|
Volumn 49, Issue 1, 2007, Pages 79-92
|
A comparison of the HLW underground repository cost for the vertical and horizontal emplacement options in Korea
|
Author keywords
Construction cost; Cost driver; Cost estimation; Repository; Spent fuel
|
Indexed keywords
COST BENEFIT ANALYSIS;
GEOLOGICAL REPOSITORIES;
RADIOACTIVE WASTE DISPOSAL;
SPENT FUELS;
CANISTERS;
CONSTRUCTION COST;
COST DRIVER;
COST ESTIMATION;
RADIOACTIVE WASTES;
|
EID: 33845642167
PISSN: 01491970
EISSN: None
Source Type: Journal
DOI: 10.1016/j.pnucene.2006.09.004 Document Type: Article |
Times cited : (2)
|
References (10)
|