메뉴 건너뛰기




Volumn 9, Issue 1, 2006, Pages 53-58

Concurrent deployment of flexible production systems for final assembly

Author keywords

Assembly Line Commissioning; Electronic Equipment Manufacture; Flexible Manufacturing Systems; Manufacturing Automation; Manufacturing Automation Software; Message Systems

Indexed keywords

COMMUNICATION SYSTEMS; COMPUTER SIMULATION; ELECTRONIC EQUIPMENT MANUFACTURE; FLEXIBLE MANUFACTURING SYSTEMS; MARKETING;

EID: 33749417615     PISSN: 15362639     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (6)
  • 3
    • 33749385300 scopus 로고    scopus 로고
    • Online, May
    • http://www.fis.marc.gatech.edu/framework/demospilots.html, (Online, May 2006).
    • (2006)
  • 4
    • 33749391361 scopus 로고    scopus 로고
    • Online, May
    • http://webstds.ipc.org/, (Online, May 2006).
    • (2006)
  • 5
    • 28444441149 scopus 로고    scopus 로고
    • Advances in shop floor equipment communication standards for final assembly and packaging
    • March 29-April 2
    • Tuokko R., Siltala, N. and J. L. Martinez Lastra, 2003, "Advances in Shop Floor Equipment Communication Standards for Final Assembly and Packaging," The 4th Annual APEX Conference, March 29-April 2.
    • (2003) The 4th Annual APEX Conference
    • Tuokko, R.1    Siltala, N.2    Lastra, J.L.M.3
  • 6
    • 0036319465 scopus 로고    scopus 로고
    • Software debugging, testing, and verification
    • Hailpern B. and P. Santhanam, 2002, "Software Debugging, Testing, and Verification," IBM Systems Journal, 41(1), 4-12.
    • (2002) IBM Systems Journal , vol.41 , Issue.1 , pp. 4-12
    • Hailpern, B.1    Santhanam, P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.