-
33846274110
-
-
Doyle III, F. J., E. P. Gatzke and R. S. Parker, Process Control Modules: A Software Laboratory for Control Design, Prentice Hall (1999).
-
Doyle III, F. J., E. P. Gatzke and R. S. Parker, "Process Control Modules: A Software Laboratory for Control Design," Prentice Hall (1999).
-
-
-
-
8
-
-
27544471767
-
Attainment of PI Achievable Performance for Linear SISO Processes with Dead Time by Iterative Tuning
-
Goradia, D. B., S. Lakshminarayanan and G. P. Rangaiah, "Attainment of PI Achievable Performance for Linear SISO Processes with Dead Time by Iterative Tuning," Can J. Chem. Eng. 83, 723-736 (2005).
-
(2005)
Can J. Chem. Eng
, vol.83
, pp. 723-736
-
-
Goradia, D.B.1
Lakshminarayanan, S.2
Rangaiah, G.P.3
-
9
-
-
0024750457
-
Assessment of Control Loop Performance
-
Harris, T. J., "Assessment of Control Loop Performance," Can. J. Chem. Eng. 67, 856-861 (1989).
-
(1989)
Can. J. Chem. Eng
, vol.67
, pp. 856-861
-
-
Harris, T.J.1
-
12
-
-
0031163922
-
Good, Bad or Optimal? Performance Assessment of Multivariate Processes
-
Huang, B., S. L. Shah and E. Z. Kwok, "Good, Bad or Optimal? Performance Assessment of Multivariate Processes," Automatica 33(6), 1175-1183 (1997).
-
(1997)
Automatica
, vol.33
, Issue.6
, pp. 1175-1183
-
-
Huang, B.1
Shah, S.L.2
Kwok, E.Z.3
-
13
-
-
0031162425
-
Controller Performance Assessment by Frequency Domain Techniques
-
Kendra S. J. and A. Cinar, "Controller Performance Assessment by Frequency Domain Techniques," J. Proc. Cont. 7, 181-194 (1997).
-
(1997)
J. Proc. Cont
, vol.7
, pp. 181-194
-
-
Kendra, S.J.1
Cinar, A.2
-
14
-
-
0033954875
-
Performance Assessment of Cascade Control Loops
-
Ko, B. S. and T. F. Edgar, "Performance Assessment of Cascade Control Loops," AIChE J. 46, 281-291 (2000).
-
(2000)
AIChE J
, vol.46
, pp. 281-291
-
-
Ko, B.S.1
Edgar, T.F.2
-
15
-
-
0002171478
-
Controller Performance Monitoring and Diagnosis: Experiences and Challenges
-
Lake Tahoe, U.S
-
Kozub, D., "Controller Performance Monitoring and Diagnosis: Experiences and Challenges," Proceedings of CPC V, Lake Tahoe, U.S. (1996).
-
(1996)
Proceedings of CPC
, vol.5
-
-
Kozub, D.1
-
16
-
-
0026833210
-
-
Krishnaswamy, P. R. and G. P. Rangaiah, Role of Secondary Integral Action in Cascade Control, Trans IChemE: Part A - Chemical Engineering Research and Design 70, 149-152 (1992).
-
Krishnaswamy, P. R. and G. P. Rangaiah, "Role of Secondary Integral Action in Cascade Control," Trans IChemE: Part A - Chemical Engineering Research and Design 70, 149-152 (1992).
-
-
-
-
17
-
-
0025503376
-
When to use Cascade Control
-
Krishnaswamy, P. R., G. P. Rangaiah, R. K. Jha and P. B. Deshpande, "When to use Cascade Control," Ind Eng. Chem. Res. 29, 2163-2166 (1990).
-
(1990)
Ind Eng. Chem. Res
, vol.29
, pp. 2163-2166
-
-
Krishnaswamy, P.R.1
Rangaiah, G.P.2
Jha, R.K.3
Deshpande, P.B.4
-
19
-
-
0032469932
-
Control Performance Monitoring - A Review and Assessment
-
Comp. & Chem. Engg
-
Qin, S. J., "Control Performance Monitoring - A Review and Assessment," Comp. & Chem. Engg. 23, 173-186 (1998).
-
(1998)
, vol.23
, pp. 173-186
-
-
Qin, S.J.1
-
21
-
-
0027545302
-
Monitoring and Diagnosing Control Loop Performance: The Single Loop Case
-
Stanfelj, N., T. E. Marlin and J. F. MacGregor, "Monitoring and Diagnosing Control Loop Performance: The Single Loop Case," Ind. Eng. Chem. Res. 32, 301-314 (1993).
-
(1993)
Ind. Eng. Chem. Res
, vol.32
, pp. 301-314
-
-
Stanfelj, N.1
Marlin, T.E.2
MacGregor, J.F.3
-
23
-
-
0033117561
-
Refinery-Wide Control Loop Performance Assessment
-
Thornhill, N. F., M. Oettinger and P. Fedenczuk, "Refinery-Wide Control Loop Performance Assessment," J. Proc. Cont. 9, 109-124 (1999).
-
(1999)
J. Proc. Cont
, vol.9
, pp. 109-124
-
-
Thornhill, N.F.1
Oettinger, M.2
Fedenczuk, P.3
-
24
-
-
0030218450
-
Performance Monitoring of Control Systems using Likelihood Methods
-
Tyler, M. L. and M. Morari, "Performance Monitoring of Control Systems using Likelihood Methods," Automatica 32, 1145-1162 (1996).
-
(1996)
Automatica
, vol.32
, pp. 1145-1162
-
-
Tyler, M.L.1
Morari, M.2
-
25
-
-
0037727467
-
Feedback and Feedforward Performance Analysis of the Shell Industrial Closed-Loop Data Set
-
Banff, AB, Canada
-
Vishnubhotla, A., S. L. Shah and B. Huang, "Feedback and Feedforward Performance Analysis of the Shell Industrial Closed-Loop Data Set," Proceedings of ADCHEM, Banff, AB, Canada, (1997).
-
(1997)
Proceedings of ADCHEM
-
-
Vishnubhotla, A.1
Shah, S.L.2
Huang, B.3
-
26
-
-
33846288819
-
Reducing Process Disturbances with Cascade Control
-
August
-
Webb, P. U., "Reducing Process Disturbances with Cascade Control," Control Engineering August, 73-76 (1961).
-
(1961)
Control Engineering
, pp. 73-76
-
-
Webb, P.U.1
|