메뉴 건너뛰기




Volumn 54, Issue 2, 2006, Pages 141-162

Performance analysis of single stage kanban controlled production systems using parametric decomposition

Author keywords

Closed queuing networks; Fork join stations; Kanban systems; Parametric decomposition; Performance analysis; Two moment approximation

Indexed keywords

CLOSED QUEUING NETWORK; KANBAN SYSTEM; PARAMETRIC DECOMPOSITION; PERFORMANCE ANALYSIS; TWO-MOMENT APPROXIMATION;

EID: 33749370438     PISSN: 02570130     EISSN: 15729443     Source Type: Journal    
DOI: 10.1007/s11134-006-9396-4     Document Type: Article
Times cited : (41)

References (26)
  • 1
    • 0034633396 scopus 로고    scopus 로고
    • Approximate analysis of production systems operated by a CONWIP/Finite buffer hybrid control policy
    • A.M. Bonvik, Y. Dallery, and S.B. Gershwin, Approximate analysis of production systems operated by a CONWIP/Finite buffer hybrid control policy. International Journal of Production Research 38(13) (2000) 2845-2869.
    • (2000) International Journal of Production Research , vol.38 , Issue.13 , pp. 2845-2869
    • Bonvik, A.M.1    Dallery, Y.2    Gershwin, S.B.3
  • 3
    • 0029774986 scopus 로고    scopus 로고
    • An analytical method for performance evaluation of kanban controlled production systems
    • M. Di Mascolo, Y. Frein, and Y. Dallery, An analytical method for performance evaluation of kanban controlled production systems. Operations Research 44(1) (1996) 50-64.
    • (1996) Operations Research , vol.44 , Issue.1 , pp. 50-64
    • Di Mascolo, M.1    Frein, Y.2    Dallery, Y.3
  • 4
    • 0029509787 scopus 로고
    • Performance evaluation of kanban multiple-product production systems
    • (Cat. No. 95TH8056) IEEE Computing Society Press, Los Alamitos, CA, USA, +709+603+
    • C. Duri, Y. Frein, and M. Di Mascolo, Performance evaluation of kanban multiple-product production systems. In Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation ETFA'95 (Cat. No. 95TH8056) (IEEE Computing Society Press, Los Alamitos, CA, USA, 1995) vol. 3(xi+709+603+580) pp. 557-566.
    • (1995) Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory Automation ETFA'95 , vol.3 , Issue.11-580 , pp. 557-566
    • Duri, C.1    Frein, Y.2    Di Mascolo, M.3
  • 5
    • 0030284535 scopus 로고    scopus 로고
    • Analysis of production control systems kanban and CONWIP
    • S. Gstettner and H. Kuhn, Analysis of production control systems kanban and CONWIP. International Journal of Production Research 34(11) (1996) 3253-3273.
    • (1996) International Journal of Production Research , vol.34 , Issue.11 , pp. 3253-3273
    • Gstettner, S.1    Kuhn, H.2
  • 10
    • 0036643308 scopus 로고    scopus 로고
    • A decomposition method for MultiProduct kanban systems with setup times and lost sales
    • G.N. Kreig and H. Kuhn, A decomposition method for MultiProduct kanban systems with setup times and lost sales. IIE Transactions 34 (2002) 613-625.
    • (2002) IIE Transactions , vol.34 , pp. 613-625
    • Kreig, G.N.1    Kuhn, H.2
  • 12
    • 33749346598 scopus 로고    scopus 로고
    • Two-moment approximations for the variability parameter of the departure process from a Fork/Join station with general inputs
    • Department of Industrial Engineering, University of Wisconsin-Madison
    • A. Krishnamurthy, R. Suri, and M. Vernon, Two-Moment approximations for the variability parameter of the departure process from a Fork/Join station with general inputs. Technical Report, Department of Industrial Engineering, University of Wisconsin-Madison (2002).
    • (2002) Technical Report
    • Krishnamurthy, A.1    Suri, R.2    Vernon, M.3
  • 13
    • 20244373044 scopus 로고    scopus 로고
    • Two-Moment approximations for throughput and mean queue length of a Fork/Join station with general input processes
    • J.G. Shanthikumar, D.D. Yao and W.H.M. Zijm (eds.), International Series in Operations Research and Management Science Kluwer Academic Publishers
    • A. Krishnamurthy, R. Suri, and M. Vernon, Two-Moment approximations for throughput and mean queue length of a Fork/Join station with general input processes. In Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains, J.G. Shanthikumar, D.D. Yao and W.H.M. Zijm (eds.), International Series in Operations Research and Management Science (Kluwer Academic Publishers, 2003) 87-126.
    • (2003) Stochastic Modeling and Optimization of Manufacturing Systems and Supply Chains , pp. 87-126
    • Krishnamurthy, A.1    Suri, R.2    Vernon, M.3
  • 14
    • 4043104867 scopus 로고    scopus 로고
    • Analysis of a Fork/Join station with inputs from coxian servers in a closed queuing network
    • A. Krishnamurthy, R. Suri, and M. Vernon, Analysis of a Fork/Join station with inputs from coxian servers in a closed queuing network. Annals of Operations Research 25 (2004) 69-94.
    • (2004) Annals of Operations Research , vol.25 , pp. 69-94
    • Krishnamurthy, A.1    Suri, R.2    Vernon, M.3
  • 15
    • 0018286765 scopus 로고
    • Approximate analysis of general queuing networks by decomposition
    • P.J. Kuehn, Approximate analysis of general queuing networks by decomposition. IEEE Transactions on Communications COM-27, (1979) 113-126.
    • (1979) IEEE Transactions on Communications , vol.COM-27 , pp. 113-126
    • Kuehn, P.J.1
  • 17
    • 0000500589 scopus 로고
    • Some inequalities in queuing
    • K.T. Marshall, Some inequalities in queuing. Operations Research 16 (1968) 651-665.
    • (1968) Operations Research , vol.16 , pp. 651-665
    • Marshall, K.T.1
  • 18
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines, II: Stochastic Demands
    • D. Mitra and I. Mitrani, Analysis of a kanban discipline for cell coordination in production lines, II: Stochastic Demands. Operations Research 39 (1991) 807-823.
    • (1991) Operations Research , vol.39 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 19
    • 0029288358 scopus 로고
    • A comparison of alternative kanban control mechanisms, ii. experiments results
    • J.A. Muckstadt and S.R. Tayur, A comparison of alternative kanban control mechanisms, ii. experiments results. IIE Transactions 25 (1995) 151-161.
    • (1995) IIE Transactions , vol.25 , pp. 151-161
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 20
    • 84873002791 scopus 로고    scopus 로고
    • www.promodel.com.
  • 23
    • 21844517678 scopus 로고
    • From CAN-Q to MPX: Evolution of queuing software for manufacturing
    • R. Suri, G.W. Diehl, S. deTreville, and M. Tomsicek, From CAN-Q to MPX: Evolution of queuing software for manufacturing. Interfaces 25(5) (1995) 128-150.
    • (1995) Interfaces , vol.25 , Issue.5 , pp. 128-150
    • Suri, R.1    Diehl, G.W.2    Detreville, S.3    Tomsicek, M.4
  • 24
    • 0020848139 scopus 로고
    • The queuing network analyzer
    • W. Whitt, The Queuing Network Analyzer. Bell Systems Technical Journal 62 (1983) 2779-2815.
    • (1983) Bell Systems Technical Journal , vol.62 , pp. 2779-2815
    • Whitt, W.1
  • 25
    • 0021616319 scopus 로고
    • Approximations to departure processes and queues in series
    • W. Whitt, Approximations to departure processes and queues in series. Naval Research Logistics Quarterly 31 (1984) 499-521.
    • (1984) Naval Research Logistics Quarterly , vol.31 , pp. 499-521
    • Whitt, W.1
  • 26
    • 0038619619 scopus 로고    scopus 로고
    • The performance of a new material control and replenishment system: A simulation and comparative study
    • R. Suri (ed.) Society of Manufacturing Engineers, Dearborn, MI
    • X. Zhou and P.B. Luh, The performance of a new material control and replenishment system: a simulation and comparative study. In Proceedings of the Quick Response Manufacturing 2000 Conference, R. Suri (ed.) (Society of Manufacturing Engineers, Dearborn, MI, 2000), pp. 807-826.
    • (2000) Proceedings of the Quick Response Manufacturing 2000 Conference , pp. 807-826
    • Zhou, X.1    Luh, P.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.