-
1
-
-
85029880011
-
-
Australian Road Research Board, Melbourne, Australia
-
Akçelik R. Traffic Signals: Capacity and Timing Analysis. Research Report 123 (1981), Australian Road Research Board, Melbourne, Australia
-
(1981)
Research Report 123
-
-
Akçelik, R.1
-
2
-
-
0023983095
-
The highway capacity manual delay formula for signalized intersections
-
Akçelik R. The highway capacity manual delay formula for signalized intersections. ITE Journal 6 (1988) 23-27
-
(1988)
ITE Journal
, vol.6
, pp. 23-27
-
-
Akçelik, R.1
-
3
-
-
85029857426
-
-
Atalay, A., 2004. Comparison of vehicle delay models with artificial intelligence methods. M.Sc. Dissertation, Institute of Natural and Applied Sciences, Ataturk University, Erzurum, Turkey, 119p (in Turkish).
-
-
-
-
4
-
-
85029893844
-
-
Başkan, O., 2004. Modelling average vehicle delays at isolated signalized intersections using Artificial Neural Networks. M.Sc. Dissertation, Institute of Natural and Applied Sciences, Pamukkale University, Denizli, Turkey, 108p (in Turkish).
-
-
-
-
5
-
-
0024749189
-
A note on traffic delay formulas
-
Burrow I. A note on traffic delay formulas. ITE Journal (1989) 29-32
-
(1989)
ITE Journal
, pp. 29-32
-
-
Burrow, I.1
-
6
-
-
0035372068
-
An object-oriented neural network approach to short term traffic forecasting
-
Dia H. An object-oriented neural network approach to short term traffic forecasting. European Journal of Operation Research 131 (2001) 253-261
-
(2001)
European Journal of Operation Research
, vol.131
, pp. 253-261
-
-
Dia, H.1
-
7
-
-
33746231453
-
Comparison of delay estimates at under-saturated and over-saturated pre-timed signalized intersections
-
Dion F., Rakha H., and Kang Y.S. Comparison of delay estimates at under-saturated and over-saturated pre-timed signalized intersections. Transportation Research Part B 37 (2003) 1-24
-
(2003)
Transportation Research Part B
, vol.37
, pp. 1-24
-
-
Dion, F.1
Rakha, H.2
Kang, Y.S.3
-
9
-
-
13944257687
-
Artificial neural network based modelling of variable valve-timing in a spark-ignition engine
-
Golcu M., Sekmen Y., Erduranli{dotless} P., and Salman M.S. Artificial neural network based modelling of variable valve-timing in a spark-ignition engine. Applied Energy 81 (2005) 187-197
-
(2005)
Applied Energy
, vol.81
, pp. 187-197
-
-
Golcu, M.1
Sekmen, Y.2
Erduranli, P.3
Salman, M.S.4
-
10
-
-
3242764614
-
Application of adaptive neuro-fuzzy inference system for detection of electrocardiographic changes in patients with partial epilepsy using feature extraction
-
Guler I., and Ubeyli E.D. Application of adaptive neuro-fuzzy inference system for detection of electrocardiographic changes in patients with partial epilepsy using feature extraction. Expert Systems with Applications 27 (2004) 323-330
-
(2004)
Expert Systems with Applications
, vol.27
, pp. 323-330
-
-
Guler, I.1
Ubeyli, E.D.2
-
12
-
-
0026925677
-
Self-learning fuzzy controllers based on temporal backpropagation
-
Jang J.-S.R. Self-learning fuzzy controllers based on temporal backpropagation. IEEE Transactions on Neural Networks 3 5 (1992) 714-723
-
(1992)
IEEE Transactions on Neural Networks
, vol.3
, Issue.5
, pp. 714-723
-
-
Jang, J.-S.R.1
-
15
-
-
0346103835
-
Trip distribution modeling using fuzzy logic and a genetic algorithm
-
Kalic M., and Teodorovic D. Trip distribution modeling using fuzzy logic and a genetic algorithm. Transportation Planning and Technology 26 3 (2003) 213-238
-
(2003)
Transportation Planning and Technology
, vol.26
, Issue.3
, pp. 213-238
-
-
Kalic, M.1
Teodorovic, D.2
-
16
-
-
85029868855
-
A new approach in process control: fuzzy logic
-
(in Turkish)
-
Kaynak O., and Armagan G. A new approach in process control: fuzzy logic. Journal of Automation July-August (1992) 74-82 (in Turkish)
-
(1992)
Journal of Automation
, Issue.July-August
, pp. 74-82
-
-
Kaynak, O.1
Armagan, G.2
-
17
-
-
0022925147
-
Time-dependent queuing at road junctions: observation and prediction
-
Kimber R.M., and Daly P.N. Time-dependent queuing at road junctions: observation and prediction. Transportation Research Part B 20B (1986) 187-203
-
(1986)
Transportation Research Part B
, vol.20 B
, pp. 187-203
-
-
Kimber, R.M.1
Daly, P.N.2
-
19
-
-
85029845827
-
-
Murat, Y.S., 1999. Prediction of traffic volumes in Bosphorus bridge using artificial neural networks. In: Proceedings of the 11th Mini-EURO Conference on Artificial Intelligence in Transportation Systems and Science, and The 7th EURO-Working Group Meeting on Transportation, Helsinki University of Technology Espoo, Finland, pp. 43-47.
-
-
-
-
21
-
-
85029832732
-
-
Osuna, R.G., 2002. CS790: Selected Topics in Computer Science, Lecture Notes, Texas A&M University.
-
-
-
-
22
-
-
0034512593
-
-
Ouyang, C.S., Lee, S.J., 2000. A hybrid algorithm for structure identification of neuro-fuzzy modeling. In: Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, Nashville, Tennessee, 8-11 October 2000, pp. 3611-3616.
-
-
-
-
24
-
-
85029844233
-
-
Powell, J.L., 1998. Field Measurement of Signalized Intersection Delay for 1997 Update of the Highway Capacity Manual. Transportation Research Record, Paper No:1416.
-
-
-
-
25
-
-
5844350994
-
Comparison of 1985 and 1994 HCM: Signalized intersection delay estimates
-
Prevedeorus P.D., and Koga C.A. Comparison of 1985 and 1994 HCM: Signalized intersection delay estimates. ITE Journal (1996) 26-30
-
(1996)
ITE Journal
, pp. 26-30
-
-
Prevedeorus, P.D.1
Koga, C.A.2
-
28
-
-
85029868950
-
-
Robertson, D.I., 1969. TRANSYT: a traffic network study tool, RRL Report, LR 253, Transport and Road Research Laboratory, Crowthorne.
-
-
-
-
30
-
-
0030395071
-
-
Rong, L., Wang, Z., 1996. An algorithm of extracting fuzzy rules directly from numerical examples by using FNN. In: Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, Beijing, China, 14-17 October 1996, pp. 1067-1072.
-
-
-
-
33
-
-
0035746937
-
-
Teodorović, D., Lucic, P., Popovic, J., Kikuchi, S., Stanic, B., 2001. Intelligent isolated intersection. In: Proceedings of the 10th IEEE International Conference on Fuzzy Systems, Melbourne, Australia, 2-5 December, pp. 276 -279.
-
-
-
-
34
-
-
85029829197
-
-
TRB, 1965. Special Report 209, Highway Capacity Manual, Transportation Research Board, National Research Council, Washington, DC, USA.
-
-
-
-
35
-
-
85029864697
-
-
TRB, 1985. Special Report 209, Highway Capacity Manual, Transportation Research Board, National Research Council, Washington, DC, USA.
-
-
-
-
36
-
-
85029835947
-
-
TRB, 1997. Special Report 209, Highway Capacity Manual, Transportation Research Board, National Research Council, Washington, DC, USA.
-
-
-
-
37
-
-
85029872423
-
-
TRB, 2000. Special Report 209, Highway Capacity Manual, Transportation Research Board, National Research Council, Washington, DC, USA.
-
-
-
-
39
-
-
0036496380
-
Signalized intersection delay estimation: case study comparison of TRANSYT-7F, Synchro and HCS
-
Washburn S.S., and Larson N. Signalized intersection delay estimation: case study comparison of TRANSYT-7F, Synchro and HCS. ITE Journal (2002) 30-35
-
(2002)
ITE Journal
, pp. 30-35
-
-
Washburn, S.S.1
Larson, N.2
-
40
-
-
85029834502
-
-
Webster, F.V., 1958. Traffic Signal Settings, Road Research Technical Paper, No. 39, Road Research Laboratory, Her Majesty Stationary Office, London, UK.
-
-
-
|