메뉴 건너뛰기




Volumn 2005, Issue , 2005, Pages 1-5

The forward contract model of interruptible load in power market

Author keywords

Forward contract; Interruptible load; Power Market; Reliability evaluation

Indexed keywords

FORWARD CONTRACT; INTERRUPTIBLE LOAD; POWER MARKET; RELIABILITY EVALUATION;

EID: 33751366646     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/TDC.2005.1546842     Document Type: Conference Paper
Times cited : (20)

References (6)
  • 1
    • 0032202934 scopus 로고    scopus 로고
    • Simulation of DSM resources as generating units in probabilistic production costing framework
    • IEEE
    • A.S.Malik.: Simulation of DSM Resources as Generating Units in Probabilistic Production Costing Framework. IEEE Trans. on Power System Vol. 13(4). IEEE (1998) 460-465.
    • (1998) IEEE Trans. on Power System , vol.13 , Issue.4 , pp. 460-465
    • Malik, A.S.1
  • 2
    • 84861393478 scopus 로고    scopus 로고
    • Interruptible load management within secondary reserve ancillary service market
    • Porto
    • Le Anh Tuan, Kanbar Bhattacharya.: Interruptible Load Management within Secondary Reserve Ancillary Service Market. IEEE Porto Power Tech Conference. Porto (2001)1-6.
    • (2001) IEEE Porto Power Tech Conference , pp. 1-6
    • Le Anh Tuan1    Bhattacharya, K.2
  • 3
    • 0037505482 scopus 로고    scopus 로고
    • Competitive framework for procurement of interruptible load services
    • IEEE
    • Le Anh Tuan, Kanbar Bhattacharya. Competitive Framework for Procurement of Interruptible Load Services. IEEE Trans. on Power System, Vol. 18(2). IEEE (2003)889-897.
    • (2003) IEEE Trans. on Power System , vol.18 , Issue.2 , pp. 889-897
    • Le Anh Tuan1    Bhattacharya, K.2
  • 4
    • 33746501326 scopus 로고    scopus 로고
    • The interruptible load operation in power market and interim system
    • Nanjin
    • Wang Jianxue, Wang Xifan, Zhang Xian, et al The interruptible load operation in power market and interim system. Electric Power Automation Equipment, Vol. 24(6). Nanjin(2004) 1-5.
    • (2004) Electric Power Automation Equipment , vol.24 , Issue.6 , pp. 1-5
    • Wang, J.1    Wang, X.2    Zhang, X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.