메뉴 건너뛰기




Volumn 34, Issue 7, 2007, Pages 2130-2146

Scheduling with tool changes to minimize total completion time under controllable machining conditions

Author keywords

CNC machines; Heuristics; Scheduling

Indexed keywords

GENETIC ALGORITHMS; HEURISTIC METHODS; LINEAR PROGRAMMING; NUMERICAL METHODS; PARAMETER ESTIMATION; PROBLEM SOLVING;

EID: 33845344303     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2005.08.014     Document Type: Article
Times cited : (27)

References (17)
  • 1
    • 0037316821 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time. a study of heuristics and their performance
    • Akturk M.S., Ghosh J.B., and Gunes E.D. Scheduling with tool changes to minimize total completion time. a study of heuristics and their performance. Naval Research Logistics 50 (2003) 15-30
    • (2003) Naval Research Logistics , vol.50 , pp. 15-30
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 2
    • 0015671594 scopus 로고
    • Optimal selection of machining variables using geometric programming
    • Petropoulos P. Optimal selection of machining variables using geometric programming. International Journal of Production Research 11 (1973) 305-314
    • (1973) International Journal of Production Research , vol.11 , pp. 305-314
    • Petropoulos, P.1
  • 3
    • 0031186426 scopus 로고    scopus 로고
    • Machining condition optimization by genetic algorithms and simulated annealing
    • Khan Z., Prasad B., and Singh T. Machining condition optimization by genetic algorithms and simulated annealing. Computers and Operations Research 24 (1997) 647-657
    • (1997) Computers and Operations Research , vol.24 , pp. 647-657
    • Khan, Z.1    Prasad, B.2    Singh, T.3
  • 4
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, part I. minimization of the number of tool switches
    • Tang C.S., and Denardo E.V. Models arising from a flexible manufacturing machine, part I. minimization of the number of tool switches. Operations Research 36 (1988) 767-777
    • (1988) Operations Research , vol.36 , pp. 767-777
    • Tang, C.S.1    Denardo, E.V.2
  • 5
    • 0032131897 scopus 로고    scopus 로고
    • Heuristics for minimizing tool switches when scheduling part types on a flexible machine
    • Hertz A., Laporte G., Mittaz M., and Stecke K.E. Heuristics for minimizing tool switches when scheduling part types on a flexible machine. IIE Transactions 30 (1998) 689-694
    • (1998) IIE Transactions , vol.30 , pp. 689-694
    • Hertz, A.1    Laporte, G.2    Mittaz, M.3    Stecke, K.E.4
  • 6
    • 0027591340 scopus 로고
    • A synthesis of decision models for tool management in automated manufacturing
    • Gray A.E., Seidmann A., and Stecke K.E. A synthesis of decision models for tool management in automated manufacturing. Management Science 39 (1993) 549-567
    • (1993) Management Science , vol.39 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 7
    • 0028383503 scopus 로고
    • Scheduling multiple variable-speed machines
    • Trick M.A. Scheduling multiple variable-speed machines. Operations Research 42 (1994) 234-248
    • (1994) Operations Research , vol.42 , pp. 234-248
    • Trick, M.A.1
  • 8
    • 38149145567 scopus 로고
    • Scheduling jobs on a single machine with release dates, delivery times and controllable processing times. worst case analysis
    • Zdrzalka S. Scheduling jobs on a single machine with release dates, delivery times and controllable processing times. worst case analysis. Operations Research Letters 10 (1991) 519-523
    • (1991) Operations Research Letters , vol.10 , pp. 519-523
    • Zdrzalka, S.1
  • 9
    • 0030737194 scopus 로고    scopus 로고
    • Flow-line scheduling problem with controllable processing times
    • Karabati S., and Kouvelis P. Flow-line scheduling problem with controllable processing times. IIE Transactions 29 (1997) 1-14
    • (1997) IIE Transactions , vol.29 , pp. 1-14
    • Karabati, S.1    Kouvelis, P.2
  • 10
    • 1842762122 scopus 로고    scopus 로고
    • Approximation schemes for parallel machine scheduling problems with controllable processing times
    • Jansen K., and Mastrolilli M. Approximation schemes for parallel machine scheduling problems with controllable processing times. Computers and Operations Research 31 (2004) 1565-1581
    • (2004) Computers and Operations Research , vol.31 , pp. 1565-1581
    • Jansen, K.1    Mastrolilli, M.2
  • 11
    • 2942731249 scopus 로고    scopus 로고
    • Minimizing the total weighted flow time in a single machine with controllable processing times
    • Shabtay D., and Kaspi M. Minimizing the total weighted flow time in a single machine with controllable processing times. Computers and Operations Research 31 (2004) 2279-2289
    • (2004) Computers and Operations Research , vol.31 , pp. 2279-2289
    • Shabtay, D.1    Kaspi, M.2
  • 13
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • Lee C.Y., and Liman S.D. Single machine flow-time scheduling with scheduled maintenance. Acta Informatica 29 (1992) 375-382
    • (1992) Acta Informatica , vol.29 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2
  • 14
    • 0037411886 scopus 로고    scopus 로고
    • Single machine scheduling with periodic maintenance and nonresumable jobs
    • Liao C.J., and Chen W.J. Single machine scheduling with periodic maintenance and nonresumable jobs. Computers and Operations Research 30 (2003) 1335-1347
    • (2003) Computers and Operations Research , vol.30 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 16
    • 0030263614 scopus 로고    scopus 로고
    • Tool allocation and machining conditions optimization for CNC machines
    • Akturk M.S., and Avci S. Tool allocation and machining conditions optimization for CNC machines. European Journal of Operations Research 94 (1996) 335-348
    • (1996) European Journal of Operations Research , vol.94 , pp. 335-348
    • Akturk, M.S.1    Avci, S.2
  • 17
    • 0026930899 scopus 로고
    • New search spaces for sequencing problems with application to job shop scheduling
    • Storer R.H., Wu S.D., and Vaccari R. New search spaces for sequencing problems with application to job shop scheduling. Management Science 38 (1992) 1495-1509
    • (1992) Management Science , vol.38 , pp. 1495-1509
    • Storer, R.H.1    Wu, S.D.2    Vaccari, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.