Impact of overmanning on mechanical and sheet metal labor productivity

Author keywords

Construction management; Labor; Mechanical systems; Metals; Productivity; Scheduling; Sheets

Indexed keywords

CONSTRUCTION MANAGEMENT; LABOR PRODUCTIVITY; MECHANICAL SYSTEMS; OVERMANNING;

EID: 33845811018     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:1(22)     Document Type: Article
Times cited : (35)

References (15)
  • 1
    • 0018998806 scopus 로고
    • Improving motivation and productivity on large projects
    • Borcherding, J. D., Samelson, N. M., and Sabastian, S. M. (1980). " Improving motivation and productivity on large projects.. " J. Constr. Div., 106 (1), 73-89.
    • (1980) J. Constr. Div. , vol.106 , Issue.1 , pp. 73-89
    • Borcherding, J.D.1    Samelson, N.M.2    Sabastian, S.M.3
  • 2
    • 0004001992 scopus 로고    scopus 로고
    • U.S. Department of Labor, Washington, D.C.
    • Bureau of Labor Statistics. (2002). Occupational outlook handbook, U.S. Department of Labor, Washington, D.C.
    • (2002) Occupational Outlook Handbook
  • 5
    • 0032656251 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for Mechanical Construction
    • Hanna, A. S., (1999). " Impact of change orders on labor efficiency for Mechanical Construction.. " J. Constr. Eng. Manage., 125 (3), 176-184.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 176-184
    • Hanna, A.S.1
  • 9
    • 2342626763 scopus 로고    scopus 로고
    • Planned and unplanned schedule compression: The impact on labour
    • Noyce, D. A., and Hanna, A. S. (1998). " Planned and unplanned schedule compression: The impact on labour.. " Constr. Manage. Econom., (16), 79-90.
    • (1998) Constr. Manage. Econom. , Issue.16 , pp. 79-90
    • Noyce, D.A.1    Hanna, A.S.2
  • 10
    • 3242739581 scopus 로고
    • Overcoming the problems of construction on large central station boilers
    • O'Conner, L. V. (1969). " Overcoming the problems of construction on large central station boilers.. " Proc., American Power Conf., 518-528.
    • (1969) Proc., American Power Conf. , pp. 518-528
    • O'Conner, L.V.1
  • 11
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labor productivity
    • Thomas, H. R. (2000). " Schedule acceleration, work flow, and labor productivity.. " J. Constr. Eng. Manage., 126 (4), 261-267.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 261-267
    • Thomas, H.R.1
  • 13
    • 0242560800 scopus 로고
    • Dept. of the Army, Office of the Chief Engineers, Washington, D.C., EP-415-1-3 at 3-2.
    • U.S. Army (1979). Modification impact evaluation guide, Dept. of the Army, Office of the Chief Engineers, Washington, D.C., EP-415-1-3 at 3-2.
    • (1979) Modification Impact Evaluation Guide
  • 15
    • 3142638412 scopus 로고
    • A pragmatic approach to using resource loading, production, and learning curves on construction projects
    • Wideman, M. (1994). " A pragmatic approach to using resource loading, production, and learning curves on construction projects.. " Can. J. Civ. Eng., 21, 939-953.
    • (1994) Can. J. Civ. Eng. , vol.21 , pp. 939-953
    • Wideman, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.