메뉴 건너뛰기




Volumn 36, Issue 3, 2003, Pages 213-219

Development of a reference architecture for Benchmarking Service of manufacturing systems

Author keywords

Benchmarking; Modeling; PP C; Remote factory; Scheduling; Simulation

Indexed keywords

BENCHMARKING; MANUFACTURE; MODELS; PRODUCTION CONTROL; SCHEDULING;

EID: 33751504532     PISSN: 14746670     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1016/S1474-6670(17)37759-5     Document Type: Conference Paper
Times cited : (3)

References (23)
  • 1
    • 0003611953 scopus 로고
    • AMICE, 2nd edition. Springer-Verlag, ISBN 0387-56256-7. Berlin
    • AMICE, (1993). CIMOSA - Open System Architecture for CIM. 2nd edition. (Springer-Verlag), ISBN 3-540-56256-7, ISBN 0387-56256-7. Berlin.
    • (1993) CIMOSA - Open System Architecture for CIM
  • 4
    • 0005857230 scopus 로고
    • Modelling of performance measurement systems in manufacturing enterprises
    • Bititci, U. S., (1995). Modelling of Performance Measurement Systems in Manufacturing Enterprises. In: Int. J. Production Economics 42, pp. 137-147.
    • (1995) Int. J. Production Economics , vol.42 , pp. 137-147
    • Bititci, U.S.1
  • 5
    • 0032108249 scopus 로고    scopus 로고
    • Object oriented modeling for flexible manufacturing systems
    • Booth, A. W. (2000). Object Oriented Modeling for Flexible Manufacturing Systems. In: The Journal of Flexible Manufacturing Systems, pp 301-3 14.
    • (2000) The Journal of Flexible Manufacturing Systems , pp. 301-314
    • Booth, A.W.1
  • 6
    • 85056070705 scopus 로고    scopus 로고
    • Business-To-Manufacturing (B2M) collaboration between business and manufacturing using ISA95
    • Nice, France
    • Brandl, D. (2002). Business-To-Manufacturing (B2M) collaboration between business and manufacturing using ISA95. In: Proceedings of the ISA/SEE conference, Nice, France.
    • (2002) Proceedings of the ISA/SEE Conference
    • Brandl, D.1
  • 7
    • 0033732676 scopus 로고    scopus 로고
    • Performance comparison and analysis of reactive and planning-based control architectures for manufacturing
    • Brennan, R. W. (2000). Performance comparison and analysis of reactive and planning-based control architectures for manufacturing. In: Robotics and Computer Integrated Manufacturing, 16, pp. 191-200.
    • (2000) Robotics and Computer Integrated Manufacturing , vol.16 , pp. 191-200
    • Brennan, R.W.1
  • 8
    • 0034298926 scopus 로고    scopus 로고
    • An experimental benchmarking of two multi-agent systems for production scheduling and control
    • Cavalieri, S., M. Taisch, M. Garetti and M. Macchi. (2000). An experimental benchmarking of two multi-agent systems for production scheduling and control. In: Computers in Industry. 43. pp. 139-152
    • (2000) Computers in Industry , vol.43 , pp. 139-152
    • Cavalieri, S.1    Taisch, M.2    Garetti, M.3    Macchi, M.4
  • 10
    • 0034694440 scopus 로고    scopus 로고
    • Multi-agent hybrid shop floor control systems
    • Choi, K. H., S. C. Kim, S. H. Yook (2000). Multi-agent hybrid shop floor control systems. In: Int. J. Production Research, 38, 17, pp. 4193-4203.
    • (2000) Int. J. Production Research , vol.38 , Issue.17 , pp. 4193-4203
    • Choi, K.H.1    Kim, S.C.2    Yook, S.H.3
  • 12
    • 1542388888 scopus 로고    scopus 로고
    • DMSO, U. S. Department of Defence, Internet web site
    • DMSO. (2002). High Level Architecture, U. S. Department of Defence, Internet web site: hla.dmso.mil.
    • (2002) High Level Architecture
  • 14
    • 0002679890 scopus 로고
    • Benchmarks, testbeds, controlled experimentation, and the design of agent architectures
    • Hanks S., M. E. Pollack, P. Cohen (1993). Benchmarks, testbeds, controlled experimentation, and the design of agent architectures. In: Al Magazine. 14 (4) pp. 17-42.
    • (1993) Al Magazine , vol.14 , Issue.4 , pp. 17-42
    • Hanks, S.1    Pollack, M.E.2    Cohen, P.3
  • 18
    • 0042132834 scopus 로고
    • MASCOT: A virtual factory for research and development in manufacturing scheduling and control
    • Parunak, V. D. (1993). MASCOT: A Virtual Factory for Research and Development in Manufacturing Scheduling and Control. In: ITI Tech Memo.
    • (1993) ITI Tech Memo
    • Parunak, V.D.1
  • 20
    • 0031222074 scopus 로고    scopus 로고
    • A framework for classifying flexibility types in manufacturing
    • Shewchuk J. P., C. L. Moodie (1997). A Framework for Classifying Flexibility types in Manufacturing. In: Computers in Industry; 33, pp. 261-269.
    • (1997) Computers in Industry , vol.33 , pp. 261-269
    • Shewchuk, J.P.1    Moodie, C.L.2
  • 21
    • 0030555126 scopus 로고    scopus 로고
    • A survey and taxonomy of strategy-related performance measures for manufacturing
    • White G. P. (1996). A Survey and Taxonomy of Strategy-Related Performance Measures for Manufacturing. In: International Journal of Operations & Production Management, Vol. 16n No. 3, pp. 42-61.
    • (1996) International Journal of Operations & Production Management , vol.16 , Issue.3 , pp. 42-61
    • White, G.P.1
  • 22
    • 0030654346 scopus 로고    scopus 로고
    • An object-oriented integration test-bed for process planning and production scheduling
    • Wiley Interscience
    • Zhang D., H. C. Zhang (1997). An object-oriented integration test-bed for process planning and production scheduling. In: Integrated Computer-Aided Engineering, Vol. 4. No. 4, Wiley Interscience.
    • (1997) Integrated Computer-aided Engineering , vol.4 , Issue.4
    • Zhang, D.1    Zhang, H.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.