-
1
-
-
0034672915
-
Cycle time reduction by improved MRP-based production planning
-
Agrawal, A., Minis, I. and Nagi, R., Cycle time reduction by improved MRP-based production planning. Int. J. Prod, Res., 2000, 38, 4823-4841.
-
(2000)
Int. J. Prod, Res.
, vol.38
, pp. 4823-4841
-
-
Agrawal, A.1
Minis, I.2
Nagi, R.3
-
2
-
-
0031189321
-
Finite-capacity scheduling-based planning for revenue-based capacity management
-
Akkan, C., Finite-capacity scheduling-based planning for revenue-based capacity management. Eur. J. Opl. Res., 1997, 100, 170-179.
-
(1997)
Eur. J. Opl. Res.
, vol.100
, pp. 170-179
-
-
Akkan, C.1
-
3
-
-
0031621768
-
A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling and pull
-
Baker, A.D., A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling and pull. J. Mfg Systems, 1998, 17, 297-320.
-
(1998)
J. Mfg Systems
, vol.17
, pp. 297-320
-
-
Baker, A.D.1
-
5
-
-
0028464872
-
An approach to real-time flexible scheduling
-
Chryssolouris, G. and Lee, M., An approach to real-time flexible scheduling. Int. J. Flexible Mfg Systems, 1994, 6, 235-253.
-
(1994)
Int. J. Flexible Mfg Systems
, vol.6
, pp. 235-253
-
-
Chryssolouris, G.1
Lee, M.2
-
6
-
-
0030241634
-
Finite capacity scheduling systems: Performance issues and comparisons
-
Enns, S.T., Finite capacity scheduling systems: performance issues and comparisons. Comput. Ind. Engng, 1996, 30, 727-739.
-
(1996)
Comput. Ind. Engng
, vol.30
, pp. 727-739
-
-
Enns, S.T.1
-
7
-
-
0035501179
-
An integrated MRP and JIT framework
-
Ho, J.C. and Chang, Y.L., An integrated MRP and JIT framework. Comput. Ina. Engng, 2001, 41, 173-185.
-
(2001)
Comput. Ina. Engng
, vol.41
, pp. 173-185
-
-
Ho, J.C.1
Chang, Y.L.2
-
8
-
-
0043190068
-
Scheduling in an automated flow shop to minimize cost: Backward-meta scheduling method
-
Kawtummachai, R., Yanagawa, Y., Ohashi, K. and Miyazaki, S., Scheduling in an automated flow shop to minimize cost: backward-meta scheduling method. Int. J. Prod, Econ., 1997, 49, 225-235.
-
(1997)
Int. J. Prod, Econ.
, vol.49
, pp. 225-235
-
-
Kawtummachai, R.1
Yanagawa, Y.2
Ohashi, K.3
Miyazaki, S.4
-
9
-
-
0037109635
-
Robust scheduling in an advanced planning and scheduling environment
-
Kuroda, M., Shin, H. and Zinnohara, A., Robust scheduling in an advanced planning and scheduling environment. Int. J. Prod. Rex., 2002, 40, 3655-3668.
-
(2002)
Int. J. Prod. Rex.
, vol.40
, pp. 3655-3668
-
-
Kuroda, M.1
Shin, H.2
Zinnohara, A.3
-
10
-
-
0032183949
-
Dispatching rules for stochastic finite capacity scheduling
-
Liu, K.-C., Dispatching rules for stochastic finite capacity scheduling. Comput. Ind. Engng., 1998, 35, 113-116.
-
(1998)
Comput. Ind. Engng.
, vol.35
, pp. 113-116
-
-
Liu, K.-C.1
-
11
-
-
0142185298
-
An investigation on single machine total weighted tardiness scheduling problems
-
Maheswaran, R. and Ponnambalam, S.G., An investigation on single machine total weighted tardiness scheduling problems. Int. J. of Advd Mfg Technol., 2003, 22, 243-248.
-
(2003)
Int. J. of Advd Mfg Technol.
, vol.22
, pp. 243-248
-
-
Maheswaran, R.1
Ponnambalam, S.G.2
-
12
-
-
27544441566
-
An intensive search algorithm for single-machine total-weighted-tardiness scheduling problems
-
Maheswaran, R. and Ponnambalam, S.G., An intensive search algorithm for single-machine total-weighted-tardiness scheduling problems. Int. J. Advd Mfg Technology, 2004, 26, 1150-1156.
-
(2004)
Int. J. Advd Mfg Technology
, vol.26
, pp. 1150-1156
-
-
Maheswaran, R.1
Ponnambalam, S.G.2
-
13
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flowshops and jobshops
-
Rajendran, C. and Holthaus, O., A comparative study of dispatching rules in dynamic flowshops and jobshops. Eur. J. Opl Res., 1999, 116, 156-170.
-
(1999)
Eur. J. Opl Res.
, vol.116
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
14
-
-
1642329972
-
An integrated model for order release and due-date demand management
-
Saad, S.M., Picket, N. and Kittiaram, K., An integrated model for order release and due-date demand management. J. Mfg Technol. Mgmt, 2004, 15, 76-89.
-
(2004)
J. Mfg Technol. Mgmt
, vol.15
, pp. 76-89
-
-
Saad, S.M.1
Picket, N.2
Kittiaram, K.3
-
15
-
-
33750528318
-
Dynamic production planning and rescheduling for complex assemblies
-
Cambridge, UK, April
-
Song, D.P., Hicks, C. and Earl, C.F., Dynamic production planning and rescheduling for complex assemblies. Manufacturing Complexity Network Conference, Cambridge, UK, April 2002.
-
(2002)
Manufacturing Complexity Network Conference
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
16
-
-
0003929853
-
-
Irwin/McGraw-Hill: New York
-
Vollmann, T.E., Berry, W.L. and Whybark, D.C., Manufacturing Planning and Control Systems, 4th Edition, 1997 (Irwin/McGraw-Hill: New York).
-
(1997)
Manufacturing Planning and Control Systems, 4th Edition
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
-
17
-
-
0031331284
-
A simulation-based backward planning approach for order-release
-
7-10 December, IEEE Press, New Jersey
-
Watson, E.F., Medeiros, D.J. and Sadowski, R.P., A simulation-based backward planning approach for order-release. Proceedings of the 1997 Winter Simulation Conference, 7-10 December 1997, IEEE Press, New Jersey, pp. 765-772.
-
(1997)
Proceedings of the 1997 Winter Simulation Conference
, pp. 765-772
-
-
Watson, E.F.1
Medeiros, D.J.2
Sadowski, R.P.3
-
18
-
-
0031115735
-
A review of the applicability of or and AI scheduling techniques in practice
-
Wiers, V.C.S., A review of the applicability of OR and AI scheduling techniques in practice. Omega Int. J. Mgmt Sci., 1997, 25, 145-153.
-
(1997)
Omega Int. J. Mgmt Sci.
, vol.25
, pp. 145-153
-
-
Wiers, V.C.S.1
-
19
-
-
0031075464
-
A fast finite loading algorithm for job oriented scheduling
-
Yeh, C.-H., A fast finite loading algorithm for job oriented scheduling. Comput. Opl Res., 1997, 24, 193-198.
-
(1997)
Comput. Opl Res.
, vol.24
, pp. 193-198
-
-
Yeh, C.-H.1
-
20
-
-
0035309617
-
Scheduling single-machine problems for on-time delivery
-
Yoo, W.-S. and Martin-Vega, L.A., Scheduling single-machine problems for on-time delivery. Comput. Ind. Engng, 2001, 39, 371-392.
-
(2001)
Comput. Ind. Engng
, vol.39
, pp. 371-392
-
-
Yoo, W.-S.1
Martin-Vega, L.A.2
|