메뉴 건너뛰기




Volumn 31, Issue 3-4, 2006, Pages 278-282

Investment model development for repetitive inspections and measurement equipment in imperfect production systems

Author keywords

Investment; Measurement error; Repetitive inspections

Indexed keywords

COST ACCOUNTING; CUSTOMER SATISFACTION; INSPECTION; MARKETING; MEASUREMENT ERRORS; PRODUCTION ENGINEERING;

EID: 33751087187     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0206-7     Document Type: Article
Times cited : (12)

References (10)
  • 1
    • 6244277856 scopus 로고
    • The effect of measurement error on accept/reject probabilities for homogeneous products
    • Basnet C, Case KE (1992) The effect of measurement error on accept/reject probabilities for homogeneous products. Qual Eng 4:383-393
    • (1992) Qual Eng , vol.4 , pp. 383-393
    • Basnet, C.1    Case, K.E.2
  • 2
    • 0033099395 scopus 로고    scopus 로고
    • Multi-stage lot sizing models with imperfect processes and inspection errors
    • Ben-Daya M, Rahim A (1999) Multi-stage lot sizing models with imperfect processes and inspection errors. Prod Plan Control 10:118-126
    • (1999) Prod Plan Control , vol.10 , pp. 118-126
    • Ben-Daya, M.1    Rahim, A.2
  • 4
    • 0000628123 scopus 로고    scopus 로고
    • Optimization of process improvement and inspection location for serial manufacturing
    • Deliman NC, Feldman RM (1996) Optimization of process improvement and inspection location for serial manufacturing. Int J Prod Res 34:395-405
    • (1996) Int J Prod Res , vol.34 , pp. 395-405
    • Deliman, N.C.1    Feldman, R.M.2
  • 5
    • 33751090181 scopus 로고    scopus 로고
    • Repetitive testing strategies when the testing process is imperfect
    • Ding J, Greenberg B, Matsuo H (1998) Repetitive testing strategies when the testing process is imperfect. Manage Sci 40:898-902
    • (1998) Manage Sci , vol.40 , pp. 898-902
    • Ding, J.1    Greenberg, B.2    Matsuo, H.3
  • 6
    • 0030195589 scopus 로고    scopus 로고
    • Impact of inspection errors on performance measures of a complete repeat inspection plan
    • Duffuaa SO (1996) Impact of inspection errors on performance measures of a complete repeat inspection plan. Int J Prod Res 34:2035-2049
    • (1996) Int J Prod Res , vol.34 , pp. 2035-2049
    • Duffuaa, S.O.1
  • 7
    • 0031245747 scopus 로고    scopus 로고
    • Evaluating a well-known criterion for measurement precision
    • Engel J, Vries BD (1997) Evaluating a well-known criterion for measurement precision. J Qual Tech 29:469-476
    • (1997) J Qual Tech , vol.29 , pp. 469-476
    • Engel, J.1    Vries, B.D.2
  • 9
    • 0031237390 scopus 로고    scopus 로고
    • Optimal batch size and investment in multistage production systems with scrap
    • Lee HH, Chandra MJ, Deleveaux VJ (1997) Optimal batch size and investment in multistage production systems with scrap. Prod Plan Control 8:586-596
    • (1997) Prod Plan Control , vol.8 , pp. 586-596
    • Lee, H.H.1    Chandra, M.J.2    Deleveaux, V.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.