메뉴 건너뛰기




Volumn 46, Issue 3, 2007, Pages 198-209

Enhancing sugar cane process performance through optimal production scheduling

Author keywords

Continuous process; Cyclic production and cleaning scheduling; Evaporation; Mathematical programming; Sugar manufacturing

Indexed keywords

CRYSTALLIZATION; EVAPORATION; MATHEMATICAL PROGRAMMING; OPTIMIZATION; PROCESS ENGINEERING;

EID: 33845197555     PISSN: 02552701     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cep.2006.05.015     Document Type: Article
Times cited : (13)

References (15)
  • 1
    • 33845205765 scopus 로고    scopus 로고
    • Overview of planning and scheduling technologies
    • Florianopolis, Brazil
    • Reklaitis G.V. Overview of planning and scheduling technologies. Proceedings of ENPROMER 99. Florianopolis, Brazil (1999)
    • (1999) Proceedings of ENPROMER 99
    • Reklaitis, G.V.1
  • 2
    • 0034112831 scopus 로고    scopus 로고
    • Optimal energy and cleaning management in heat exchanger networks under fouling
    • Part A
    • Georgiadis M.C., and Papageorgiou L.G. Optimal energy and cleaning management in heat exchanger networks under fouling. Trans. IChemE 78 (2000) 168-179 Part A
    • (2000) Trans. IChemE , vol.78 , pp. 168-179
    • Georgiadis, M.C.1    Papageorgiou, L.G.2
  • 3
    • 84985738582 scopus 로고
    • Optimum evaporator cycle with scale formation
    • Epstein N. Optimum evaporator cycle with scale formation. Can. J. Chem. Eng. 57 (1979) 659-661
    • (1979) Can. J. Chem. Eng. , vol.57 , pp. 659-661
    • Epstein, N.1
  • 4
    • 0002548952 scopus 로고
    • Model optimizes exchanger cleaning
    • Casado E. Model optimizes exchanger cleaning. Hydrocarbon Process. 69 8 (1990) 71-76
    • (1990) Hydrocarbon Process. , vol.69 , Issue.8 , pp. 71-76
    • Casado, E.1
  • 5
    • 0030388331 scopus 로고    scopus 로고
    • Reliability-based maintenance strategies for heat exchangers subject to fouling
    • Sheikh A.K., Zubari S.M., Haq M.U., and Budair M.O. Reliability-based maintenance strategies for heat exchangers subject to fouling. Trans. ASME 118 (1996) 306-312
    • (1996) Trans. ASME , vol.118 , pp. 306-312
    • Sheikh, A.K.1    Zubari, S.M.2    Haq, M.U.3    Budair, M.O.4
  • 6
    • 0026108226 scopus 로고
    • MINLP model for cyclic multiproduct scheduling on continuous parallel lines
    • Sahinidis N.V., and Grossmann I.E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Comp. Chem. Eng. 15 (1991) 85-103
    • (1991) Comp. Chem. Eng. , vol.15 , pp. 85-103
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 7
    • 0037092994 scopus 로고    scopus 로고
    • A novel event-driven formulation for short-term scheduling of multipurpose continuous processes
    • Giannelos N.F., and Georgiadis M.C. A novel event-driven formulation for short-term scheduling of multipurpose continuous processes. Ind. Eng. Chem. Res. 41 (2002) 2431-2439
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 2431-2439
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 8
    • 0037193646 scopus 로고    scopus 로고
    • Mixed-integer programming models for the scheduling and operational optimization of multiproduct continuous plants
    • Alle A., and Pinto J.M. Mixed-integer programming models for the scheduling and operational optimization of multiproduct continuous plants. Ind. Eng. Chem. Res. 41 (2002) 2689-2704
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 2689-2704
    • Alle, A.1    Pinto, J.M.2
  • 9
    • 0032115410 scopus 로고    scopus 로고
    • Cyclic scheduling of continuous parallel process units with decaying performance
    • Jain V., and Grossmann I.E. Cyclic scheduling of continuous parallel process units with decaying performance. AIChE J. 44 (1998) 1623-1636
    • (1998) AIChE J. , vol.44 , pp. 1623-1636
    • Jain, V.1    Grossmann, I.E.2
  • 10
    • 0346729992 scopus 로고    scopus 로고
    • A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants
    • Alle A., Papageorgiou L.G., and Pinto J.M. A mathematical programming approach for cyclic production and cleaning scheduling of multistage continuous plants. Comp. Chem. Eng. 28 (2004) 3-15
    • (2004) Comp. Chem. Eng. , vol.28 , pp. 3-15
    • Alle, A.1    Papageorgiou, L.G.2    Pinto, J.M.3
  • 11
    • 0001466684 scopus 로고    scopus 로고
    • Global optimization of MINLP problems in process synthesis and design
    • Adjiman C., Androulakis I.P., and Floudas C.A. Global optimization of MINLP problems in process synthesis and design. Comp.Chem. Eng. 21 (1997) 445-450
    • (1997) Comp.Chem. Eng. , vol.21 , pp. 445-450
    • Adjiman, C.1    Androulakis, I.P.2    Floudas, C.A.3
  • 12
    • 33845187058 scopus 로고    scopus 로고
    • I.E. Grossmann, in: J. Anderson (Ed.), Advances in Chemical Engineering, vol. 23, 1996.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.