-
1
-
-
0032258584
-
Simulation analysis of a manufacturing supply chain
-
Bhaskaran, S., (1998), Simulation analysis of a manufacturing supply chain, Decision Science 29(3):663-657.
-
(1998)
Decision Science
, vol.29
, Issue.3
, pp. 657-663
-
-
Bhaskaran, S.1
-
2
-
-
33749365420
-
Det som taler for at verden har nådd grenser - Mer presist at nåværende produksjonsvekst i den globale økonomien ikke kan opprettholdes
-
Goodland, R., Daly, H., Serafy, S.E, von Droste, B. ed., J.W. Cappelen Forlag
-
Goodland, R., (1991), Det som taler for at verden har nådd grenser - mer presist at nåværende produksjonsvekst i den globale økonomien ikke kan opprettholdes, in 'Økonomisk Politikk for en Bærekraftig Utvikling: Oppfølging av Brundtlandkommisjonen', Goodland, R., Daly, H., Serafy, S.E, von Droste, B. ed., J.W. Cappelen Forlag, pp. 1-14.
-
(1991)
'Økonomisk Politikk for En Bærekraftig Utvikling: Oppfølging Av Brundtlandkommisjonen'
, pp. 1-14
-
-
Goodland, R.1
-
3
-
-
0031276763
-
'Green' value chain practices in the furniture industry
-
Handfield, R.B., Waltor, S.V., Seegers, L.K., Melnyk, S.A., (1997), 'Green' value chain practices in the furniture industry. Journal of Operations Management, 15:293-315.
-
(1997)
Journal of Operations Management
, vol.15
, pp. 293-315
-
-
Handfield, R.B.1
Waltor, S.V.2
Seegers, L.K.3
Melnyk, S.A.4
-
4
-
-
0032045931
-
Logistics simulation of recycling networks
-
Hirsch, B.E., Kuhlmann, T., Schumacher, J., 1998, Logistics simulation of recycling networks, Compters in Industry, 36:31-38.
-
(1998)
Compters in Industry
, vol.36
, pp. 31-38
-
-
Hirsch, B.E.1
Kuhlmann, T.2
Schumacher, J.3
-
5
-
-
0033895012
-
Disassembly sequence and cost analysis for electromechanical products
-
Kuo, T.C., (2000), Disassembly sequence and cost analysis for electromechanical products, Robotics and Computer Integrated Manufacturing, 16:43-54.
-
(2000)
Robotics and Computer Integrated Manufacturing
, vol.16
, pp. 43-54
-
-
Kuo, T.C.1
-
6
-
-
0036721661
-
Determining optimum disassembly sequences in electronic equipment
-
Lambert, A.J.D., (2002), Determining optimum disassembly sequences in electronic equipment. Computer & Industrial Engineering, 43:553-575.
-
(2002)
Computer & Industrial Engineering
, vol.43
, pp. 553-575
-
-
Lambert, A.J.D.1
-
7
-
-
83455176876
-
Landfill Technology
-
Luleå university of technology, department of environmental engineering, division of waste science & technology
-
Lagerkvist, A., (2001), Landfill Technology, Luleå university of technology, department of environmental engineering, division of waste science & technology.
-
(2001)
-
-
Lagerkvist, A.1
-
8
-
-
0007583292
-
Basics of Solid and Hazardous Waste Management Technology
-
Prentice Hall
-
Shah, K.L., (2000), Basics of Solid and Hazardous Waste Management Technology, Prentice Hall
-
(2000)
-
-
Shah, K.L.1
-
9
-
-
0032668519
-
Application of a design-forremanufacturing framework to the selection of product life-cycle fastening and joining methods
-
Shu, L.H., Flowers, W.C., (1999), Application of a design-forremanufacturing framework to the selection of product life-cycle fastening and joining methods, Robotics and Computer-integrated Manufacturing, 15:179-190.
-
(1999)
Robotics and Computer-integrated Manufacturing
, vol.15
, pp. 179-190
-
-
Shu, L.H.1
Flowers, W.C.2
-
10
-
-
0032298965
-
Cleaner production: Profit for future generations
-
Vlavianos-arvanitis, A., (1998), Cleaner production: Profit for future generations, Journal of Cleaner Production, 6:381-385.
-
(1998)
Journal of Cleaner Production
, vol.6
, pp. 381-385
-
-
Vlavianos-Arvanitis, A.1
|