-
1
-
-
0032069959
-
Product design through multivariate statistical analysis of process data
-
Jaeckle, C. M.; MacGregor, J. F. Product Design Through Multivariate Statistical Analysis of Process Data. AIChE J. 1998, 44 (5), 1105-1118.
-
(1998)
AIChE J.
, vol.44
, Issue.5
, pp. 1105-1118
-
-
Jaeckle, C.M.1
MacGregor, J.F.2
-
2
-
-
0037282647
-
Multivariate dynamic data modeling for analysis and statistical process control of batch processes, start-ups and grade transitions
-
Kourti, T. Multivariate dynamic data modeling for analysis and statistical process control of batch processes, start-ups and grade transitions. J. Chemom. 2003, 17, 93-109.
-
(2003)
J. Chemom.
, vol.17
, pp. 93-109
-
-
Kourti, T.1
-
3
-
-
0037074623
-
Advances in simultaneous strategies for dynamic process optimization
-
Biegler, L. T.; Cervantes, A. M.; Wachter, A. Advances in Simultaneous Strategies for Dynamic Process Optimization. Chem. Eng. Sci. 2002, 57 (4), 575-593.
-
(2002)
Chem. Eng. Sci.
, vol.57
, Issue.4
, pp. 575-593
-
-
Biegler, L.T.1
Cervantes, A.M.2
Wachter, A.3
-
4
-
-
0028497977
-
Solution of a class of multistage dynamic optimization problems. 1. Problems without path constraints
-
Vassiliadis, V. S.; Sargent, W. H.; Pantelides, C. C. Solution of a Class of Multistage Dynamic Optimization Problems. 1. Problems without Path Constraints. Ind. Eng. Chem. Res. 1994, 33, 2111-2122.
-
(1994)
Ind. Eng. Chem. Res.
, vol.33
, pp. 2111-2122
-
-
Vassiliadis, V.S.1
Sargent, W.H.2
Pantelides, C.C.3
-
5
-
-
0028499633
-
Solution of a class of multistage dynamic optimization problems. 2. Problems with path constraints
-
Vassiliadis, V. S.; Sargent, W. H.; Pantelides, C. C. Solution of a Class of Multistage Dynamic Optimization Problems. 2. Problems with Path Constraints. Ind. Eng. Chem. Res. 1994, 33, 2123-2133.
-
(1994)
Ind. Eng. Chem. Res.
, vol.33
, pp. 2123-2133
-
-
Vassiliadis, V.S.1
Sargent, W.H.2
Pantelides, C.C.3
-
6
-
-
0037438469
-
Dynamic optimization of batch processes. II. Role of measurements in handling uncertainty
-
Srinivasan, B.; Bonvin, D.; Visser, E.; Palanki, S. Dynamic optimization of batch processes. II. Role of measurements in handling uncertainty. Comput. Chem. Eng. 2003, 27, 27-44.
-
(2003)
Comput. Chem. Eng.
, vol.27
, pp. 27-44
-
-
Srinivasan, B.1
Bonvin, D.2
Visser, E.3
Palanki, S.4
-
7
-
-
0032164685
-
Optimization of molecular-weight distribution using batch-to-batch adjustments
-
Clarke-Pringle, T.; MacGregor, J. F. Optimization of molecular-weight distribution using batch-to-batch adjustments. Ind. Eng. Chem. Res. 1998, 37, 3660-3669.
-
(1998)
Ind. Eng. Chem. Res.
, vol.37
, pp. 3660-3669
-
-
Clarke-Pringle, T.1
MacGregor, J.F.2
-
8
-
-
0022864679
-
Tendency modeling of semibatch reactors for optimization and control
-
Filippi, C.; Greffe, J. L.; Bordet, J.; Villermaux, J. Tendency Modeling of Semibatch Reactors for Optimization and Control. Chem. Eng. Sci. 1986, 41 (4), 913-920.
-
(1986)
Chem. Eng. Sci.
, vol.41
, Issue.4
, pp. 913-920
-
-
Filippi, C.1
Greffe, J.L.2
Bordet, J.3
Villermaux, J.4
-
9
-
-
0032216396
-
Use of tendency models and their uncertainty in the design of state estimators for batch reactors
-
Fotopoulos, J.; Georgakis, C.; Stenger, H. G. Use of tendency models and their uncertainty in the design of state estimators for batch reactors. Chem. Eng. Process. 1998, 37, 545-558.
-
(1998)
Chem. Eng. Process.
, vol.37
, pp. 545-558
-
-
Fotopoulos, J.1
Georgakis, C.2
Stenger, H.G.3
-
10
-
-
0026834264
-
Feedback control of polymer quality in semi-batch copolymerization reactors
-
Kozub, D. J.; MacGregor, J. F. Feedback control of polymer quality in semi-batch copolymerization reactors. Chem. Eng. Sci. 1992, 47 (4), 929-942.
-
(1992)
Chem. Eng. Sci.
, vol.47
, Issue.4
, pp. 929-942
-
-
Kozub, D.J.1
MacGregor, J.F.2
-
11
-
-
0347927265
-
Dynamic optimization of batch processes. I. Characterization of the nominal solution
-
Srinivasan, B.; Palanki, S.; Bonvin, D. Dynamic optimization of batch processes. I. Characterization of the nominal solution. Comput. Chem. Eng. 2003, 27, 1-26.
-
(2003)
Comput. Chem. Eng.
, vol.27
, pp. 1-26
-
-
Srinivasan, B.1
Palanki, S.2
Bonvin, D.3
-
12
-
-
0036732887
-
Enzymatic acidolysis in hexane to produce n-3 or n-6 FA-enriched structured lipids for coconut oil: Optimization of reactions by response surface methodology
-
Rao, R.; Manohar, B.; Sambaiah, K.; Lokesh, B. R. Enzymatic acidolysis in hexane to produce n-3 or n-6 FA-enriched structured lipids for coconut oil: Optimization of reactions by response surface methodology. J. Am. Oil Chem. Soc. 2002, 79 (9), 885-890.
-
(2002)
J. Am. Oil Chem. Soc.
, vol.79
, Issue.9
, pp. 885-890
-
-
Rao, R.1
Manohar, B.2
Sambaiah, K.3
Lokesh, B.R.4
-
13
-
-
1542284713
-
Bioreactor culture of oil palm (Elaeis guineensis) and effects of nitrogen source, inoculum size, and conditioned medium on biomass production
-
Gorret, N.; bin Rosli, A. K.; Oppenheim, S. F.; Willis, L. B.; Lessard, P. A.; Rha, C. K.; Sinskey, A. J. Bioreactor culture of oil palm (Elaeis guineensis) and effects of nitrogen source, inoculum size, and conditioned medium on biomass production. J. Biotechnol. 2004, 708 (3), 253-263.
-
(2004)
J. Biotechnol.
, vol.708
, Issue.3
, pp. 253-263
-
-
Gorret, N.1
Bin Rosli, A.K.2
Oppenheim, S.F.3
Willis, L.B.4
Lessard, P.A.5
Rha, C.K.6
Sinskey, A.J.7
-
14
-
-
0034125832
-
A technique for integrated quality control, profile control and constraint handling for batch processes
-
Chin, I. S.; Lee, K. S.; Lee, J. H. A Technique for Integrated Quality Control, Profile Control and Constraint Handling for Batch Processes. Ind. Eng. Chem. Res. 2000, 39, 693-705.
-
(2000)
Ind. Eng. Chem. Res.
, vol.39
, pp. 693-705
-
-
Chin, I.S.1
Lee, K.S.2
Lee, J.H.3
-
15
-
-
1342306725
-
Control of batch product quality by trajectory manipulation using latent variable models
-
Flores-Cerrillo, J.; MacGregor, J. F. Control of batch product quality by trajectory manipulation using latent variable models. J. Process Control 2004, 14, 539-553.
-
(2004)
J. Process Control
, vol.14
, pp. 539-553
-
-
Flores-Cerrillo, J.1
MacGregor, J.F.2
-
16
-
-
0033517115
-
Latent variable multivariate regression modeling
-
Burnham, A.; MacGregor, J. F.; Viveros, R. Latent variable multivariate regression modeling. Chemom. Intell. Lab. Syst. 1999, 48, 167-180.
-
(1999)
Chemom. Intell. Lab. Syst.
, vol.48
, pp. 167-180
-
-
Burnham, A.1
MacGregor, J.F.2
Viveros, R.3
-
17
-
-
0034642951
-
Industrial applications of product design through the inversion of latent variable models
-
Jaeckle, C. M.; MacGregor, J. F. Industrial applications of product design through the inversion of latent variable models. Chemom. Intell. Lab. Syst. 2000, 50, 199-210.
-
(2000)
Chemom. Intell. Lab. Syst.
, vol.50
, pp. 199-210
-
-
Jaeckle, C.M.1
MacGregor, J.F.2
-
18
-
-
0345869929
-
Product optimization and control in the latent variable space of nonlinear PLS models
-
Yacoub, F.; MacGregor, J. F. Product optimization and control in the latent variable space of nonlinear PLS models. Chemom. Intell. Lab. Syst. 2004, 70, 63-74.
-
(2004)
Chemom. Intell. Lab. Syst.
, vol.70
, pp. 63-74
-
-
Yacoub, F.1
MacGregor, J.F.2
-
19
-
-
0028483476
-
Monitoring batch processes using multiway principal components
-
Nomikos, P.; MacGregor, J. F. Monitoring Batch Processes using Multiway Principal Components. AIChE J. 1994, 40 (8), 1361-1375.
-
(1994)
AIChE J.
, vol.40
, Issue.8
, pp. 1361-1375
-
-
Nomikos, P.1
MacGregor, J.F.2
-
20
-
-
0029252734
-
Multivariate SPC charts for monitoring batch processes
-
Nomikos, P.; MacGregor, J. F. Multivariate SPC Charts for Monitoring Batch Processes. Technometrics 1995, 37 (1), 41-58.
-
(1995)
Technometrics
, vol.37
, Issue.1
, pp. 41-58
-
-
Nomikos, P.1
MacGregor, J.F.2
-
21
-
-
0028825273
-
Multi-way partial least squares in monitoring batch processes
-
Nomikos, P.; MacGregor, J. F. Multi-way partial least squares in monitoring batch processes. Chemom. Intell. Lab. Syst. 1995, 30, 97-108.
-
(1995)
Chemom. Intell. Lab. Syst.
, vol.30
, pp. 97-108
-
-
Nomikos, P.1
MacGregor, J.F.2
-
22
-
-
0032045464
-
Synchronization of batch trajectories using dynamic time warping
-
Kassidas, A.; MacGregor, J. F.; Taylor, P. Synchronization of batch trajectories using dynamic time warping. AIChE J. 1998, 44 (4), 864-875.
-
(1998)
AIChE J.
, vol.44
, Issue.4
, pp. 864-875
-
-
Kassidas, A.1
MacGregor, J.F.2
Taylor, P.3
-
23
-
-
0038044917
-
Troubleshooting of an industrial batch process using multivariate methods
-
Garcia, S.; Kourti, T.; MacGregor, J. F.; Matheos, A.; Murphy, G. Troubleshooting of an industrial batch process using multivariate methods. Ind. Eng. Chem. Res. 2003, 42 (15), 3592-3601.
-
(2003)
Ind. Eng. Chem. Res.
, vol.42
, Issue.15
, pp. 3592-3601
-
-
Garcia, S.1
Kourti, T.2
MacGregor, J.F.3
Matheos, A.4
Murphy, G.5
-
24
-
-
0000736392
-
Analysis of multiblock and hierarchical PCA and PLS models
-
Westerhuis, J.; Kourti, T.; MacGregor, J. F. Analysis of Multiblock and Hierarchical PCA and PLS Models. J. Chemom. 1998, 12, 301-321.
-
(1998)
J. Chemom.
, vol.12
, pp. 301-321
-
-
Westerhuis, J.1
Kourti, T.2
MacGregor, J.F.3
-
25
-
-
33645480941
-
-
Ph.D.Thesis, McMaster University, Hamilton, Ontario, Canada
-
Garcia, S. Batch Process Improvement Using Latent Variable Methods. Ph.D.Thesis, McMaster University, Hamilton, Ontario, Canada, 2004.
-
(2004)
Batch Process Improvement Using Latent Variable Methods
-
-
Garcia, S.1
-
26
-
-
17744377956
-
Latent variable MPC for trajectory tracking in batch processes
-
Flores-Cerrillo, J.; MacGregor, J. F. Latent variable MPC for trajectory tracking in batch processes. J. Process Control 2005, 15 (6), 651-663.
-
(2005)
J. Process Control
, vol.15
, Issue.6
, pp. 651-663
-
-
Flores-Cerrillo, J.1
MacGregor, J.F.2
|