메뉴 건너뛰기




Volumn 176, Issue 2, 2007, Pages 809-818

Necessary and sufficient conditions of optimality for some classical scheduling problems

Author keywords

Critical jobs; Optimality characterization; Partial order; Scheduling problems

Indexed keywords

CRITICAL JOBS; OPTIMALITY CHARACTERIZATION; PARTIAL ORDER; SCHEDULING PROBLEMS;

EID: 33749545026     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.09.017     Document Type: Article
Times cited : (20)

References (9)
  • 2
    • 0002957133 scopus 로고    scopus 로고
    • A review of machine scheduling: complexity, algorithms and approximability
    • Du D.Z., and Pardalos P.M. (Eds), Kluwer Academic Publishers, Dordrecht
    • Chen B., Potts C.N., and Woeginger G.J. A review of machine scheduling: complexity, algorithms and approximability. In: Du D.Z., and Pardalos P.M. (Eds). Handbook of Combinatorial Optimization (1998), Kluwer Academic Publishers, Dordrecht 21-169
    • (1998) Handbook of Combinatorial Optimization , pp. 21-169
    • Chen, B.1    Potts, C.N.2    Woeginger, G.J.3
  • 3
    • 0010916439 scopus 로고
    • Recent results in the theory of machine scheduling
    • Bachem A., et al. (Ed), Springer-Verlag, Berlin
    • Lawler E.L. Recent results in the theory of machine scheduling. In: Bachem A., et al. (Ed). Mathematical Programming-The State of the Art (1983), Springer-Verlag, Berlin 202-234
    • (1983) Mathematical Programming-The State of the Art , pp. 202-234
    • Lawler, E.L.1
  • 5
    • 33749583018 scopus 로고    scopus 로고
    • Properly weighted independence systems and applications to scheduling problems
    • Lin Y., and Deng J. Properly weighted independence systems and applications to scheduling problems. OR Transactions 1 2 (1997) 41-47
    • (1997) OR Transactions , vol.1 , Issue.2 , pp. 41-47
    • Lin, Y.1    Deng, J.2
  • 6
    • 33749552849 scopus 로고    scopus 로고
    • On the structure of all optimal solutions of the two-machine flowshop scheduling problem
    • Lin Y., and Deng J. On the structure of all optimal solutions of the two-machine flowshop scheduling problem. OR Transactions 3 2 (1999) 10-20
    • (1999) OR Transactions , vol.3 , Issue.2 , pp. 10-20
    • Lin, Y.1    Deng, J.2
  • 8
    • 33749554538 scopus 로고    scopus 로고
    • I. Rival, New directions of order, a lecture in Symposium of Combinatorial Optimization, Wuhan, China, 1985.
  • 9
    • 0012277367 scopus 로고    scopus 로고
    • Augmentations of consistent partial orders for the one-machine total tardiness problem
    • Yu W. Augmentations of consistent partial orders for the one-machine total tardiness problem. Discrete Applied Mathematics 68 (1996) 189-202
    • (1996) Discrete Applied Mathematics , vol.68 , pp. 189-202
    • Yu, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.